Registered No litigation declared Others project

Ruparel Urbana

By R R Builders

RG-MH-18775 · RERA P51800077585 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
17 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 90%
278 of 490Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 272 documents Report an error

Ruparel Urbana is a Others project by R R Builders in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077585 on 15 Oct 2024. Possession is promised by 31 Dec 2028. 212 of the 490 units on this registration are recorded sold or booked, and 17 of 77 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameRuparel Urbana
  • TypeOthers
  • Location
    • S G Barve Marg
    • Kurla
    • Chembur
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800077585
  • ReraGenie IDRG-MH-18775

Builder

  • NameR R Builders
  • Entity typePartnership
  • GSTIN27AAAFR8678K2ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAmit Mahendra Ruparel
  • DirectorsParikshit Sharma, Pradeep Ahire
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings7 building records
  • Documents filed272 files

Current status

43%212 of 490 units booked
19.6%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ruparel Urbana Wing GNA181870777
Ruparel Urbana Wing FNA181852557
Ruparel Urbana Wing ENA181870676
Ruparel Urbana Wing DNA191980080
Ruparel Urbana Wing CNA191967067
Ruparel Urbana Wing BNA191966066
Ruparel Urbana Wing ANA191966167

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 90%.

Ruparel Urbana Wing G8%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing F15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor30%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing E33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing D32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing C22%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor33%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing B43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ruparel Urbana Wing A43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed458

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots458
Closed/Covered458
BuildingClosed/CoveredTotal
Ruparel Urbana Wing G8080
Ruparel Urbana Wing F6060
Ruparel Urbana Wing E8080
Ruparel Urbana Wing D9898
Ruparel Urbana Wing C8484
Ruparel Urbana Wing B2828
Ruparel Urbana Wing A2828

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,999 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Apr 2026
LandownerVillageDistrict
Naik Nagar Co Op Housing Society LimitedKurlaMumbai Suburban
R R BuildersOthersMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI26995.68
Proposed, not sanctioned26,963 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Bombay Hub, Z Wing, Kamla Mill Compound, Senapati Bapat Marg, Lower Parel, Mumbai.400013, Maharashtra
Estimated costRs 246.36 cr
Cost incurredRs 48.36 cr
Work done19.63%
BuildingWingEstimatedIncurred
Ruparel Urbana Wing DNARs 45.44 crRs 11.25 cr
Ruparel Urbana Wing ENARs 38.53 crRs 9.77 cr
Ruparel Urbana Wing GNARs 38.53 crRs 2.20 cr
Ruparel Urbana Wing FNARs 33.49 crRs 1.95 cr
Ruparel Urbana Wing BNARs 32.58 crRs 8.66 cr
Ruparel Urbana Wing CNARs 32.35 crRs 8.03 cr
Ruparel Urbana Wing ANARs 25.43 crRs 6.51 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Rahul Kamathi
EngineerSanjeev R Sinha
EngineerAjay Pandurang Gade
Chartered AccountantShereena Jacob
Chartered AccountantSarvershwar Sharma
PartnerRole in project
R R Builders-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12501900Amarendra Nath MisraR R Builders10/06/2025
CC12502400Vikas JadhavR R Builders15/07/2025
CC12502784Prashant Babaji GaikwadR R Builders07/08/2025
CC12600450Suvarna Vasant RajguruSuvarna vasant rajguru24/01/2026
CC12602428Karishma Hemant TekR R Builders25/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed272

