Home / Browse projects / Mumbai Suburban, Maharashtra / REDEVELOPMENT OF JAMUNA MAHAL CHSL
REDEVELOPMENT OF JAMUNA MAHAL CHSL
By PRANAV CONSTRUCTIONS LIMITED
RG-MH-07173 · RERA P51800054158 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 40.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
REDEVELOPMENT OF JAMUNA MAHAL CHSL is a Residential / Group Housing project by PRANAV CONSTRUCTIONS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054158 on 29 Dec 2023. Possession is promised by 1 May 2027. 27 of the 72 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameREDEVELOPMENT OF JAMUNA MAHAL CHSL
- TypeResidential / Group Housing
- Location
- ROAD NO. 1
- PRABHAT COLONY
- SANTACRUZ EAST
- Bandra
- Andheri
- Mumbai Suburban
- 400055
- Pincode400055
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800054158
- ReraGenie IDRG-MH-07173
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Dec 2023
- Promised completion1 May 2027
- Revised completionNone
- Buildings2 building records
- Documents filed107 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JAMUNA MAHAL - WING A | NA | 8 | 8 | 36 | 0 | 36 |
| JAMUNA MAHAL - WING B | NA | 8 | 8 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
JAMUNA MAHAL - WING A40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
JAMUNA MAHAL - WING B40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed121
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| JAMUNA MAHAL - WING A | 54 | 7 | 61 |
| JAMUNA MAHAL - WING B | 53 | 7 | 60 |
Land and ownership2
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| PRANAV CONSTRUCTIONS PRIVATE LIMITED | Goregaon | Mumbai Suburban |
| JAMUNA MAHAL CHSL | Bandra | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| JAMUNA MAHAL - WING B | NA | Rs 16.77 cr | Rs 4.19 cr |
| JAMUNA MAHAL - WING A | NA | Rs 15.65 cr | Rs 3.91 cr |
| - | NA | Rs 3.85 cr | Rs 30.78 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RASIK P HINGOO AND ASSOCIATES |
| Engineer | SACPL |
| Engineer | ADITYA DINESH MEHTA |
| Chartered Accountant | NITIN VARE |
| Chartered Accountant | MSKA & Associates |
| Partner | Role in project |
|---|---|
| PRANAV CONSTRUCTIONS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 May 2027
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Quality Assurance Certificate - Jamuna Mahal CHSL001.pdf | 20 May 2026 |
| Building plan approvalFile: IOD Letter Jamuna Mahal 16102024.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: Jamuna Mahal CHSL001.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: Jamuna Mahal CHSL001.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 -Jamuna Mahal.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM I_Jamuna Mahal CHSL.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 _ Jamuna Mahal CHSL.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_Jamuna Mahal CHSL001.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form 1-Jamuna Mahal.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Form 2- Jamuna Mahal.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 -Jamuna Mahal.pdf | 30 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - Jamuna Mahal.pdf | 1 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - Lakshman Tower.pdf | 27 Sep 2025 |
| Form 1File: Form-1 JAMUNA MAHAL CHSL.pdf | 31 Jul 2025 |
| Form 2File: Form-2-Jamuna Mahal.pdf | 31 Jul 2025 |
| Form 3File: Form-3-Jamuna Mahal CHSL.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure-Jamuna Mahal.pdf | 31 Jul 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2 Engineers Certificate Jamuna Mahal 31032024.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| Form 1File: FORM 1.pdf | 25 Jun 2025 |
| Form 2File: FORM 2.pdf | 25 Jun 2025 |
| Form 3File: FORM 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf | 25 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Full IOD Form 3 CA Certificate_ Jamuna Mahal CHSL as on 31032025.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Jamuna Mahal 31032025.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - I JM.pdf | 7 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_Compressed.pdf | 17 Mar 2025 |
