Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
8 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 85%
47 of 277Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Ruparel Crest is a Others project by BHARAT MAHAN DEVELOPERS & BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052788 on 25 Sep 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 230 of the 277 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameRuparel Crest
  • TypeOthers
  • Location
    • S.G. Barve Marg
    • Kurla East
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052788
  • ReraGenie IDRG-MH-06479

Builder

  • NameBHARAT MAHAN DEVELOPERS & BUILDERS
  • Entity typePartnership
  • GSTIN27AAFFB0684E1ZO
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBALASAHEB KASHINATH SHINDE, NANDKUMAR MALKU PATIL, MOHAMMED SALIM ABDUL MALIK, AYUB ALI KHAN, SHRIKANT DIGMBER SHITOLE, INNOVATIVE AGRO ESTATES PVT LTD THROUGH DHANANJAY SHIVRAM MANE, A A JADHAV
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed123 files

Current status

83%230 of 277 units booked
57.5%Work done, per cost certificate

Figures as on 2 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA19199913112
Wing BNA18189716113
Wing CNA181852052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 85%.

Wing A33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure68%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises36%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks58%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed152

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots152
Closed/Covered152
BuildingClosed/CoveredTotal
Wing A6161
Wing B6161
Wing C3030

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,302 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on2 Apr 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI16501.16
Proposed, not sanctioned16,501 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamala Mill Compound Lower Parel
Estimated costRs 113.06 cr
Cost incurredRs 65.02 cr
Work done57.51%
BuildingWingEstimatedIncurred
Wing ANARs 49.84 crRs 24.56 cr
Wing BNARs 42.63 crRs 27.55 cr
Wing CNARs 20.59 crRs 12.91 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Kamathi
ArchitectGirish Nerurkar
EngineerJW Consultants
EngineerSanjeev Sinha
EngineerAjay Gade
Chartered AccountantS Jacob and Co
Chartered AccountantShereena Sharma
Chartered AccountantSarvershwar
Chartered AccountantShereena Jacob
PartnerRole in project
BHARAT MAHAN DEVELOPERS & BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17122518733Dec 2025 → Dec 2026

Reason as filed by the promoterM/s. Bharat Mahan Builders & Developers, promoter of the project “Ruparel Crest” (MahaRERA Registration No. P51800052788), seeks extension of the project completion date up to 31st December 2026 under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. The project is a residential redevelopment under Regulation 33(10) of DCPR 2034, comprising a single composite building with four wings-A, B and C having Basement + Ground + 18 floors and Wing D having Basement + Ground + 18 floors with part residential floors-along with two parking towers. The latest RERA registration certif

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000429083Archana and Saroj Kumar MahtoBharat Mahan Developers & Builders02/02/2024
CC006000000580937Swapnil KesarkarRuparel Infra and Realty Pvt Ltd27/06/2024
CC12501629Sameer Yusuf ChoudharyAshlesha Tambe20/05/2025
CC12600884BHARAT MAHAN DEVELOPERS & BUILDERSMr Noor Mohammed Haroon Shaikh18/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: CC Further Extended upto 16th Upper Floor dated 25112025.pdf2 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Crest.pdf2 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 Ruparel Crest 30112025.pdf22 Jan 2026
Form 2A (FY 2023-2024)File: Ruparel Crest Form 2A.pdf24 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A March 25.pdf24 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A March 26.pdf24 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 Ruparel Crest FY23-24.pdf24 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Ruparel Crest FY24-25.pdf24 Nov 2025
Form 1File: Ruparel Crest Form 1 30062025.pdf20 Nov 2025
Form 2File: Ruparel Crest Form 2 30062025.pdf20 Nov 2025
Form 3File: Ruparel Crest Form 3 30062025.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold 30062025.pdf20 Nov 2025
Form 1File: Form 1 Ruparel Crest 30092025.pdf20 Nov 2025
Form 2File: Form 2 Ruparel Crest 30092025.pdf20 Nov 2025
Form 3File: Form 3 Ruparel Crest 30092025.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold Inventory 30092025.pdf20 Nov 2025
Form 1File: Form 1 Ruparel Crest 31032025.pdf27 May 2025
Form 2File: Form 2 Ruparel Crest 31032025.pdf27 May 2025
Form 3File: Form 3 Ruparel Crest 31032025 Final.pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Crest Sold Unsold Invnetory 31032025.pdf27 May 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Letter Ruparel Crest.pdf27 May 2025
Layout approvalFile: Ruparel Crest Plan Page 1.pdf13 May 2025
Layout approvalFile: Ruparel Crest Plan Page 2.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 1.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 2.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 3.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 4.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 5.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 6.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 7.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 8.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 9.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 10.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 11.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 12.pdf13 May 2025
Building plan approvalFile: Ruparel Crest Plan Page 13.pdf13 May 2025
Copy of Layout Approval (in case of layout)File: Ruparel Crest Plan Page 1.pdf13 May 2025
Copy of Layout Approval (in case of layout)File: Ruparel Crest Plan Page 2.pdf13 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 04 CC Further Extended upto 14th Upper Flr for Wing A to D.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 1.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 2.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 3.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 4.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 5.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 6.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 7.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 8.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 9.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 10.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 11.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 12.pdf13 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Ruparel Crest Plan Page 13.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ruparel Crest 31032025.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ruparel Crest 31032025 compressed.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ruparel Crest 31032025 Final_compressed.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ruparel Crest 31032025.pdf9 May 2025
Proforma of Agreement for saleFile: AFS Ruparel Crest Final.pdf19 Apr 2024
Layout approvalFile: IMG_0001_11zon.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: IMG_0001_11zon.pdf8 Apr 2024
Other - TechnicalFile: 4592_240105144659_001.pdf5 Feb 2024
Building plan approvalFile: Plans-1_compressed.pdf20 Jan 2024
Building plan approvalFile: Plans-2_compressed.pdf20 Jan 2024
Building plan approvalFile: Plans-3_compressed.pdf20 Jan 2024
Building plan approvalFile: Plans-5_compressed.pdf20 Jan 2024
Building plan approvalFile: Plans-6_compressed.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Plans-1_compressed.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Plans-2_compressed.pdf20 Jan 2024

How this compares with Mumbai Suburban

83%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ruparel Crest on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla East6,700+ in Mumbai Suburban

2 kmRuparel CrestCompleted 108Lapsed / revoked 96Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 347 registered projects within 2 km.

Builder: BHARAT MAHAN DEVELOPERS & BUILDERS

BHARAT MAHAN DEVELOPERS & BUILDERS has 2 registrations on MahaRERA, including ORCHID METROPOLIS and Ruparel Crest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ruparel Crest is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ruparel Crest?

The registered promoter entity is BHARAT MAHAN DEVELOPERS & BUILDERS, a partnership as per the filing. Its GSTIN 27AAFFB0684E1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ruparel Crest?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ruparel Crest?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ruparel Crest?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ruparel Crest?

The professionals named in the filing: Architect: Rahul Kamathi; Architect: Girish Nerurkar; Engineer: JW Consultants; Engineer: Sanjeev Sinha; Engineer: Ajay Gade; Chartered Accountant: S Jacob and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ruparel Crest?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ruparel Crest. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ruparel Crest to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.