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 272 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Ruparel Urbana 31032026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Urbana 31032026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Urbana 31032026.pdf27 Apr 2026
Commencement certificateFile: Further CC Extended for Wing A to D upto 4th Floor and Wing E upto 7th Floor dt 030725.pdf8 Apr 2026
Commencement certificateFile: Further CC Extended for Wing A to D upto 4th Floor and Wing E upto 7th Floor dt 030725.pdf8 Apr 2026
Commencement certificateFile: Further CC Extended for Wing A to D upto 4th Floor and Wing E upto 7th Floor dt 030725.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Urbana 30092025.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Urbana 30092025.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Urbana 30092025.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Urbana 30092025.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Urbana 31122025.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Urbana 31122025.pdf8 Apr 2026
Form 1File: Ruparel Urbana Form 1 31032025.pdf29 May 2025
Form 2File: Ruparel Urbana Form 2 31032025.pdf29 May 2025
Form 3File: Ruparel Urbana Form 3 31032025 compressed.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Urbana Sold Unsold Invnetory 31032025.pdf29 May 2025
Self-declaration of Quarterly ProgressFile: Ruparel Urbana Self Declaration Letter 31032025.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ruparel Urbana-Form-1.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ruparel Urbana-Form-3 compressed.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ruparel Urbana-Form-2.pdf4 Apr 2025
Details of encumbrances concerned to FinanceFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Details of encumbrances concerned to FinanceFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Details of encumbrances concerned to FinanceFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Ruparel Urbana Financial Legal Encumbrance.pdf7 Oct 2024
Building plan approvalFile: 28.pdf13 Aug 2024
Building plan approvalFile: 27.pdf13 Aug 2024
Building plan approvalFile: 26.pdf13 Aug 2024
Building plan approvalFile: 25.pdf13 Aug 2024
Building plan approvalFile: 24.pdf13 Aug 2024
Building plan approvalFile: 23.pdf13 Aug 2024
Building plan approvalFile: 22.pdf13 Aug 2024
Building plan approvalFile: 21.pdf13 Aug 2024
Building plan approvalFile: 20.pdf13 Aug 2024
Building plan approvalFile: 19.pdf13 Aug 2024
Building plan approvalFile: 18.pdf13 Aug 2024
Building plan approvalFile: 17.pdf13 Aug 2024
Building plan approvalFile: 16.pdf13 Aug 2024
Building plan approvalFile: 15.pdf13 Aug 2024
Building plan approvalFile: 14.pdf13 Aug 2024
Building plan approvalFile: 13.pdf13 Aug 2024
Building plan approvalFile: 12.pdf13 Aug 2024
Building plan approvalFile: 11.pdf13 Aug 2024
Building plan approvalFile: 10.pdf13 Aug 2024
Building plan approvalFile: 9.pdf13 Aug 2024
Building plan approvalFile: 8.pdf13 Aug 2024
Building plan approvalFile: 7.pdf13 Aug 2024
Building plan approvalFile: 6.pdf13 Aug 2024
Building plan approvalFile: 5.pdf13 Aug 2024
Building plan approvalFile: 4.pdf13 Aug 2024
Building plan approvalFile: 3.pdf13 Aug 2024
Building plan approvalFile: 2.pdf13 Aug 2024
Building plan approvalFile: 1.pdf13 Aug 2024
Layout approvalFile: 5-1 Copy of Layout Approval (in case of layout).pdf13 Aug 2024
Building plan approvalFile: 28.pdf13 Aug 2024
Building plan approvalFile: 27.pdf13 Aug 2024
Building plan approvalFile: 26.pdf13 Aug 2024
Building plan approvalFile: 25.pdf13 Aug 2024
Building plan approvalFile: 24.pdf13 Aug 2024
Building plan approvalFile: 23.pdf13 Aug 2024
Building plan approvalFile: 22.pdf13 Aug 2024
Building plan approvalFile: 21.pdf13 Aug 2024
Building plan approvalFile: 20.pdf13 Aug 2024
Building plan approvalFile: 19.pdf13 Aug 2024
Building plan approvalFile: 18.pdf13 Aug 2024
Building plan approvalFile: 17.pdf13 Aug 2024
Building plan approvalFile: 16.pdf13 Aug 2024
Building plan approvalFile: 15.pdf13 Aug 2024
Building plan approvalFile: 14.pdf13 Aug 2024
Building plan approvalFile: 13.pdf13 Aug 2024
Building plan approvalFile: 12.pdf13 Aug 2024
Building plan approvalFile: 11.pdf13 Aug 2024
Building plan approvalFile: 10.pdf13 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RUPAREL VIVANZAP51900003595Byculla East694Aug 2017OngoingMar 2027Registered original: Jun 2025Not due yet

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ruparel Urbana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

Builder: R R Builders

R R Builders has 5 registrations on MahaRERA, including RUPAREL VIVANZA and HILL GALAXY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ruparel Urbana is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ruparel Urbana?

The registered promoter entity is R R Builders, a partnership as per the filing. Its GSTIN 27AAAFR8678K2ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ruparel Urbana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ruparel Urbana?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ruparel Urbana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ruparel Urbana?

The professionals named in the filing: Architect: Mr Rahul Kamathi; Engineer: Sanjeev R Sinha; Engineer: Ajay Pandurang Gade; Chartered Accountant: Shereena Jacob; Chartered Accountant: Sarvershwar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ruparel Urbana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ruparel Urbana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ruparel Urbana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.