QAMAR E BANI HASHIM
RG-MH-64367 · RERA P51900081111 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
QAMAR E BANI HASHIM is a Others project by COMMERCIAL DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900081111 on 18 Mar 2026. Possession is promised by 31 Dec 2028. 0 of the 109 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameQAMAR E BANI HASHIM
- TypeOthers
- Location
- Ebrahim Rehmatullah Road
- B Ward
- Mumbai City
- 400003
- Pincode400003
- RERA no.P51900081111
- ReraGenie IDRG-MH-64367
Builder
- NameCOMMERCIAL DEVELOPERS
- Entity typePartnership
- PartnersMOHAMMED KAMRUDDIN KANOREWALA, TAHERALI KAMRUDDIN KANOREWALA, AMIR KAMRUDDIN KANOREWALA
- Other registrations2 more →
- Completed1 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Mar 2026
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| QAMAR E BANI HASHIM | NA | 23 | 22 | 94 | 15 | 109 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.
QAMAR E BANI HASHIM: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 45% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SAKINBEN KIKABHAI KHAMBHATI | - | Hyderabad |
| SIRAJ KAMILUDDIN DOHADWALA | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| QAMAR E BANI HASHIM | NA | Rs 15.12 cr | Rs 80.00 lakh |
| - | NA | Rs 1.68 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M K ALIJIWALA AND ASSOCIATES |
| Engineer | V J JOSHI AND ASSOCIATES |
| Chartered Accountant | D P SHEJWAL AND ASSOCIATES |
| Chartered Accountant | B M CHAUHAN & CO |
| Chartered Accountant | H S SHAH & ASSOCIATES |
| Chartered Accountant | B M Chauhan & Co. |
| Partner | Role in project |
|---|---|
| COMMERCIAL DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2026 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 Q4 As on 31-03-2026 QBH.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form-2 Q4 As on 31-03-2026 QBH.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: Form-3 Q4 As on 31-03-2026 QBH.pdf | 16 Jun 2026 |
| Copy of the legal title reportFile: 1901 FLOW OF TITLE.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_7.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_1.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_2.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_3.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_4.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_5.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_6.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_8.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_9.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_10.pdf | 14 Feb 2026 |
| Other - LegalFile: DEED OF REVERSIONARY RIGHTS 1901_11.pdf | 14 Feb 2026 |
| Other - LegalFile: Declaration-02.pdf | 14 Feb 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 3 Jan 2026 |
| Copy of the legal title reportFile: Format A legal Titile Report.pdf | 12 Dec 2025 |
| Other - LegalFile: 9021-12 Deed of Rectification - Hussana Mansion.pdf | 12 Dec 2025 |
| Other - LegalFile: 8370-16 Release Deed_Print-REVERSIONARY RIGHTS -Siraj Bldg-1.pdf | 12 Dec 2025 |
| Other - LegalFile: 8370-16 Release Deed_Print-REVERSIONARY RIGHTS -Siraj Bldg-2.pdf | 12 Dec 2025 |
| Other - LegalFile: 8370-16 Release Deed_Print-REVERSIONARY RIGHTS -Siraj Bldg-3.pdf | 12 Dec 2025 |
| Other - FinanceFile: DECLARATION FOR QBH .pdf | 13 Nov 2025 |
| Other - LegalFile: 1901 DA-1.pdf | 31 Jul 2025 |
| Other - LegalFile: 1901 DA-2.pdf | 31 Jul 2025 |
| Other - LegalFile: 1901 DA-3.pdf | 31 Jul 2025 |
| Other - LegalFile: PR CARD 1901 NEW AJABO.pdf | 29 Jul 2025 |
| Other - LegalFile: PR CARD 1902 NEW 31-03-2023.pdf | 29 Jul 2025 |
| Other - LegalFile: PR CARD 1903 NEW 31-03-2023.pdf | 29 Jul 2025 |
| Other - LegalFile: PR CARD 1904 NEW 31-03-2023.pdf | 29 Jul 2025 |
| Other - FinanceFile: Sakina Khambati Letter.pdf | 25 Jul 2025 |
| Other - FinanceFile: SIRAJ DAHODWALA.pdf | 25 Jul 2025 |
| Other - LegalFile: Tankiwala Deed of Convyence-Email-1.pdf | 14 Jul 2025 |
| Other - LegalFile: Sariya Bldg 1.pdf | 14 Jul 2025 |
| Other - LegalFile: Tankiwala Deed of Convyence-Email-2.pdf | 14 Jul 2025 |
| Other - LegalFile: Tankiwala Deed of Convyence-Email-3.pdf | 14 Jul 2025 |
