Home / Browse projects / Mumbai City, Maharashtra / RANKA LIFESTYLE VENTURES

Completed No litigation declared Others project

RANKA LIFESTYLE VENTURES

By Bhavesh Jayantilal Jain

RG-MH-28378 · RERA P51900025998 · Last updated on MahaRERA portal: 9 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

RANKA LIFESTYLE VENTURES is a Others project by Bhavesh Jayantilal Jain in Mumbai City, Maharashtra, registered with MahaRERA as P51900025998 on 7 Aug 2020. The registration is recorded completed; possession was promised by 23 Jun 2023.

At a glance

Project

  • NameRANKA LIFESTYLE VENTURES
  • TypeOthers
  • Location
    • Madhavdas Pasta Road
    • Gautam Nagar
    • Dadar (E)
    • Ward FSouth
    • Mumbai City
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900025998
  • ReraGenie IDRG-MH-28378

Builder

  • NameBhavesh Jayantilal Jain
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2020PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2020
  • Promised completion23 Jun 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING B - REHAB BUILDING - MONALISA PARADISENA260000
WING A - SALE BUILDING - MONALISA RESIDENCYNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

WING B - REHAB BUILDING - MONALISA PARADISE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A - SALE BUILDING - MONALISA RESIDENCY100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58
BuildingClosed/CoveredTotal
WING B - REHAB BUILDING - MONALISA PARADISE1919
WING A - SALE BUILDING - MONALISA RESIDENCY3939

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,091 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
KALPANA NAVINCHNDRA DEDHIAThane (M Corp.)Thane
KALPANA NAVINCHANDRA DEDHIAThane (M Corp.)Thane

Approvals and building plan

Permissible FSI5392.0
Proposed, not sanctioned5,151 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMadhumalati, Veer Sawarkar Path, Thane West - 400601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA.P. Dharia & Associates
EngineerM/s Epicons Consultants Pvt. Ltd.
Chartered AccountantRohit Savla & Associates
PartnerRole in project
Bhavesh Jayantilal Jain-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2023

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society_Registration_Certificate_31_10_2023.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5_FY_21_FY22_28_01_2023.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_5_FY_22_FY23_17_03_2024.pdf9 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation_Certificate_Signed_26_12_2022.pdf5 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_5_28_01_2023_compressed.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Rera Cert_5_24_01_2023_compressed.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Rera Cert_5_21_01_2023_Compressed.pdf2 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_5_28_01_2023_compressed.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_5_FY_21_FY22_28_01_2023.pdf2 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_4_25_08_2022_compressed.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_5_FY_20_FY21.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ranka Form 5 FY 20-21.pdf20 Jan 2023
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page1.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page2.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page3.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page4.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page5.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page6.pdf7 Sep 2022
Building plan approvalFile: Amended_Approved_Plan_14_12_2021_Page7.pdf7 Sep 2022
Building plan approvalFile: Amendment_4_Approval_Letter_14_12_2021.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page1.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page2.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page3.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page4.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page5.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page6.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended_Approved_Plan_14_12_2021_Page7.pdf7 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Amendment_4_Approval_Letter_14_12_2021.pdf7 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Final_CC_Amended_Plan_14_12_2021_signed.pdf7 Sep 2022
OtherFile: Format_C_Final_07_09_2022_compressed.pdf7 Sep 2022
OtherFile: Allottee_Consent_4_people_07_09_2022_compressed.pdf7 Sep 2022
OtherFile: Allottee_Consent_5_people_07_09_2022_compressed.pdf7 Sep 2022
OtherFile: Allottee_Consent_4_PAP_people_07_09_2022_compressed.pdf7 Sep 2022
OtherFile: Allottee_Consent_5_PAP_people_07_09_2022_compressed.pdf7 Sep 2022
OtherFile: Allottee_Consent_5_4LL_Plus_1PAP_people_07_09_2022_compressed.pdf7 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Rera Cert_4_24_08_2022_compressed.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Rera Cert_4_18_08_2022_compressed.pdf29 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer_Form2A_Rera Cert_1_21_01_2022_compressed.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_4_25_08_2022.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Rera Cert_3_25_01_2022.pdf4 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_3_31_01_2022_compressed.pdf4 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Rera Cert_3_21_01_2022_compressed.pdf25 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer_Form2A_Rera Cert_1_21_01_2022_compressed.pdf25 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Architect_Rera Cert_3_25_01_2022.pdf25 Mar 2022
OtherFile: Format_C.pdf27 Sep 2021
OtherFile: 20210927_Consent.pdf27 Sep 2021
Building plan approvalFile: Page 1.pdf8 Sep 2021
Building plan approvalFile: Page2.pdf8 Sep 2021
Building plan approvalFile: Page 4.pdf8 Sep 2021
Building plan approvalFile: Page 5.pdf8 Sep 2021
Building plan approvalFile: Page 6.pdf8 Sep 2021
Building plan approvalFile: Page 7.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page2.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 4.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 5.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 6.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 7.pdf8 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Page 1.pdf8 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Amended_Approval_Letter_03_06_21.pdf8 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Page 3.pdf8 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf8 Sep 2021
OtherFile: Final_Combined_Allottee_Consent_compressed-1-8.pdf8 Sep 2021
OtherFile: Final_Combined_Allottee_Consent_compressed-9-13.pdf8 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Sep 2021
Declaration about Commencement CertificateFile: Declaration_For_Commencement_Certificate.pdf3 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf3 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf3 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Jul 2020
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf4 Jul 2020
Layout approvalFile: SHEET 1.pdf1 Jul 2020
Building plan approvalFile: SHEET 2.pdf1 Jul 2020
Building plan approvalFile: SHEET 3.pdf1 Jul 2020
Building plan approvalFile: SHEET 4.pdf1 Jul 2020
Building plan approvalFile: SHEET 5.pdf1 Jul 2020
Building plan approvalFile: SHEET 6.pdf1 Jul 2020
Building plan approvalFile: SHEET 7.pdf1 Jul 2020
Copy of Layout Approval (in case of layout)File: SHEET 1.pdf1 Jul 2020
Building Plan Approval / NA Order for plotted developmentFile: SHEET 2.pdf1 Jul 2020
Building Plan Approval / NA Order for plotted developmentFile: SHEET 3.pdf1 Jul 2020

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RANKA LIFESTYLE VENTURES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gautam Nagar, Dadar (E)780+ in Mumbai City

2 kmRANKA LIFESTYLE VENTURESCompleted 94Lapsed / revoked 61Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 263 registered projects within 2 km.

Builder: Bhavesh Jayantilal Jain

Bhavesh Jayantilal Jain has 1 registration on MahaRERA, including RANKA LIFESTYLE VENTURES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if RANKA LIFESTYLE VENTURES is delayed beyond 23 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RANKA LIFESTYLE VENTURES?

The registered promoter entity is Bhavesh Jayantilal Jain, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RANKA LIFESTYLE VENTURES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RANKA LIFESTYLE VENTURES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RANKA LIFESTYLE VENTURES?

The professionals named in the filing: Architect: A.P. Dharia & Associates; Engineer: M/s Epicons Consultants Pvt. Ltd.; Chartered Accountant: Rohit Savla & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RANKA LIFESTYLE VENTURES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RANKA LIFESTYLE VENTURES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RANKA LIFESTYLE VENTURES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.