ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / RAMAN TARA HEIGHTS

Registration lapsed No litigation declared Mixed project

RAMAN TARA HEIGHTS

By SURENDRA MODY AND OTHERS

RG-MH-43047 · RERA P51900011462 · Last updated on MahaRERA portal: 2 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 106 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2017Possession promised106 months past this date
9 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

RAMAN TARA HEIGHTS is a Mixed project by SURENDRA MODY AND OTHERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900011462 on 31 Aug 2017. Possession was promised by 31 Dec 2017 and is now 106 months past that date. 1 of the 2 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAMAN TARA HEIGHTS
  • TypeMixed
  • Location
    • Mumbai City
    • 400003
  • Pincode400003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900011462
  • ReraGenie IDRG-MH-43047

Builder

  • NameSURENDRA MODY AND OTHERS
  • Entity typePartnership
  • PartnersKASHMIRA RAJESH MODY, HEMANT RAMANLALA MODY, HEMANG RAMANLAL MODY

Key dates

106 months past promisethis monthRegisteredAug 2017PromisedDec 2017

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2017
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

50%1 of 2 units booked

Figures as on 2 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAMAN TARA HEIGHTSNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

RAMAN TARA HEIGHTS82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 2 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area105 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SURENDRA MODYMumbai CityMumbai City

Approvals and building plan

Permissible FSI903.7
Proposed, not sanctioned452 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch126- NARAYAN DHURU STREET MUMBAI-400003

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH DHARIA
EngineerV J JOSHI
PartnerRole in project
SURENDRA MODY AND OTHERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Notary.pdf2 Jul 2025
Certificates of CA (Form 3)File: Q3 2024-25 Form 3.pdf2 Jul 2025
Certificates of CA (Form 3)File: Q4 2024-25 Form 3.pdf2 Jul 2025
Declaration in FORM BFile: Declaration in Form B with notary.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Unsold Inventorys.pdf8 Apr 2025
Certificates of CA (Form 5)File: Form 5_compressed.pdf20 Feb 2025
Declaration in FORM BFile: Affidavit cum declation.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (17-18).pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (18-19).pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (19-20).pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Inventory List S.pdf30 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (20-21).pdf30 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 5 (20-21).pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (21-22).pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (22-23).pdf30 Nov 2024
Certificates of CA (Form 3)File: Form-3 June-23.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form-3 Sep-23.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form-3 Dec-23.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form-3 March-24.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form-3 June-24.pdf13 Nov 2024
Certificates of CA (Form 3)File: Form-3 Sep24.pdf13 Nov 2024
Certificates of CA (Form 3)File: 30-06-2017_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2017_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2017_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2018_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-06-2018_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2018_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2018_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2019_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-06-2019_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2019_compressed (1).pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2019_compressed (1).pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2020_compressed (1).pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-06-2020_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2020_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2020_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2021_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-06-2021_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2021_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2021_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2022_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-06-2022_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 30-09-2022_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-12-2022_compressed.pdf18 Jun 2024
Certificates of CA (Form 3)File: 31-03-2023_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (17-18)_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (18-19)_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (19-20)_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (20-21)_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (21-22)_compressed.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 (22-23)_compressed.pdf18 Jun 2024
Layout approvalFile: IOD PLAN 1.pdf1 Aug 2017
Building plan approval or NA orderFile: IOD PLAN 1.pdf1 Aug 2017
PAN CardFile: PAN CARD.pdf1 Aug 2017
Copy of the legal title reportFile: Tital Certificata - Copy.pdf1 Aug 2017
Details of encumbrancesFile: Emcumbrance Letter.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: IOD PLAN 1.pdf1 Aug 2017
Building Plan Approval (IOD)File: IOD PLAN 1.pdf1 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf1 Aug 2017
Declaration in FORM BFile: 2017-8-1-15-47-17.pdf1 Aug 2017
Declaration in FORM BFile: 2017-8-1-15-47-50.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2017-8-1-16-0-52.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2017-8-1-16-1-41.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2017-8-1-16-2-19.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf1 Aug 2017
Certificates of CA (Form 3)File: ca certificate final.pdf1 Aug 2017
Certificates of CA (Form 5)File: ca certificate final.pdf1 Aug 2017
Proforma of Allotment letterFile: Tital Certificata - Copy.pdf1 Aug 2017
OtherFile: PAN CARD.pdf1 Aug 2017

How this compares with Mumbai City

50%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAMAN TARA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmRAMAN TARA HEIGHTSCompleted 14Lapsed / revoked 18Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: SURENDRA MODY AND OTHERS

SURENDRA MODY AND OTHERS has 1 registration on MahaRERA, including RAMAN TARA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that RAMAN TARA HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RAMAN TARA HEIGHTS is delayed beyond 31 Dec 2017?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAMAN TARA HEIGHTS?

The registered promoter entity is SURENDRA MODY AND OTHERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAMAN TARA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAMAN TARA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAMAN TARA HEIGHTS?

The professionals named in the filing: Architect: PRAKASH DHARIA; Engineer: V J JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMAN TARA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMAN TARA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMAN TARA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.