Home / Browse projects / Nagpur, Maharashtra / KUKREJA WEST19

Registered No litigation declared Commercial project

KUKREJA WEST19

By TAGSURE HOSPITALITY LLP

RG-MH-54950 · RERA P50500054387 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 52%
114 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

KUKREJA WEST19 is a Commercial project by TAGSURE HOSPITALITY LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500054387 on 18 Jan 2024. Possession is promised by 31 Dec 2029. 0 of the 114 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameKUKREJA WEST19
  • TypeCommercial
  • Location
    • NORTH AMBAZARI ROAD
    • DHARAMPETH
    • MOUJE LENDHRA
    • Mouza LENDHRA
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054387
  • ReraGenie IDRG-MH-54950

Builder

  • NameTAGSURE HOSPITALITY LLP
  • Entity typePartnership
  • PartnersMOHIT SATISHKUMAR CHADDA, ANUJ KRISHAN CHADDA, RAHUL ROSHANLAL CHADDA, MANISH KISHANKUMAR CHADDA, AYUSHSINGH SARWANSINGH SALUJA, AVI MAHENDRAPALSINGH SALUJA, ANMOL KISHANKUMAR WADHWA, ANMOLSINGH RANJITSINGH SALUJA, RACHNA ASHEESH WADHWA, PALLAVI RAVINDRA ALURWAR, JIYA PIYUSH MAMIDWAR, ORANGE CITY BUSINESS PARK LLP LLP and 2 more

Key dates

this monthRegisteredJan 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jan 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed133 files

Current status

0%0 of 114 units booked
21.0%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIALNA33280114114

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 52%.

COMMERCIAL: 16% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)52%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes7%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed635

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots635
Closed/Covered635

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,995 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 May 2025

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI28376.47
Proposed, not sanctioned27,886 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHAWARE BHAVAN, TADOBA ROAD, DEWAI GOVINDPUR-442401
Estimated costRs 78.24 cr
Cost incurredRs 16.43 cr
Work done21.0%
BuildingWingEstimatedIncurred
COMMERCIALNARs 78.24 crRs 16.43 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLOKESH KADU
EngineerKAPIL KHUSHALANI
Chartered AccountantANKIT TALREJA
Chartered AccountantAradhya Chachra
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
Chartered AccountantUTSAV SUMIT & ASSOCIATES
PartnerRole in project
TAGSURE HOSPITALITY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 KUKREJA WEST-19 MAR-2026.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM-2 KUKREJA WEST-19 MAR-2026.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM-3 KUKREJA WEST-19 MAR-2026.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM-1 KUKREJA WEST-19 MAR-2026.pdf18 May 2026
Withdrawal Update Form 2File: FORM-2 KUKREJA WEST-19 MAR-2026.pdf18 May 2026
Withdrawal Update Form 3File: FORM-3 KUKREJA WEST-19 MAR-2026.pdf18 May 2026
Building plan approvalFile: Revised Plan-1-6.pdf6 Mar 2026
Building plan approvalFile: Revised Plan-7-13.pdf6 Mar 2026
Withdrawal Update Form 1File: form 1 march 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: form 1 march 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 SEPTEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: form 2 march.pdf5 Mar 2026
Withdrawal Update Form 2File: form 2 march.pdf5 Mar 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: FORM 2 SEPTEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: FORM 2 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: form 2 december 2025.pdf5 Mar 2026
Withdrawal Update Form 2File: form 2 december 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 MARCH 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 MARCH 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 JUNE.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 SEPTEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 3File: FORM 3 DECEMBER 2025.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf4 Mar 2026
Withdrawal Update Form 3File: FORM 3 june 2025.pdf4 Mar 2026
Withdrawal Update Form 1File: FORM-1.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM-1_MARCH-2025.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM-1_June-2025.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM-1_Sep-2025.pdf2 Mar 2026
Withdrawal Update Form 1File: FORM-1_Dec-2025.pdf2 Mar 2026
Withdrawal Update Form 2File: Form 2 - Engineer.pdf2 Mar 2026
Withdrawal Update Form 2File: FORM-2_MARCH-2025.pdf2 Mar 2026
Withdrawal Update Form 2File: FORM-2_June-2025.pdf2 Mar 2026
Withdrawal Update Form 2File: FORM-2_Sep-2025.pdf2 Mar 2026
Withdrawal Update Form 2File: FORM-2_Dec-2025.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM-3.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM-3_MARCH-2025.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM-3_June-2025.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM-3_Sep-2025.pdf2 Mar 2026
Withdrawal Update Form 3File: FORM-3_Dec-2025.pdf2 Mar 2026
Form 2A (FY 2024-2025)File: FORM-2A_MARCH-2025.pdf2 Mar 2026
Form 2A (FY 2023-2024)File: FORM-2A_MARCH-24.pdf2 Mar 2026
Form 5 (FY 2023-2024)File: FORM-_MARCH-2024.pdf2 Mar 2026
Form 5 (FY 2024-2025)File: FORM-5_MARCH-2025.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1 - Architech.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 - Engineer.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 - CA certificate_.pdf26 Nov 2025
Withdrawal Update Form 1File: Architect Certificate Q1 portal.pdf14 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf14 Nov 2025
Withdrawal Update Form 3File: CA Certificate.pdf14 Nov 2025
Withdrawal Update Form 1File: Architectu0027s Certificate - Maru002725.pdf12 Jun 2025
Withdrawal Update Form 1File: Architectu0027s Certificate - Maru002725.pdf12 Jun 2025
Withdrawal Update Form 2File: Engineers Certificate - Maru002725.pdf12 Jun 2025
Withdrawal Update Form 2File: Engineers Certificate - Maru002725.pdf12 Jun 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_.pdf12 Jun 2025
Withdrawal Update Form 3File: Withdrawal Application Form3_.pdf12 Jun 2025
Form 1File: Architect's Certificate - Mar'25.pdf23 May 2025
Form 2File: Engineers Certificate - Mar'25.pdf23 May 2025
Form 3File: CA Certificate - Mar'25.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf23 May 2025
Self-declaration of Quarterly ProgressFile: Form D - Commencement.pdf23 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital West-19_Mar-2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital West-19_Jun-2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital West-19_Sep-2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Capital West-19_Dec-2024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Dec-24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Sep-24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_June-24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_MAR-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_MAR-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_JUne-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_Sep-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_Dec-24.pdf21 Feb 2025

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUKREJA WEST19 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUJE LENDHRA2,800+ in Nagpur

2 kmKUKREJA WEST19Completed 29Lapsed / revoked 16Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: TAGSURE HOSPITALITY LLP

TAGSURE HOSPITALITY LLP has 1 registration on MahaRERA, including KUKREJA WEST19. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KUKREJA WEST19 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUKREJA WEST19?

The registered promoter entity is TAGSURE HOSPITALITY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUKREJA WEST19?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUKREJA WEST19?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUKREJA WEST19?

The professionals named in the filing: Architect: LOKESH KADU; Engineer: KAPIL KHUSHALANI; Chartered Accountant: ANKIT TALREJA; Chartered Accountant: Aradhya Chachra; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES; Chartered Accountant: UTSAV SUMIT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUKREJA WEST19?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUKREJA WEST19. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUKREJA WEST19 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.