| Other - LegalFile: Tankiwala Deed of Convyence-Email-4.pdf | 14 Jul 2025 |
| Other - LegalFile: Sariya Bldg 4.pdf | 14 Jul 2025 |
| Other - LegalFile: Sariya Bldg 2.pdf | 14 Jul 2025 |
| Other - LegalFile: Sariya Bldg 3.pdf | 14 Jul 2025 |
| Other - TechnicalFile: Annexure A _one project on registration.pdf | 14 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Mohammed Kamruddin Kanorewala-1.pdf | 14 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A AMIR KAMRUDDIN KANOREWALA.pdf | 14 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A TAHERALI KAMRUDDIN KANOREWALA.pdf | 14 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate - Financial.pdf | 4 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate - Legal.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 FOR QBH.pdf | 4 Jul 2025 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Certificate - Financial.pdf | 4 Jul 2025 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Certificate - Legal.pdf | 4 Jul 2025 |
| Proforma of Allotment letterFile: Allotment draft.pdf | 4 May 2025 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 4 May 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 4 May 2025 |
| Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf | 4 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf | 4 May 2025 |
| Proforma of Agreement for saleFile: sale agreement draft.pdf | 4 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B New.pdf | 4 May 2025 |
| Layout approvalFile: PLAN_1.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_2.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_3.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_4.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_5.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_6.pdf | 3 May 2025 |
| Layout approvalFile: PLAN_7.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_1.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_2.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_3.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_4.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_5.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_6.pdf | 3 May 2025 |
| Building plan approvalFile: PLAN_7.pdf | 3 May 2025 |
| PAN CardFile: PAN CARD-CD.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_6.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_7.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_5.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_4.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_3.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_2.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN_1.pdf | 3 May 2025 |
| Declaration in FORM BFile: Form B.pdf | 3 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: COMM CERT.pdf | 3 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep QAMAR E BANI HASHIM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near B Ward780+ in Mumbai City
BURJ ASHRAFI
IMRAN ALI MOHAMMED LATIF
Lotus
Shreem Reality
NATHANI SQUARE
A.PATNI REALTY PRIVATE LIMITED
Safiya Heights
SMY ASSOCIATES
DULDUL HEIGHTS
SAAFI INFRA LLP
Ayesha Residency
Iqbal Yakub Khan
See every Mumbai City project, with the district possession charts
Builder: COMMERCIAL DEVELOPERS
COMMERCIAL DEVELOPERS has 3 registrations on MahaRERA, including CHANDRA DARSHAN HEIGHTS and Chandra Darshan Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if QAMAR E BANI HASHIM is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of QAMAR E BANI HASHIM?
The registered promoter entity is COMMERCIAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in QAMAR E BANI HASHIM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for QAMAR E BANI HASHIM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at QAMAR E BANI HASHIM?
The professionals named in the filing: Architect: M K ALIJIWALA AND ASSOCIATES; Engineer: V J JOSHI AND ASSOCIATES; Chartered Accountant: D P SHEJWAL AND ASSOCIATES; Chartered Accountant: B M CHAUHAN & CO; Chartered Accountant: H S SHAH & ASSOCIATES; Chartered Accountant: B M Chauhan & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in QAMAR E BANI HASHIM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback