Home / Browse projects / Pune, Maharashtra / RAJGRUHI RESIDENCY TOWER D

Completed Litigation declared Residential / Group Housing project

RAJGRUHI RESIDENCY TOWER D

By Atria Constructions

RG-MH-27478 · RERA P52100034436 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 5 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Stilt Floor, 0%
5Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

RAJGRUHI RESIDENCY TOWER D is a Residential / Group Housing project by Atria Constructions in Pune, Maharashtra, registered with MahaRERA as P52100034436 on 5 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2024. 5 complaints are on record with the regulator.

At a glance

Project

  • NameRAJGRUHI RESIDENCY TOWER D
  • TypeResidential / Group Housing
  • Location
    • S. NO. 63
    • HISSA NO. 1/1
    • 1/ 2 and 2
    • KONDHWA BUDRUK
    • SHATRUNJAY MADIR ROAD
    • KONDHWA BUDRUK
    • SHATRUNJAY MADIR ROAD
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034436
  • ReraGenie IDRG-MH-27478

Builder

  • NameAtria Constructions
  • Entity typePartnership
  • GSTIN27AASFA5976B1Z5
  • PartnersSambhaji Raghunath Tupe, Anil Ramalinga Reddy, Manjusha Dhananjay Thite, Dhananjay Nivrutti Thite, Vaishali Sanjayrao Holkar, Jitendra Dilip Shinde
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJGRUHI RESIDENCY TOWER DNA310000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

RAJGRUHI RESIDENCY TOWER D: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,172 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024
LandownerVillageDistrict
WELLBUILD MERCHANTS PRIVATE LIMITEDPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI13070.32
Proposed, not sanctioned13,070 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNU FURN NO 36, PARIJAT SOCIETY LOWER GROUND FLOOR BIBVEWADI PUNE 411037

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Atria Constructions-

Litigation declared5

CaseCourtStatus
582/2024DISTRICT COURT PUNEOngoing
544/2024DISTRICT COURT PUNEOngoing
582/2024DISTRICT COURTOngoing
13292/2024HON'BLE SHRI JUSTICE B.P. COLABAWALLA HON'BLE SHRI JUSTICE FIRDOSH PHIROZE POONIWALLAOngoing
13293/2024HON'BLE SHRI JUSTICE B.P. COLABAWALLA HON'BLE SHRI JUSTICE FIRDOSH PHIROZE POONIWALLAOngoing

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12400824Dhaval Pradeep BadaniAtria Constructions20/11/2024
CC12501986Akshay Sanjay DoshiAtria Constructions18/06/2025
CC12501987Vipul Vasant JainAtria Constructions18/06/2025
CC12501988Sourabh Jagdishchand ChhajerAtria Constructions18/06/2025
CC12501994Shreyash Deepak ShahAtria Constructions18/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OCCUPANCY CERTIFICATE.pdf3 Jun 2026
Occupational CertificateFile: COVER LETTER.pdf3 Jun 2026
Occupational CertificateFile: Final High Court Order 1022 of 2025.pdf3 Jun 2026
Occupational CertificateFile: Final High Court Order 1309 of 2025.pdf3 Jun 2026
Occupational CertificateFile: SUPREME COURT ORDER.pdf3 Jun 2026
Occupational CertificateFile: FORM 4.pdf3 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf19 Jul 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf19 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 D.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 D.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 D.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD D.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A D.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 D.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Singed Form 3 Tower D_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 D.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER D.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A D.pdf13 Jan 2025
Declaration in FORM BFile: FORM B TOWER D_compressed.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TOWER D.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWER D_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 TOWER D.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER D_compressed.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A TOWER D.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-SIGNED D.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-TOWER D.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (5).pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: BOOK INVENTORY-D-PROJECT-Q-4-FY-23-24.pdf17 Apr 2024
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE D PROJECT.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVETORY.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RAJGRUHI D.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower D.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Tower D.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE RAJGRUHI D.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Rera Form 3 Q2 Tower D.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form3 Rajgruhi Resdency Tower D_compressed.pdf2 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rera Tower D.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Tower D_MRL-3-5.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Tower D_MRL-3-5.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Rera Form 3_Tower D_Atria_compressed.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cert D wing.pdf13 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate Tower D Rajgruhi .pdf13 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance Tower D Rajgruhi .pdf13 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: D Signed Form 3_compressed.pdf13 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-TOWER-D.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A-TOWER-D.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Tower D.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - TOWER-D.pdf10 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf23 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Jul 2022
Layout approvalFile: HPSC3448.pdf31 Mar 2022
Building plan approvalFile: HPSC3471.pdf31 Mar 2022
Building plan approvalFile: HPSC3476.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: HPSC3448.pdf31 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC3471.pdf31 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC3476.pdf31 Mar 2022
Declaration in FORM BFile: 2 Declaration in FORM B.pdf31 Mar 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ATRIA GRANDE PROJECT BS NO 2 Autade Handewadi Katraj Mantarwadi Road Pune 411028258CompletedDec 2021Aug 2019
ATRIA GRANDE PROJECT AS No 2 Autade Handewadi Katraj Mantarwdi Road Pune 411028258CompletedDec 2019Dec 2018
Dhanashree AashiyanaS. no. 7 Autade Handewadi Nyati Estate Road Pune 411028179CompletedOct 2016Oct 2016
Dhanashree AanganS. No. 2 Autade Handewadi Nyati Estate Road Pune 411028153CompletedMar 2015Late, Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJGRUHI RESIDENCY TOWER D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHWA BUDRUK, SHATRUNJAY MADIR ROAD13,700+ in Pune

2 kmRAJGRUHI RESIDENCY TOWERCompleted 61Lapsed / revoked 44Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 177 registered projects within 2 km.

Builder: Atria Constructions

Atria Constructions has 6 registrations on MahaRERA, including ATRIA GRANDE PROJECT A and ATRIA GRANDE PROJECT B. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RAJGRUHI RESIDENCY TOWER D is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJGRUHI RESIDENCY TOWER D?

The registered promoter entity is Atria Constructions, a partnership as per the filing. Its GSTIN 27AASFA5976B1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJGRUHI RESIDENCY TOWER D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAJGRUHI RESIDENCY TOWER D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RAJGRUHI RESIDENCY TOWER D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in RAJGRUHI RESIDENCY TOWER D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJGRUHI RESIDENCY TOWER D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJGRUHI RESIDENCY TOWER D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.