ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Safiya Heights

Registered Litigation declared Residential / Group Housing project

Safiya Heights

By SMY ASSOCIATES

RG-MH-78108 · RERA P51900014409 · Last updated on MahaRERA portal: 8 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 66 months from the original
9 of 11Construction stages donefurthest along: Staircases, 93%
99 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Safiya Heights is a Residential / Group Housing project by SMY ASSOCIATES in Mumbai City, Maharashtra, registered with MahaRERA as P51900014409 on 29 Nov 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 66 months from the original filing. 21 of the 120 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSafiya Heights
  • TypeResidential / Group Housing
  • Location
    • Chakala Road
    • ABCD-400001
    • Ward ABCD
    • Mumbai City
    • 400003
  • Pincode400003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900014409
  • ReraGenie IDRG-MH-78108

Builder

  • NameSMY ASSOCIATES
  • Entity typePartnership
  • GSTIN27ACJFS7548A2ZX
  • PartnerMAZHAR HASAN ALI SAYYED

Key dates

this monthRegisteredNov 2017First promiseJun 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed80 files

Current status

18%21 of 120 units booked
80.5%Work done, per cost certificate

Figures as on 8 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Safiya HeightsNA24245763120

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 93%.

Safiya Heights: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area517 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Apr 2026

Approvals and building plan

Sanctioning authorityThe Municipal Corporation of Greater Mumbai
Permissible FSI5819.91
Proposed, not sanctioned3,121 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCrowfard Market
Estimated costRs 12.14 cr
Cost incurredRs 9.77 cr
Work done80.47%
BuildingWingEstimatedIncurred
Safiya HeightsNARs 12.14 crRs 9.77 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs Kazi & Associates
EngineerMohammed Farooque Nizamuddin Bopari
Chartered AccountantCA Tushar D Shah
PartnerRole in project
SMY ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900012284Jun 2022 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 55.56% allottees for purpose of extension of RERA registration period of the said project.

EA22072621831Jun 2022 → Dec 2027

Reason as filed by the promotera) As the entire country including Mumbai City were under a total lock-down; and the Government of India as well as the Government of Maharashtra had announced a slew of measures including “work from home” and “social distancing” to curb the spread of the COVID-19. In view of the curbs and measures imposed by the Governments, we stopped work till such time as the said lockdowns, curbs and measures were relaxed by the respective Governments. b) Inspite of best efforts, the said project was adversely affected due to unprecedented COVID-19 Pandemic which lasted for more than 2 years and are still

