Home / Browse projects / Nashik, Maharashtra / Ramkrishna Hari Apartment

Registered No litigation declared Residential / Group Housing project

Ramkrishna Hari Apartment

By Vishant Vilas Chumbhale

RG-MH-94298 · RERA P51600051040 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
50 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Ramkrishna Hari Apartment is a Residential / Group Housing project by Vishant Vilas Chumbhale in Nashik, Maharashtra, registered with MahaRERA as P51600051040 on 22 May 2023. Possession is promised by 31 Dec 2026. 0 of the 50 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRamkrishna Hari Apartment
  • TypeResidential / Group Housing
  • Location
    • Gaulane Road
    • Nashik
    • Nashik (M Corp.)
    • 422010
  • Pincode422010
  • RERA no.P51600051040
  • ReraGenie IDRG-MH-94298

Builder

  • NameVishant Vilas Chumbhale
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Current status

0%0 of 50 units booked
55.5%Work done, per cost certificate

Figures as on 3 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ramkrishna Hari ApartmentNA6550050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

Ramkrishna Hari Apartment: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered25
Open Space67

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,018 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on2 Oct 2024
LandownerVillageDistrict
Radheya Nandkumar MalpaniNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityTown Planing Nashik Municipal Corporation Nashik
Permissible FSI3055.63
Proposed, not sanctioned3,056 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Arcade Opposite Hotel Excellency INN Ambad Link Road Nashik 422010
Estimated costRs 6.25 cr
Cost incurredRs 3.47 cr
Work done55.48%
BuildingWingEstimatedIncurred
Ramkrishna Hari ApartmentNARs 6.25 crRs 3.47 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShrirang Malpani
ArchitectSHRIRANG RADHEYA MALPANI
EngineerManish Bothara
EngineerManish Dilip Bothara
Chartered AccountantCA Paresh Sabadra
Chartered AccountantRohankumar Sanjaykumar Gangwal
Chartered AccountantASHOK SURAJMAL LOHADE
PartnerRole in project
Vishant Vilas Chumbhale-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certified Form 3 for September 2025.pdf3 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 Malpani Group 2024-25 SIGNED.pdf20 Nov 2025
Withdrawal Update Form 1File: form1.pdf7 Nov 2025
Withdrawal Update Form 1File: form1.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3 final.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3 final.pdf7 Nov 2025
Withdrawal Update Form 1File: form1.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 final.pdf30 Oct 2025
Form 1File: 0 FORM 1 JUNE 2023.pdf13 Jun 2025
Form 2File: 0 Form -2 Jun 23.pdf13 Jun 2025
Form 3File: 0 CA Certified Form 3 for June 2023.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 0 June 2023.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 0 Self Declaration Jun-23.pdf13 Jun 2025
Form 1File: 1 Form 1 Sept 23 New.pdf13 Jun 2025
Form 2File: 1 Form -2 Sep 23.pdf13 Jun 2025
Form 3File: 1 CA Certified Form 3 for September 2023.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 September 2023.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 1 Self Declaration Sept-23.pdf13 Jun 2025
Form 1File: 2 Form 1 Dec 23 New.pdf13 Jun 2025
Form 2File: 2 Form -2 Dec 23.pdf13 Jun 2025
Form 3File: 2 CA Certified Form 3 for December 2023.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 Dec- 2023.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 2 Self Declaration Dec-23.pdf13 Jun 2025
Form 1File: 3 Form 1 Mar 24 New.pdf13 Jun 2025
Form 2File: 3 Form -2 Mar 24.pdf13 Jun 2025
Form 3File: 3 CA Certified Form 3 for March 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 March- 2024.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 3 Self Declaration Mar-24.pdf13 Jun 2025
Form 1File: 4 Form 1 JUNE 24 New.pdf13 Jun 2025
Form 2File: 4 Form -2 Jun 24.pdf13 Jun 2025
Form 3File: 4 CA Certified Form 3 for June 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 4 June- 2024.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 4 Self Declaration Jun-24.pdf13 Jun 2025
Form 1File: 1 5 Form 1 SEPT 24 New.pdf13 Jun 2025
Form 2File: 2 5 Form -2 Sep 24.pdf13 Jun 2025
Form 3File: 3 5 CA Certified Form 3 for September 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 4 5 Sold Desc September 2024.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 5 5 Self Declaration Sept-24.pdf13 Jun 2025
Form 1File: 1 6 Form 1 DEC 24 New.pdf13 Jun 2025
Form 2File: 2 6 Form -2 Dec 24.pdf13 Jun 2025
Form 3File: 3 6 CA Certified Form 3 for December 2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 4 6 Dec- 2024.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 5 6 Self Declaration Dec-24.pdf13 Jun 2025
Form 1File: 1 7 Form 1 Mar 25 New.pdf13 Jun 2025
Form 2File: 2 7 Form -2 Mar 25.pdf13 Jun 2025
Form 3File: 3 7 CA Certified Form 3 for March 2025.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 4 7 March- 2025.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: 5 7 Self Declaration Mar-25.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 Final.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 signed final.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 final.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q1 Final.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Clarification.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Q1.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q2.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Q4 (2).pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 MahaRERA signed_11zon.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MahaRERA signed final.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 signed_11zon.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13052023131758_compressed.pdf13 May 2023
Proforma of Agreement for saleFile: Final RERA Agreement Malpani.pdf13 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Ram Krishna Hari Apartment.pdf13 May 2023
Layout approvalFile: Building plan (2).pdf10 May 2023
Building plan approvalFile: Building plan (2).pdf10 May 2023
Copy of the legal title reportFile: Title Report_Vishant Chumbhale.pdf10 May 2023
Copy of the legal title reportFile: Title Search (1).pdf10 May 2023

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ramkrishna Hari Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

Builder: Vishant Vilas Chumbhale

Vishant Vilas Chumbhale has 1 registration on MahaRERA, including Ramkrishna Hari Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ramkrishna Hari Apartment is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ramkrishna Hari Apartment?

The registered promoter entity is Vishant Vilas Chumbhale, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ramkrishna Hari Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ramkrishna Hari Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ramkrishna Hari Apartment?

The professionals named in the filing: Architect: Shrirang Malpani; Architect: SHRIRANG RADHEYA MALPANI; Engineer: Manish Bothara; Engineer: Manish Dilip Bothara; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: Rohankumar Sanjaykumar Gangwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ramkrishna Hari Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ramkrishna Hari Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ramkrishna Hari Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.