Home / Browse projects / Pune, Maharashtra / Wellwisher West Views
Wellwisher West Views
By Bhansali Infrastructure LLP
RG-MH-15355 · RERA P52100023807 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wellwisher West Views is a Residential / Group Housing project by Bhansali Infrastructure LLP in Pune, Maharashtra, registered with MahaRERA as P52100023807 on 6 Jan 2020. Possession is promised by 30 Dec 2028. 0 of the 477 units on this registration are recorded sold or booked, and 0 of 66 construction stages are filed complete.
At a glance
Project
- NameWellwisher West Views
- TypeResidential / Group Housing
- Location
- 40 mtr DP Road
- Kondhwa Pune
- kondhwa khurd
- Haveli
- Pune
- 411048
- Pincode411048
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023807
- ReraGenie IDRG-MH-15355
Builder
- NameBhansali Infrastructure LLP
- Entity typeOthers
- Named personsAbhijeet C Bhansali, Shimona Bhansali, Parth Sharesstake Pvt Ltd, Bhansali Infotech LLP
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Jan 2020
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings6 building records
- Documents filed173 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 | NA | 18 | 13 | 45 | 6 | 51 |
| A2 | NA | 18 | 12 | 52 | 0 | 52 |
| B | NA | 18 | 14 | 70 | 0 | 70 |
| C | NA | 17 | 12 | 48 | 0 | 48 |
| D | NA | 17 | 11 | 164 | 7 | 171 |
| E | NA | 17 | 11 | 84 | 1 | 85 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 0%.
A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1742
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A1 | 262 | 262 |
| A2 | 315 | 315 |
| B | 345 | 345 |
| C | 298 | 298 |
| D | 319 | 319 |
| E | 203 | 203 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Zal Khodabux Irani | wanwadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B | NA | Rs 24.45 cr | - |
| D | NA | Rs 20.26 cr | - |
| A1 | NA | Rs 18.89 cr | - |
| A2 | NA | Rs 18.73 cr | - |
| E | NA | Rs 14.26 cr | - |
| - | NA | Rs 7.00 cr | - |
| C | NA | Rs 2.59 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Milind Patil PATIL |
| Engineer | Sandip Baban Gaikwad |
| Engineer | Naeem Mutwalli |
| Chartered Accountant | Hansaria shah S & associates |
| Chartered Accountant | BHUSHAN S CHHAJED |
| Partner | Role in project |
|---|---|
| Bhansali Infrastructure LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed173
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: HIGHLIGHTED PLAN 1.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: RERA Certificate - 09-04-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: SCAN_20260420_161204862.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3-BIFLLP-March 2026_Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer's Certificate March 2020.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer's Certificate March 2020.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3-BIFLLP-Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3-BIFLLP-Dec 2025.pdf | 20 Jan 2026 |
| Form 1File: Aura- Form 1.pdf | 15 Oct 2025 |
| Form 2File: Form 2 - Aura.pdf | 15 Oct 2025 |
| Form 3File: Form 3-Aura.pdf | 15 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and unsold - Aura_compressed.pdf | 15 Oct 2025 |
| Form 1File: RERA Certificate -June 2025.pdf | 24 Jul 2025 |
| Form 3File: Form 3-BIFLLP-June 2025_Signed.pdf | 24 Jul 2025 |
| Form 2File: JUN 2025.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: JUN 2025.pdf | 24 Jul 2025 |
| Form 2A (FY 2023-2024)File: 2A- 2024.pdf | 1 Jul 2025 |
| Form 2A (FY 2022-2023)File: 2A- 2023.pdf | 1 Jul 2025 |
| Form 2A (FY 2021-2022)File: 2A -2022.pdf | 1 Jul 2025 |
| Form 2A (FY 2020-2021)File: 2A-2021.pdf | 1 Jul 2025 |
| Form 2A (FY 2019-2020)File: 2A- 2020.pdf | 1 Jul 2025 |
| Form 2File: MAR 25.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-March 2025_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Mar 2025.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Dec 2024_Signed.pdf | 24 Jun 2025 |
| Form 2File: DEC 24.pdf | 24 Jun 2025 |
| Form 1File: Dec 24.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Sep 24.pdf | 24 Jun 2025 |
| Form 2File: SEP 24.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Sept 2024_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Jun 24.pdf | 24 Jun 2025 |
| Form 2File: JUN 24.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-June 2024_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Mar 24.pdf | 24 Jun 2025 |
| Form 2File: MAR 24.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-March 2024_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Dec 23.pdf | 24 Jun 2025 |
| Form 2File: DEC 23.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-March 2024_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Sep 23.pdf | 24 Jun 2025 |
| Form 2File: SEP 23.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Sept 2023_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Jun 23.pdf | 24 Jun 2025 |
| Form 2File: JUN 23.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-June 2023_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Mar 23.pdf | 24 Jun 2025 |
| Form 2File: MAR 23.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-March 2023_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Dec 22.pdf | 24 Jun 2025 |
| Form 2File: Dec 2022.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Dec 2022_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Sep 22.pdf | 24 Jun 2025 |
| Form 2File: SEP 22.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Sept 2022_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Jun 22.pdf | 24 Jun 2025 |
| Form 2File: JUN 22.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-June 2022_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Mar 22.pdf | 24 Jun 2025 |
| Form 2File: MAR 22.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-March 2022_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
| Form 1File: Dec 21.pdf | 24 Jun 2025 |
| Form 2File: Dec 2021.pdf | 24 Jun 2025 |
| Form 3File: Form 3-BIFLLP-Dec 2021_Signed.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_compressed.pdf | 24 Jun 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 173 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Wellwisher West Views on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kondhwa Pune13,700+ in Pune
Filed coordinates, straight-line distance. 166 registered projects within 2 km.
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
BABAR CLASSIC VISTA WING A, B, C, D
Classic Properties
Builder: Bhansali Infrastructure LLP
Bhansali Infrastructure LLP has 1 registration on MahaRERA, including Wellwisher West Views. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Wellwisher West Views is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wellwisher West Views?
The registered promoter entity is Bhansali Infrastructure LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wellwisher West Views?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Wellwisher West Views?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wellwisher West Views?
The professionals named in the filing: Architect: Milind Patil PATIL; Engineer: Sandip Baban Gaikwad; Engineer: Naeem Mutwalli; Chartered Accountant: Hansaria shah S & associates; Chartered Accountant: BHUSHAN S CHHAJED. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wellwisher West Views?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.