| Proforma of Agreement for saleFile: Agreemement for Sale.pdf | 17 Mar 2025 |
| Building plan approvalFile: Jamuna Mahal IOD part 1.pdf | 3 Mar 2025 |
| Building plan approvalFile: Jamuna Mahal IOD Part 2.pdf | 3 Mar 2025 |
| Building plan approvalFile: Jamuna Mahal IOD Part 3.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Jamuna Mahal IOD part 1.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Jamuna Mahal IOD Part 2.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Jamuna Mahal IOD Part 3.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JM Form 1001.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jamuna Mahal Form 3_compressed.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jamuna Mahal CHSL Form 2.pdf | 14 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2448931_FurtherCC_signed.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SU JM 28102024.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Full IOD Form 3 CA CertificateJamuna Mahal CHSL as on 28102024 Updated.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Working Jamuna Mahal CHSL 28102024.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- JM.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jamuna Mahal CHSL.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Part IOD Form 3 30092024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092024.pdf | 22 Oct 2024 |
| PAN CardFile: PCL PAN Card Scan Copy.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2-JMCHSL-QE-30062024.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: jamuna mahal CHSL001.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-2-JMCHSL-QE-30062024.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-3-JMCHSL-QE-30062024-compressed.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jamuna Mahal001.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate (Jamuna Mahal CHSL)001.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Part IOD Form 3 CA Certificate_ Jamuna Mahal CHSL as on 31032024.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_jamuna mahal001.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Jamuna Mahal 31122023.pdf | 10 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Part IOD Form 3 CA Certificate_ Jamuna Mahal CHSL as on 31122023_compressed.pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jamuna Mahal CHSL Form 1001.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jamuna Mahal CHSL001.pdf | 27 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: no encumbrance certificate Finance.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to LegalFile: no encumbrance certificate Finance.pdf | 1 Dec 2023 |
Promoter's earlier projects29
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| REDEVELOPMENT OF METTIVILLA CHSLP51800004896 | Goregaon west, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2028 | Sep 2022 |
| REDEVELOPMENT OF LAKSHMAN TOWER CHSLP51800053601 | SHIMPOLI, Mumbai Suburban | 50 | Nov 2023 | Completed | Mar 2027 | Apr 2026 |
| REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSLP51800054093 | MALAD, Mumbai Suburban | 70 | Dec 2023 | Completed | Feb 2027 | Mar 2026 |
| REDEVELOPMENT OF KESAR NIKETAN CHSLP51800046669 | BORIVALI EAST, Mumbai Suburban | 81 | Aug 2022 | Completed | Jan 2026 | May 2025 |
| REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSLP51800034915 | MUMBAI, Mumbai Suburban | - | Apr 2022 | Completed | Sep 2025 | Mar 2024 |
| REDEVELOPMENT OF GOLD COIN CHSLP51800034931 | MUMBAI, Mumbai Suburban | - | Apr 2022 | Completed | Sep 2025 | Mar 2024 |
| REDEVELOPMENT OF RUSHABH MAHAL CHSLP51800034099 | MALAD EAST, Mumbai Suburban | 43 | Mar 2022 | Completed | Jun 2025 | May 2025 |
| REDEVELOPMENT OF RAMESH MANDIR CHSLP51800032468 | MUMBAI, Mumbai Suburban | - | Jan 2022 | Completed | Apr 2025 | Mar 2024 |
| REDEVELOPMENT OF SPARSH CHSLP51800031623 | MUMBAI, Mumbai Suburban | - | Nov 2021 | Completed | Mar 2025 | Jan 2024 |
| REDEVELOPMENT OF PLOT NO. 212P51800034087 | MUMBAI, Mumbai Suburban | - | Mar 2022 | Completed | Feb 2025 | Nov 2023 |
| REDEVELOPMENT OF MALAD MARUDHAR CHSLP51800032320 | MUMBAI, Mumbai Suburban | - | Dec 2021 | Completed | Jan 2025 | Jul 2024 |
