Home / Browse projects / Palghar, Maharashtra / Rameshwar Arcade

Registration lapsed No litigation declared Residential / Group Housing project

Rameshwar Arcade

By Level Up Realtors

RG-MH-70316 · RERA P99000032414 · Last updated on MahaRERA portal: 28 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Rameshwar Arcade is a Residential / Group Housing project by Level Up Realtors in Palghar, Maharashtra, registered with MahaRERA as P99000032414 on 4 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 21 of the 21 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameRameshwar Arcade
  • TypeResidential / Group Housing
  • Location
    • RTO Road
    • Opposite Jain Temple Palghar East
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000032414
  • ReraGenie IDRG-MH-70316

Builder

  • NameLevel Up Realtors
  • Entity typePartnership
  • PartnersMadhoor Pradeep Kotak, Sandip Chandrakant Mahale
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredJan 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jan 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed105 files

Current status

100%21 of 21 units booked
102.8%Work done, per cost certificate

Figures as on 28 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rameshwar ArcadeNA10919221

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Rameshwar Arcade: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 28 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area20 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
Level Up RealtorsPalghar Palghar
Lalitkumar Rameshwar PanditPalghar Palghar
Saumitra Lalitkumar PanditPalghar Palghar
Siddharth Lalitkumar PanditPalghar Palghar

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI4228.86
Proposed, not sanctioned4,229 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKacheri Road Palghar
Estimated costRs 16.51 cr
Cost incurredRs 16.97 cr
Work done102.8%
BuildingWingEstimatedIncurred
Rameshwar ArcadeNARs 8.25 crRs 8.48 cr
-NARs 8.25 crRs 8.48 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay G Gangutulla
EngineerSandip C Mahale
Chartered AccountantGanraj Tandel
PartnerRole in project
Level Up Realtors-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000025772Dec 2024 → Dec 2025

Reason as filed by the promoterBuilding is 98% ready we just need to apply for OC so need extension for interim waiting period

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: architec Certificate 1 apri 2024 to june 2024.pdf28 Dec 2025
Form 2File: engineering certificate 1 apri to june 24.pdf28 Dec 2025
Form 3File: From 3 june 24 (2).pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30june 24.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold un sold sep 2024.pdf28 Dec 2025
Form 1File: architec Certificate - 1 july 2024 to sep 2024.pdf28 Dec 2025
Form 2File: engineering certificate 1 july to sep 2024.pdf28 Dec 2025
Form 3File: from3 sep 24.pdf28 Dec 2025
Form 3File: FORM 1december 2024.pdf28 Dec 2025
Form 2File: Engineer Certificate oct to decembe 24.pdf28 Dec 2025
Form 1File: architec Certificate - 1 oct 2024 to 1 december2024.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold december 24.pdf28 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold march 25.pdf28 Dec 2025
Form 1File: architec Certificate - 1 jan 2025 to 31 march 2025.pdf28 Dec 2025
Form 2File: Engineer Certificate jan to march 25.pdf28 Dec 2025
Form 3File: FORM 1 jan to march 25 - Copy.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 1File: architec Certificate - 1 july 2025 to sep 25.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 2File: june 2022.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Withdrawal Update Form 3File: from 3 sep25.pdf28 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 june(1).pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 sep(1).pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 nov(1).pdf20 Mar 2025
Declaration in FORM BFile: Form B Affidavit_compressed.pdf19 Mar 2025
Declaration in FORM BFile: From B copy.pdf10 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 sep.pdf10 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 nov.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architec Certificate(1).pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from3 sep 24.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 june 24.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 nov 24.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate sep 2024.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate june 24.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate nov 24.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf25 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From 5 june.pdf25 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 1.pdf25 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from3 sep 24.pdf25 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 3 nov 24.pdf25 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Rameshwar Arcade.pdf10 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 Rameshwar.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jan 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: feb 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: April 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: May 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June -2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: August 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: octo 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nov 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec-2022.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: jan 22.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: feb 22.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2022.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: April 2022 (1).pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: May 2022 (1).pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 2022.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ramesh.pdf21 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rameshwar Arcadep9900003241470/1/1, RTO Road, Opposite Jain Temple Palghar East, Palghar , Palghar, Palghar, 401404, MAHARASHTRA-Certificate SignedDec 2025Dec 2025
Golden EyePhad Satpati288CompletedJan 2018Late, Dec 2019

How this compares with Palghar

100%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rameshwar Arcade on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Jain Temple Palghar East3,200+ in Palghar

2 kmRameshwar ArcadeCompleted 124Lapsed / revoked 56Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 317 registered projects within 2 km.

Builder: Level Up Realtors

Level Up Realtors has 2 registrations on MahaRERA, including Rameshwar Arcade and Kotak Royale. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that Rameshwar Arcade shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Rameshwar Arcade is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rameshwar Arcade?

The registered promoter entity is Level Up Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rameshwar Arcade?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rameshwar Arcade?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rameshwar Arcade?

The professionals named in the filing: Architect: Vijay G Gangutulla; Engineer: Sandip C Mahale; Chartered Accountant: Ganraj Tandel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rameshwar Arcade?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rameshwar Arcade. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rameshwar Arcade to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.