ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RAGHAV ENCLAVE

Registered No litigation declared Residential / Group Housing project

RAGHAV ENCLAVE

By RAGHAV RAJ BUILDERS & DEVELOPERS LLP

RG-MH-07662 · RERA P51800054464 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 32.00 crore secured on the land, in favour of HERO HOUSING FINANCE LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 10Construction stages donefurthest along: Stilt Floor, 85%
29 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

RAGHAV ENCLAVE is a Residential / Group Housing project by RAGHAV RAJ BUILDERS & DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054464 on 25 Jan 2024. Possession is promised by 31 Dec 2027. 18 of the 47 units on this registration are recorded sold or booked, and 4 of 10 construction stages are filed complete.

At a glance

Project

  • NameRAGHAV ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • NEHRU NAGAR
    • KURLA EAST
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054464
  • ReraGenie IDRG-MH-07662

Builder

  • NameRAGHAV RAJ BUILDERS & DEVELOPERS LLP
  • Entity typePartnership
  • LLPINAAD-0888
  • LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSUDHANSHU RAMAVTAR AGARWAL, SUSHMA LALIT GOLECHA
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

38%18 of 47 units booked
32.8%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAGHAV ENCLAVENA181847047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 10 construction stages are filed complete. The stage furthest along is Stilt Floor, at 85%.

RAGHAV ENCLAVE: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered76

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area855 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofHERO HOUSING FINANCE LIMITED
Secured amountRs 32.00 crore
CERSAI search filedYes
Declared on27 Jun 2025
LandownerVillageDistrict
SHREE DWARKADHISH CHSLAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI6670.17
Proposed, not sanctioned6,503 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMORYA ESTATE OPP INFINITY MALL
Estimated costRs 37.12 cr
Cost incurredRs 12.16 cr
Work done32.75%
BuildingWingEstimatedIncurred
RAGHAV ENCLAVENARs 30.93 crRs 12.16 cr
-NARs 6.19 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIVE CONSULTANCY
EngineerMr. Mohd. Furkhan Ibrahim Pettiwala
Chartered AccountantPreeti Golecha
Chartered AccountantG.P. Sharma & Co. LLP
PartnerRole in project
RAGHAV RAJ BUILDERS & DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1- Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1- Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2-Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2-Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3- Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3- Raghav Enclave (30th June 2026).pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate March 2026.pdf7 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate March 2026.pdf7 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate December 2025.pdf7 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate December 2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate September 2025.pdf7 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate December 2025.pdf7 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf8 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf8 Dec 2025
Form 1File: Form 1 Architects Certificate March 2024.pdf3 Nov 2025
Form 2File: Form 2 Engineers Certificate March 2024.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate March 2024.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2024.pdf3 Nov 2025
Form 1File: Form 1 Architects Certificate June 2024.pdf3 Nov 2025
Form 2File: Form 2 Engineers Certificate June 2024.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate June 2024.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - June 2024.pdf3 Nov 2025
Form 1File: Form 1 Architects Certificate September 2024.pdf3 Nov 2025
Form 2File: Form 2 Engineers Certificate September 2024.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate ( September 2024 ).pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - September 2024.pdf3 Nov 2025
Form 1File: Form 1 Architects Certificate December 2024.pdf3 Nov 2025
Form 2File: Form 2 Engineers Certificate December 2024.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate December 2024.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - December 2024.pdf3 Nov 2025
Form 1File: Form 1 Architects Certificate March 2025.pdf3 Nov 2025
Form 2File: Form 2 Engineers Certificate March 2025.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate March 2025.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2025.pdf3 Nov 2025
Withdrawal Update Form 1File: Form 1 Architects Certificate June 2025.pdf3 Nov 2025
Withdrawal Update Form 1File: Form 1 Architects Certificate September 2025.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate June 2025.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate September 2025.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate June 2025.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate September 2025 Update.pdf3 Nov 2025
Commencement Certificates / NA Order for plotted developmentFile: Further CC up to 6th Floor of B No 153B _250507_192234.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2025.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2025.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA Certificate March 2025.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf7 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: IOA Plan Amended - enclave.pdf27 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: IOA AMENDED.pdf25 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: IOA Plan Amended.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate December 2024.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate December 2024.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate December 2024.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate December 2024.pdf7 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate September 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate September 2024.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate September 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate September 2024.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QA Certificate June 2024.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate June 2024.pdf6 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: GRO- Declaration Enclave.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate March 2024.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate March 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QA Certificate March 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2024.pdf9 Apr 2024
Layout approvalFile: Building layout 153B.pdf18 Jan 2024
Building plan approvalFile: drawing.pdf18 Jan 2024
PAN CardFile: PAN RRBD.pdf18 Jan 2024
Copy of the legal title reportFile: Legal Title Certificate Bld No 153B.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance RAGHAV ENCLAVE.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance RAGHAV ENCLAVE.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance RAGHAV ENCLAVE.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance RAGHAV ENCLAVE.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Building layout 153B.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: drawing.pdf18 Jan 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RAGHAV MARVELP51800045396Nehrunagar, Mumbai Suburban-May 2022CompletedAug 2025Registered original: Aug 2024Aug 2025
RAGHAV AMARAP51800030338Kurla East, Mumbai Suburban-Aug 2021CompletedSep 2024Registered original: Jul 2023Sep 2024
RAGHAV ONE45KURLA EAST93-CompletedFeb 2023Feb 2023
RAGHAV ONEP51800020496Nehru Nagar, Mumbai Suburban-Apr 2019CompletedJun 2021Late, Dec 2021

How this compares with Mumbai Suburban

38%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAGHAV ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA EAST6,700+ in Mumbai Suburban

2 kmRAGHAV ENCLAVECompleted 107Lapsed / revoked 91Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 330 registered projects within 2 km.

Builder: RAGHAV RAJ BUILDERS & DEVELOPERS LLP

RAGHAV RAJ BUILDERS & DEVELOPERS LLP has 10 registrations on MahaRERA, including RAGHAV ONE and RAGHAV ONE45. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RAGHAV ENCLAVE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAGHAV ENCLAVE?

The registered promoter entity is RAGHAV RAJ BUILDERS & DEVELOPERS LLP, a partnership as per the filing. Its LLPIN AAD-0888 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAGHAV ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAGHAV ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAGHAV ENCLAVE?

The professionals named in the filing: Architect: CREATIVE CONSULTANCY; Engineer: Mr. Mohd. Furkhan Ibrahim Pettiwala; Chartered Accountant: Preeti Golecha; Chartered Accountant: G.P. Sharma & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAGHAV ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAGHAV ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAGHAV ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.