Red flags
- 4 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ruparel Crest is a Others project by BHARAT MAHAN DEVELOPERS & BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052788 on 25 Sep 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 230 of the 277 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameRuparel Crest
- TypeOthers
- Location
- S.G. Barve Marg
- Kurla East
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800052788
- ReraGenie IDRG-MH-06479
Builder
- NameBHARAT MAHAN DEVELOPERS & BUILDERS
- Entity typePartnership
- GSTIN27AAFFB0684E1ZO
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersBALASAHEB KASHINATH SHINDE, NANDKUMAR MALKU PATIL, MOHAMMED SALIM ABDUL MALIK, AYUB ALI KHAN, SHRIKANT DIGMBER SHITOLE, INNOVATIVE AGRO ESTATES PVT LTD THROUGH DHANANJAY SHIVRAM MANE, A A JADHAV
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Sep 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings3 building records
- Documents filed123 files
Current status
Figures as on 2 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 19 | 19 | 99 | 13 | 112 |
| Wing B | NA | 18 | 18 | 97 | 16 | 113 |
| Wing C | NA | 18 | 18 | 52 | 0 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 85%.
Wing A33%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 68% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 36% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed152
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A | 61 | 61 |
| Wing B | 61 | 61 |
| Wing C | 30 | 30 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 49.84 cr | Rs 24.56 cr |
| Wing B | NA | Rs 42.63 cr | Rs 27.55 cr |
| Wing C | NA | Rs 20.59 cr | Rs 12.91 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rahul Kamathi |
| Architect | Girish Nerurkar |
| Engineer | JW Consultants |
| Engineer | Sanjeev Sinha |
| Engineer | Ajay Gade |
| Chartered Accountant | S Jacob and Co |
| Chartered Accountant | Shereena Sharma |
| Chartered Accountant | Sarvershwar |
| Chartered Accountant | Shereena Jacob |
| Partner | Role in project |
|---|---|
| BHARAT MAHAN DEVELOPERS & BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterM/s. Bharat Mahan Builders & Developers, promoter of the project “Ruparel Crest” (MahaRERA Registration No. P51800052788), seeks extension of the project completion date up to 31st December 2026 under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. The project is a residential redevelopment under Regulation 33(10) of DCPR 2034, comprising a single composite building with four wings-A, B and C having Basement + Ground + 18 floors and Wing D having Basement + Ground + 18 floors with part residential floors-along with two parking towers. The latest RERA registration certif
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000429083 | Archana and Saroj Kumar Mahto | Bharat Mahan Developers & Builders | 02/02/2024 |
| CC006000000580937 | Swapnil Kesarkar | Ruparel Infra and Realty Pvt Ltd | 27/06/2024 |
| CC12501629 | Sameer Yusuf Choudhary | Ashlesha Tambe | 20/05/2025 |
| CC12600884 | BHARAT MAHAN DEVELOPERS & BUILDERS | Mr Noor Mohammed Haroon Shaikh | 18/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: CC Further Extended upto 16th Upper Floor dated 25112025.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Crest.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf | 22 Jan 2026 |
| Form 2A (FY 2023-2024)File: Ruparel Crest Form 2A.pdf | 24 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A March 25.pdf | 24 Nov 2025 |
| Form 2A (FY 2025-2026)File: Form 2A March 26.pdf | 24 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5 Ruparel Crest FY23-24.pdf | 24 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Ruparel Crest FY24-25.pdf | 24 Nov 2025 |
| Form 1File: Ruparel Crest Form 1 30062025.pdf | 20 Nov 2025 |
| Form 2File: Ruparel Crest Form 2 30062025.pdf | 20 Nov 2025 |
| Form 3File: Ruparel Crest Form 3 30062025.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold 30062025.pdf | 20 Nov 2025 |
| Form 1File: Form 1 Ruparel Crest 30092025.pdf | 20 Nov 2025 |
| Form 2File: Form 2 Ruparel Crest 30092025.pdf | 20 Nov 2025 |
| Form 3File: Form 3 Ruparel Crest 30092025.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold Inventory 30092025.pdf | 20 Nov 2025 |
| Form 1File: Form 1 Ruparel Crest 31032025.pdf | 27 May 2025 |
| Form 2File: Form 2 Ruparel Crest 31032025.pdf | 27 May 2025 |
| Form 3File: Form 3 Ruparel Crest 31032025 Final.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold Invnetory 31032025.pdf | 27 May 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Letter Ruparel Crest.pdf | 27 May 2025 |
| Layout approvalFile: Ruparel Crest Plan Page 1.pdf | 13 May 2025 |
| Layout approvalFile: Ruparel Crest Plan Page 2.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 1.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 2.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 3.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 4.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 5.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 6.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 7.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 8.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 9.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 10.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 11.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 12.pdf | 13 May 2025 |
| Building plan approvalFile: Ruparel Crest Plan Page 13.pdf | 13 May 2025 |
| Copy of Layout Approval (in case of layout)File: Ruparel Crest Plan Page 1.pdf | 13 May 2025 |
| Copy of Layout Approval (in case of layout)File: Ruparel Crest Plan Page 2.pdf | 13 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 04 CC Further Extended upto 14th Upper Flr for Wing A to D.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 1.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 2.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 3.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 4.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 5.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 6.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 7.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 8.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 9.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 10.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 11.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 12.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 13.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ruparel Crest 31032025.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ruparel Crest 31032025 compressed.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ruparel Crest 31032025 Final_compressed.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ruparel Crest 31032025.pdf | 9 May 2025 |
| Proforma of Agreement for saleFile: AFS Ruparel Crest Final.pdf | 19 Apr 2024 |
| Layout approvalFile: IMG_0001_11zon.pdf | 8 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: IMG_0001_11zon.pdf | 8 Apr 2024 |
| Other - TechnicalFile: 4592_240105144659_001.pdf | 5 Feb 2024 |
| Building plan approvalFile: Plans-1_compressed.pdf | 20 Jan 2024 |
| Building plan approvalFile: Plans-2_compressed.pdf | 20 Jan 2024 |
| Building plan approvalFile: Plans-3_compressed.pdf | 20 Jan 2024 |
| Building plan approvalFile: Plans-5_compressed.pdf | 20 Jan 2024 |
| Building plan approvalFile: Plans-6_compressed.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plans-1_compressed.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plans-2_compressed.pdf | 20 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ruparel Crest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurla East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 347 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
ROHA VATIKA-ROHA KUMUD
Roha Realty Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: BHARAT MAHAN DEVELOPERS & BUILDERS
BHARAT MAHAN DEVELOPERS & BUILDERS has 2 registrations on MahaRERA, including ORCHID METROPOLIS and Ruparel Crest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Ruparel Crest is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ruparel Crest?
The registered promoter entity is BHARAT MAHAN DEVELOPERS & BUILDERS, a partnership as per the filing. Its GSTIN 27AAFFB0684E1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ruparel Crest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ruparel Crest?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ruparel Crest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ruparel Crest?
The professionals named in the filing: Architect: Rahul Kamathi; Architect: Girish Nerurkar; Engineer: JW Consultants; Engineer: Sanjeev Sinha; Engineer: Ajay Gade; Chartered Accountant: S Jacob and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ruparel Crest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback