Registered No litigation declared Residential / Group Housing project

The Baya Sunrise

By RENAISSANCE SPACES

RG-MH-17651 · RERA P51900055576 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 100.00 crore secured on the land, in favour of TATA Capital Housing Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
134 of 230Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

The Baya Sunrise is a Residential / Group Housing project by RENAISSANCE SPACES in DADAR EAST, 400014, registered with MahaRERA as P51900055576 on 4 Apr 2024. Possession is promised by 31 Dec 2029. 96 of the 230 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Baya Sunrise
  • TypeResidential / Group Housing
  • Location
    • NAIGON
    • DADAR EAST
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900055576
  • ReraGenie IDRG-MH-17651

Builder

  • NameRENAISSANCE SPACES
  • Entity typePartnership
  • PartnerVILAS KHARCHE
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

42%96 of 230 units booked
25.3%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Wing CNA353521812230

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

Sale Wing C: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed319

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots319
Closed/Covered319

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,385 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTATA Capital Housing Finance Limited
Secured amountRs 100.00 crore
CERSAI search filedYes
Declared on29 Sep 2025
LandownerVillageDistrict
Abhinav Residency Co-Operative Houseing Society-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI16322.62
Proposed, not sanctioned9,636 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 386 Veer Savarkar Marg, Prabhadevi, Dadar, Mumbai, Maharashtra 400025
Estimated costRs 135.84 cr
Cost incurredRs 34.32 cr
Work done25.27%
BuildingWingEstimatedIncurred
Sale Wing CNARs 122.26 crRs 34.32 cr
-NARs 13.58 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCatapult Realty Consultants
EngineerChandrakant Patil
Chartered AccountantS R Bhat and Associates
Chartered AccountantD Ram and Associates
PartnerRole in project
RENAISSANCE SPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf22 Apr 2026
Withdrawal Update Form 1File: Architect Certificate.pdf22 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf22 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf22 Apr 2026
Withdrawal Update Form 3File: 8 Ren Spaces The Baya Sunrise Form 3 as on31032026.pdf22 Apr 2026
Withdrawal Update Form 3File: 8 Ren Spaces The Baya Sunrise Form 3 as on31032026.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf11 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf11 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf11 Mar 2026
Withdrawal Update Form 1File: Architectu0027s Certificate.pdf29 Sep 2025
Withdrawal Update Form 2File: Architectu0027s Certificate.pdf29 Sep 2025
Withdrawal Update Form 3File: Certificate 16 (1).pdf29 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ren Spaces - The Baya Sunrise - Form 3 as on _.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_The Baya SUNRISE_.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Disclosure of Inventory_The Baya Sunrise_.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate TBS New Format Qtr_Final March 2025.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_The Baya Sunrise_.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architece's Certificate_ Renaissance Spaces.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_The Baya SUNRISE_31 dEC.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_ Renaissance Spaces.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ren Spaces - The Baya Sunrise - Form 3 as on _.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_ Renaissance Spaces.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate TBS New Format Dec 2024 Qtr_Final.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_The Baya sunrise sEP.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_The Baya sunrise dEC 24.pdf29 Mar 2025
Proforma of Agreement for saleFile: Abhinav Draft Agreement.pdf31 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 1.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 2.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 3.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 4.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 5.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 6.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 7.pdf17 Jan 2025
Building plan approvalFile: ABHINAV IOD DATED 9.pdf17 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: ABHINAV IOD DATED 8.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 1.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 2.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 3.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 4.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 5.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 6.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 7.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: ABHINAV IOD DATED 9.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Baya Sunrise Form 3 Updated.pdf3 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Anil V Deshmukh.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Vilas Kharche.pdf2 Apr 2024
Other - TechnicalFile: Annexure A - Declaration Com-Undertaking.pdf2 Apr 2024
Deviation Report with respect to Allotment letterFile: Allotment letter.pdf22 Mar 2024
Other - TechnicalFile: fORMAT d.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Legal_and_Finance_Encumbrances.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: Legal_and_Finance_Encumbrances.pdf21 Mar 2024
Proforma of Allotment letterFile: Allotment Letter_New (As per RERA).pdf21 Mar 2024
Copy of the legal title reportFile: Legal Encumbrances.pdf19 Mar 2024
CERSAI detailsFile: Cersai Report.pdf19 Mar 2024
Proforma of Agreement for saleFile: Abhinav - Agreement For Sale.pdf16 Mar 2024
Other - LegalFile: Abhinav POA .pdf2 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1595_001.pdf13 Feb 2024
Building plan approvalFile: 1.pdf6 Feb 2024
Building plan approvalFile: 2.pdf6 Feb 2024
Building plan approvalFile: 3.pdf6 Feb 2024
Building plan approvalFile: 4.pdf6 Feb 2024
Building plan approvalFile: 5.pdf6 Feb 2024
Building plan approvalFile: 6.pdf6 Feb 2024
Building plan approvalFile: 7.pdf6 Feb 2024
Building plan approvalFile: 8.pdf6 Feb 2024
Building plan approvalFile: 9.pdf6 Feb 2024
Building plan approvalFile: 10.pdf6 Feb 2024
Building plan approvalFile: 11.pdf6 Feb 2024
Building plan approvalFile: 12.pdf6 Feb 2024
Building plan approvalFile: 13.pdf6 Feb 2024
Building plan approvalFile: 14.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf6 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf6 Feb 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Baya victoriathe byculla division situation at byculla west Mumbai 400011115-CompletedDec 2023Dec 2023
The Baya JunctionP51800015307Pestom Sagar, Mumbai Suburban-Feb 2018Certificate SignedDec 2023Jul 2023

Keep The Baya Sunrise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR EAST

2 kmThe Baya SunriseCompleted 17Lapsed / revoked 6Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: RENAISSANCE SPACES

Renaissance Spaces has 4 registrations on MahaRERA, including 7th Floor - C Wing - The Baya Goldspot and Floors 8 and 9 - The Baya Goldspot. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if The Baya Sunrise is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Baya Sunrise?

The registered promoter entity is RENAISSANCE SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Baya Sunrise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Baya Sunrise?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Baya Sunrise?

The professionals named in the filing: Architect: Catapult Realty Consultants; Engineer: Chandrakant Patil; Chartered Accountant: S R Bhat and Associates; Chartered Accountant: D Ram and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Baya Sunrise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Baya Sunrise. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Baya Sunrise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.