Home / Browse projects / Palghar, Maharashtra / Real Emporium

Registered No litigation declared Others project

Real Emporium

By Realtech Builders And Developers

RG-MH-66602 · RERA P99000049589 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
44 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Real Emporium is a Others project by Realtech Builders And Developers in Palghar, Maharashtra, registered with MahaRERA as P99000049589 on 15 Feb 2023. Possession is promised by 31 Dec 2027. 44 of the 88 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameReal Emporium
  • TypeOthers
  • Location
    • S.No.88
    • H.No. 2A
    • Yashwant Smart City
    • Village Gokhivare Vasai East
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000049589
  • ReraGenie IDRG-MH-66602

Builder

  • NameRealtech Builders And Developers
  • Entity typePartnership
  • GSTIN27ABEFR1335E1ZH
  • PartnersMujahid Idris Dhukka, Altaf Yakub Dauva

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

50%44 of 88 units booked
96.1%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg No 8 Wing A1NA242384488

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Bldg No 8 Wing A1: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area793 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
ROYAL IB INFRASTRUCTURE PRIVATE LIMITEDVasai-Virar City (M Corp)Palghar
RASHMI AMEYA DEVELOPERS HOUSING & ESTATE REALTORSVasai-Virar City (M Corp)Palghar
SAI RYDAM REALTORS PRIVATE LIMITEDVasai-Virar City (M Corp)Palghar
DEVENDRA RAJNIKANT LADHANIVasai-Virar City (M Corp)Palghar
ANIL RAMCHANDRA GUPTAVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI3234.24
Proposed, not sanctioned3,234 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 15 16 Olive Apartment Nallasopara West
Estimated costRs 18.30 cr
Cost incurredRs 17.59 cr
Work done96.11%
BuildingWingEstimatedIncurred
Bldg No 8 Wing A1NARs 16.80 crRs 16.46 cr
-NARs 1.50 crRs 1.12 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanat Mehta & Association
EngineerGR Consultants
EngineerSHUBHAM NAVAL KISHOR TIWARI
Chartered AccountantS Lakdawala & Associates
Chartered AccountantMAA & Company
PartnerRole in project
Realtech Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Jan to Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Jan to Mar 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 Jan to Mar 26_11zon.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Oct to Dec 2025.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 Oct to Dec 25.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3-Oct to Dec 25_11zon.pdf5 Feb 2026
Form 5 (FY 2024-2025)File: RBD Form 5.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1-Jul to Sep 25.pdf4 Nov 2025
Withdrawal Update Form 2File: RBD Form 2 Rera Format (July - Septmber 2025).pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 RBD jul to sep 2025_11zon.pdf4 Nov 2025
Withdrawal Update Form 1File: RBD Form 1 (April to June 2025).pdf8 Aug 2025
Withdrawal Update Form 2File: RBD Form 2 (April - June 2025).pdf8 Aug 2025
Withdrawal Update Form 3File: Form 3_11zon.pdf8 Aug 2025
Form 2A (FY 2024-2025)File: RBD Form 2A(24-25).pdf8 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan to March 25.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan to March 25.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan to March 25.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Jan to March 25.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold (Jan - March 2024).pdf5 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 2023-24.pdf5 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RBD Form 5_Signed.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RBD Form 1 (Oct- Dec 2024).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RBD FORM 3 (Oct-Dec 24).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RBD Form 2 (october- December 2024).pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: RBD Sold Unsold (October- December 2024).pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RBD Form 1 (July- Septmber 2024).pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RBD Form 3 (July- Septmber 2024).pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RBD Form 2 (July- September 2024).pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: RBD Sold Unsold (July- Sep 2024).pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RBD Form 1 (April 2024- June 2024).pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RBD Form 2 (April to June 2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: RBD Sold Unsold Inventry (April 2024- June 2024).pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RBD Form 3 (April 2024- June 2024).pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Jan - March 2024).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Jan - March 2024).pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3( Jan to Mar 24).pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23 .pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold with period.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold unsold with period.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Inventory Details with period.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration .pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New_11zon.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 2022-23.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 03-11-2023_11zon.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 FY 2022-23 _11zon.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Realtech Builders and Developers _11zon.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Realtech Builders and Developers sold Unsold _11zon.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Realtech Builders and Developers sold Unsold .pdf27 Jul 2023
Other - TechnicalFile: Sec V Gokhiware Layout 1-1.pdf7 Feb 2023
Other - TechnicalFile: LAYOUT REFUGE.pdf7 Feb 2023
Other - TechnicalFile: LAYOUT REFUGE 2.pdf7 Feb 2023
Other - TechnicalFile: RERA Refuge Floor Plan.pdf7 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: mujahid DOI.pdf3 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: altaf DOI.pdf3 Feb 2023
Other - LegalFile: BLUE PRINT.pdf3 Feb 2023
Building plan approvalFile: Blue Print-1_11zon.pdf27 Jan 2023
Copy of the legal title reportFile: Reply to query -Tittle Report Plot Area mismatch as per application .pdf27 Jan 2023
Details of encumbrances concerned to FinanceFile: Reply to query -Details of Land owner.pdf27 Jan 2023
Details of encumbrances concerned to LegalFile: Reply to query -Details of Land owner.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print-1_11zon.pdf27 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Reply to query -Details of Land owner.pdf27 Jan 2023
Proforma of Agreement for saleFile: Agreement for Sale_Final.pdf27 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Information about Deviations from Model Agreement for Sale _RBD.pdf27 Jan 2023
Layout approvalFile: Layout Plan.pdf17 Jan 2023
Copy of the legal title reportFile: Title Report.pdf17 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration for Financial Encumbrance.pdf17 Jan 2023
Details of encumbrances concerned to FinanceFile: declaration for legal and Litigation Encumbrance.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: Declaration for Financial Encumbrance.pdf17 Jan 2023
Details of encumbrances concerned to LegalFile: declaration for legal and Litigation Encumbrance.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf17 Jan 2023

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Real Emporium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Gokhivare Vasai East3,200+ in Palghar

2 kmReal EmporiumCompleted 46Lapsed / revoked 29Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: Realtech Builders And Developers

Realtech Builders And Developers has 1 registration on MahaRERA, including Real Emporium. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Real Emporium is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Real Emporium?

The registered promoter entity is Realtech Builders And Developers, a partnership as per the filing. Its GSTIN 27ABEFR1335E1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Real Emporium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Real Emporium?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Real Emporium?

The professionals named in the filing: Architect: Sanat Mehta & Association; Engineer: GR Consultants; Engineer: SHUBHAM NAVAL KISHOR TIWARI; Chartered Accountant: S Lakdawala & Associates; Chartered Accountant: MAA & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Real Emporium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Real Emporium. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Real Emporium to a free account