Litigation declared1

CaseCourtStatus
1247/2014High CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1-March 26 SIGNED NEW.pdf8 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate -MARCH 26 signed.pdf8 Aug 2026
Withdrawal Update Form 3File: MARCH FORM 3 .pdf8 Aug 2026
Withdrawal Update Form 1File: Form1-March 26 SIGNED NEW.pdf3 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate -MARCH 26 signed.pdf3 Aug 2026
Withdrawal Update Form 3File: MARCH FORM 3 .pdf3 Aug 2026
Form 2A (FY 2017-2018)File: Form 2A March 2018.pdf22 Jul 2026
Form 2A (FY 2018-2019)File: Form 2A March 2019.pdf22 Jul 2026
Form 2A (FY 2019-2020)File: Form 2A March 2020.pdf22 Jul 2026
Form 2A (FY 2020-2021)File: Form 2A March 2021.pdf22 Jul 2026
Form 2A (FY 2021-2022)File: Form 2A March 2022.pdf22 Jul 2026
Form 2A (FY 2022-2023)File: Form 2A March 2023.pdf22 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A March 2024.pdf22 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf22 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - March 26.pdf22 Jul 2026
Withdrawal Update Form 1File: Form1-Dec-25 SIGNED NEW.pdf10 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate -December 2025 signed (1).pdf10 Jul 2026
Withdrawal Update Form 3File: Form-3_Dec 2025 CA.pdf10 Jul 2026
Form 5 (FY 2023-2024)File: RA 23-24.pdf19 Nov 2025
Form 5 (FY 2024-2025)File: RA 24-25.pdf19 Nov 2025
Form 1File: AR Sep 2025.pdf12 Nov 2025
Form 2File: Engineer Certificate -Sept 25.pdf12 Nov 2025
Form 3File: CA Sept 25.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 2025.pdf12 Nov 2025
Form 1File: AR june 25.pdf12 Nov 2025
Form 2File: Engineer Certificate -June 25.pdf12 Nov 2025
Form 3File: CA Jun 25.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure june 2025.pdf12 Nov 2025
Form 1File: AR march 25.pdf12 Nov 2025
Form 2File: Engineer Certificate -March 25.pdf12 Nov 2025
Form 3File: CA March 25_compressed.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure March 2025.pdf12 Nov 2025
Form 1File: AR Dec 24.pdf12 Nov 2025
Form 2File: Engineer Certificate -Dec 24.pdf12 Nov 2025
Form 3File: CA Dec 24_compressed.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure DEc 24.pdf12 Nov 2025
Form 1File: AR Sept 24.pdf12 Nov 2025
Form 2File: Engineer Certificate -Sept 24.pdf12 Nov 2025
Form 3File: CA Sept 24_compressed.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 2024.pdf12 Nov 2025
Form 1File: AR Jun 24.pdf12 Nov 2025
Form 2File: Engineer Certificate -June 24.pdf12 Nov 2025
Form 3File: CA Jun 24_compressed.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure june 2024.pdf12 Nov 2025
Form 1File: AR March 24.pdf12 Nov 2025
Form 2File: Engineer Certificate -March 24.pdf12 Nov 2025
Form 3File: CA March 24_compressed.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure march 2024.pdf12 Nov 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_11zon.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf16 May 2024
Certificates of CA (Form 3)File: Form 3 Dec 23_11zon.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 17-18.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf16 May 2024
Declaration about Commencement CertificateFile: FORMAT D.pdf26 Apr 2024
Declaration in FORM BFile: Form B.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mar 24_11zon.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf16 Apr 2024
CERSAI detailsFile: Declaration of CERSAI.pdf16 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf16 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf16 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 2348653_FurtherCC_signed.pdf26 Mar 2024
Building plan approvalFile: Amended_Conditions.pdf21 Nov 2017
Layout approvalFile: Amended_Conditions.pdf21 Nov 2017
PAN CardFile: SMY pan card.pdf21 Nov 2017
Copy of the legal title reportFile: Title Certificate.pdf21 Nov 2017
Details of encumbrancesFile: Title Certificate.pdf21 Nov 2017
Copy of Layout Approval (in case of layout)File: Amended_Conditions.pdf21 Nov 2017
Building Plan Approval (IOD)File: Amended_Conditions.pdf21 Nov 2017
Declaration in FORM BFile: Form-B.pdf21 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1.pdf21 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New.pdf21 Nov 2017
Certificates of CA (Form 3)File: CA FORM.pdf21 Nov 2017
Proforma of Allotment letterFile: Allotment Letter.pdf21 Nov 2017

How this compares with Mumbai City

18%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 66 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Safiya Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ABCD-400001780+ in Mumbai City

2 kmSafiya HeightsCompleted 13Lapsed / revoked 19Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: SMY ASSOCIATES

SMY ASSOCIATES has 1 registration on MahaRERA, including Safiya Heights. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Safiya Heights is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Safiya Heights?

The registered promoter entity is SMY ASSOCIATES, a partnership as per the filing. Its GSTIN 27ACJFS7548A2ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Safiya Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Safiya Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Safiya Heights?

The professionals named in the filing: Architect: Ms Kazi & Associates; Engineer: Mohammed Farooque Nizamuddin Bopari; Chartered Accountant: CA Tushar D Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Safiya Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Safiya Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Safiya Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.