| REDEVELOPMENT OF TIARA CHSLP51800034818 | MALAD WEST, Mumbai Suburban | - | Apr 2022 | Completed | Oct 2024 | Oct 2024 |
| REDEVELOPMENT OF POPULAR TERRACE CHSLP51800029351 | BORIVALI WEST MUMBAI, Mumbai Suburban | - | May 2021 | Completed | Sep 2024 | Apr 2024 |
| REDEVELOPMENT OF GALA APARTMENTS CHSLP51800029415 | MALAD EAST, Mumbai Suburban | - | May 2021 | Completed | Sep 2024 | Mar 2024 |
| REDEVELOPMENT OF SILVERENE CHSLP51800031840 | MUMBAI, Mumbai Suburban | - | Nov 2021 | Completed | Mar 2024 | Sep 2023 |
| REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSLP51800026908 | BORIVALI WEST MUMBAI, Mumbai Suburban | - | Nov 2020 | Completed | Mar 2024 | Apr 2023 |
| REDEVELOPMENT OF PUSHPAWADI CHSLP51800028108 | BORIWALI WEST, Mumbai Suburban | - | Jan 2021 | Completed | Dec 2023 | Sep 2022 |
| REDEVELOPMENT OF PRAVESH CHSLP51800020989 | BORIVALI EAST, Mumbai Suburban | - | May 2019 | Completed | Nov 2023 | Aug 2022 |
| REDEVELOPMENT OF MALAD AMBER CHSLP51800025354 | MUMBAI, Mumbai Suburban | - | Apr 2020 | Completed | Oct 2023 | Oct 2023 |
| REDEVELOPMENT OF ABHIRAM CHSLP51800018680 | KANDIVALI WEST, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2023 | Oct 2021 |
| REDEVELOPMENT OF NAVCHANDRAKUNJ CHSL | Plot No 42 Jawahar Nagar Road No 4 Goregaon West Mumbai | 23 | - | Completed | Mar 2021 | Mar 2020 |
| REDEVELOPMENT OF ULKA CHSL | Village Eksar TPS Borivali No III Borivali West Mumbai | 29 | - | Completed | Dec 2019 | May 2019 |
| REDEVELOPMENT OF MALAD RAJHANS CHSL | Plot No 19 Jitendra Road Malad East Mumbai | 55 | - | Completed | Mar 2019 | Late, Apr 2019 |
| REDEVELOPMENT OF DEEP CHSL | Marve Road Village Valnai Malad West Mumbai | 31 | - | Completed | Dec 2018 | Late, Feb 2019 |
| REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL | CTS No 289 289 1 to 6 Plot No 10 Village Valnai Taluka Borivali Malad West Mumbai 400064 | 26 | - | Completed | Jul 2018 | Feb 2018 |
| NEW LATA APARTMENT CHSL | GAJANAN COLONY ROAD GOREGAON WEST MUMBAI 400104 | 33 | - | Completed | Dec 2017 | Jun 2017 |
| ASHUTOSH CHSL | RAM MANDIR ROAD VAZIRA NAKA BORIVALI WEST MUMBAI 400091 | 20 | - | Completed | Sep 2017 | Oct 2016 |
| PRACHITI CHSL | PLOT 146 ROAD NO 9 JAWAHAR NAGAR GOREGAON WEST MUMBAI 400104 | 28 | - | Completed | Dec 2015 | Sep 2015 |
| KIRAN APARTMENTS | PLOT 229 ROAD NO 14 JAWAHAR NAGAR GOREGAON WEST MUMBAI 400104 | 30 | - | Completed | Dec 2013 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 46 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep REDEVELOPMENT OF JAMUNA MAHAL CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANTACRUZ EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 387 registered projects within 2 km.
ATMIYA CENTRIA
UPTURN PROPERTIES LLP
NINE ARCS
ARIHANT CONSTRUCTION CO
Trinity Towers
Jet Speed Realtors Private Limited
Bluemoon Annexe
MUDASSAR BUILDERS & DEVELOPERS
W55
DVASUYASH CONSTRUCTION 1 LLP
Sumit Bhakti
Sumit Pragati Ventures LLP
See every Mumbai Suburban project, with the district possession charts
Builder: PRANAV CONSTRUCTIONS LIMITED
PRANAV CONSTRUCTIONS LIMITED has 47 registrations on MahaRERA, including REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL and REDEVELOPMENT OF MALAD RAJHANS CHSL. Its filings disclose 29 earlier MahaRERA projects: declares 26 of 29 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if REDEVELOPMENT OF JAMUNA MAHAL CHSL is delayed beyond 1 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of REDEVELOPMENT OF JAMUNA MAHAL CHSL?
The registered promoter entity is PRANAV CONSTRUCTIONS LIMITED, a company as per the filing. Its GSTIN 27AAECP0580F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in REDEVELOPMENT OF JAMUNA MAHAL CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for REDEVELOPMENT OF JAMUNA MAHAL CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at REDEVELOPMENT OF JAMUNA MAHAL CHSL?
The professionals named in the filing: Architect: RASIK P HINGOO AND ASSOCIATES; Engineer: SACPL; Engineer: ADITYA DINESH MEHTA; Chartered Accountant: NITIN VARE; Chartered Accountant: MSKA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in REDEVELOPMENT OF JAMUNA MAHAL CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback