Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
11 of 163Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

NATHANI SQUARE is a Others project by A.PATNI REALTY PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900010462 on 27 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 152 of the 163 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameNATHANI SQUARE
  • TypeOthers
  • Location
    • Kambekar Street
    • Mohammed Ali Road
    • Mumbai City
    • 400003
  • Pincode400003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900010462
  • ReraGenie IDRG-MH-79262

Builder

  • NameA.PATNI REALTY PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorABDUL HAMID ABDUL MAJID NATHANI

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed75 files

Current status

93%152 of 163 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NATHANI SQUARENA27251630163

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

NATHANI SQUARE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,291 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI13960.04
Proposed, not sanctioned10,428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANDVI,MUMBAI
Estimated costRs 57.98 cr
Cost incurredRs 57.98 cr
Work done100.0%
BuildingWingEstimatedIncurred
NATHANI SQUARENARs 57.46 crRs 57.46 cr
-NARs 52.84 lakhRs 52.84 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOcean Designs
EngineerHanware consultants
Chartered AccountantUmesh Bhat
PartnerRole in project
A.PATNI REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11032620180Dec 2025 → Dec 2026

Reason as filed by the promoterMHADA NOC TO O.C IS NOT YET GRANTED DUE TO WHICH BMC HAS NOT ISSUED O.C. FOR THE PROJECT

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate NS 10072026.pdf20 Jul 2026
Withdrawal Update Form 2File: Engineer Certifcate NS 13072026.pdf20 Jul 2026
Withdrawal Update Form 3File: MahaRERA Form 03 Nathani Square 30062026.pdf20 Jul 2026
Withdrawal Update Form 1File: Ocean Design..pdf8 May 2026
Withdrawal Update Form 2File: Hanware Consultant EC NS.pdf8 May 2026
Withdrawal Update Form 3File: MahaRERA Form 03 Nathani Square.pdf8 May 2026
Withdrawal Update Form 1File: FORM-1 .pdf10 Mar 2026
Withdrawal Update Form 1File: FORM-1 .pdf10 Mar 2026
Withdrawal Update Form 1File: FORM-1 .pdf10 Mar 2026
Withdrawal Update Form 1File: Architect Certifcate Nathani Sqaure Q3.pdf10 Mar 2026
Withdrawal Update Form 2File: Nathani Sqaure Engineer Certificate.pdf10 Mar 2026
Withdrawal Update Form 2File: Nathani Sqaure Engineer Certificate.pdf10 Mar 2026
Withdrawal Update Form 2File: Nathani Sqaure Engineer Certificate.pdf10 Mar 2026
Withdrawal Update Form 2File: Nathani Sqaure Engineer Certificate.pdf10 Mar 2026
Withdrawal Update Form 3File: RERA Form-3 Nathani Square .pdf10 Mar 2026
Withdrawal Update Form 3File: Form-3 Nathani Square Q1.pdf10 Mar 2026
Withdrawal Update Form 3File: MahaRERA Form-3 Nathani Square.pdf10 Mar 2026
Withdrawal Update Form 3File: MahaRERA Form-03 December 2025- Nathani Square.pdf10 Mar 2026
Form 1File: ARC NS Q1.pdf27 Feb 2026
Form 2File: ENG NS Q1.pdf27 Feb 2026
Form 3File: Form-3 Nathani Square Q1.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold-Unsold.pdf27 Feb 2026
Form 1File: Architect Certifcate NS Ocean Design 27 Oct 2025.pdf27 Feb 2026
Form 2File: Engineer Certificate NS Hanware 3 Nov 2025.pdf27 Feb 2026
Form 3File: MahaRERA Form-3 Nathani Square.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold-Unsold.pdf27 Feb 2026
Form 1File: Architect Certifcate Nathani Sqaure Q3.pdf27 Feb 2026
Form 2File: Engineers Certificate Nathani Sqaure Q3.pdf27 Feb 2026
Form 3File: MahaRERA Form-03 December 2025- Nathani Square.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold-Unsold.pdf27 Feb 2026
Form 1File: ARC NS Q1.pdf27 Feb 2026
Form 2File: ENG NS Q1.pdf27 Feb 2026
Form 3File: Form-3 Nathani Square Q1.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold-Unsold.pdf27 Feb 2026
Form 5 (FY 2024-2025)File: Rera Form-5.pdf30 Sep 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE PATNI.pdf25 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A PATNI - ARCHITECT CERTIFICATE.pdf22 Feb 2025
Certificates of CA (Form 3)File: Form3 Master RERA Form Nathani Square comp.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A PATNI ENGINEER CERT.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Nathani Square .pdf4 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Further cc Nathani Square.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Nathani Square .pdf5 Mar 2024
Layout approvalFile: Amended Drawing Nathani Square 4.pdf10 Jan 2024
Details of encumbrances concerned to FinanceFile: Nathani Square amendment letter.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: Nathani Square amendment letter.pdf10 Jan 2024
Copy of Layout Approval (in case of layout)File: Amended Drawing Nathani Square 4.pdf10 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Nathani Square.pdf14 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 .pdf16 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nathani Sqaure Engineer Certificate.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nathani Sqaure (Quality Assurance Certificate).pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Nathani Sqaure- Disclosure of Sold Unsold .pdf16 May 2023
Certificates of CA (Form 3)File: RERA Form-3 Nathani Square .pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5NathaniSquareFY201819.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5NathaniSquareFY202021.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5NathaniSquareFY202122.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5NathaniSquareFY202122.pdf28 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration for CHS.pdf23 Dec 2022
Certificates of CA (Form 5)File: Nathani Square.pdf22 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: cc NS.pdf4 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi Nathani Square.pdf4 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NS-eng.pdf4 Jan 2019
Certificates of CA (Form 3)File: Nathani Square CA (1).pdf4 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: C-C-(Plint)-NATHANI SQUARE.pdf27 Mar 2018
Layout approvalFile: NATHANI SQUARE IOD (1).pdf30 Jul 2017
Building plan approvalFile: NATHANI SQUARE IOD (1).pdf30 Jul 2017
Copy of the legal title reportFile: TITLE NS.pdf30 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE NS.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: NATHANI SQUARE IOD (1).pdf30 Jul 2017
Building Plan Approval (IOD)File: NATHANI SQUARE IOD (1).pdf30 Jul 2017
Declaration in FORM BFile: DECLARATION NS.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE NS.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER NS.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA NS.pdf30 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT NS.pdf30 Jul 2017
Proforma of Allotment letterFile: AGREEMENT NS.pdf30 Jul 2017

How this compares with Mumbai City

93%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NATHANI SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mohammed Ali Road780+ in Mumbai City

2 kmNATHANI SQUARECompleted 14Lapsed / revoked 20Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 105 registered projects within 2 km.

Builder: A.PATNI REALTY PRIVATE LIMITED

A.PATNI REALTY PRIVATE LIMITED has 1 registration on MahaRERA, including NATHANI SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if NATHANI SQUARE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NATHANI SQUARE?

The registered promoter entity is A.PATNI REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NATHANI SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NATHANI SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NATHANI SQUARE?

The professionals named in the filing: Architect: Ocean Designs; Engineer: Hanware consultants; Chartered Accountant: Umesh Bhat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NATHANI SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NATHANI SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NATHANI SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.