ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / RADHA KRISHNA RESIDENCY

Registered No litigation declared Residential / Group Housing project

RADHA KRISHNA RESIDENCY

By RADHA KRISHNA REALTY

RG-MH-03101 · RERA P99000020418 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 92%
47 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

RADHA KRISHNA RESIDENCY is a Residential / Group Housing project by RADHA KRISHNA REALTY in Palghar, Maharashtra, registered with MahaRERA as P99000020418 on 9 Apr 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 79 of the 126 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.

At a glance

Project

  • NameRADHA KRISHNA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • MAHIM ROAD
    • TEMBHODE
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000020418
  • ReraGenie IDRG-MH-03101

Builder

  • NameRADHA KRISHNA REALTY
  • Entity typePartnership
  • GSTIN27AAYFR8167K1Z2
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAMASHANKAR K YADAV, RAMSAKAL YADAV, SHIVDEV SHUKLA, DIPESH S MISHRA, SHYAMSUNDER PANDHARI YADAV
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2019First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Apr 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed134 files

Current status

63%79 of 126 units booked
85.3%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B NO 1 WING A BNA6654054
B NO 3 WING A BNA6672072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 92%.

B NO 1 WING A B69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.47%
B NO 3 WING A B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes45%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,580 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHASHIKANT R PATILPalghar Palghar

Approvals and building plan

Permissible FSI3920.77
Proposed, not sanctioned3,098 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO A/1 TANVI COMPLEX, TANISHKA BUILDING, NEAR PETROL PUMP,DAHISAR EAST, MUMBAI 400068
Estimated costRs 11.78 cr
Cost incurredRs 10.05 cr
Work done85.32%
BuildingWingEstimatedIncurred
B NO 1 WING A BNARs 7.64 crRs 6.19 cr
B NO 3 WING A BNARs 3.43 crRs 3.43 cr
-NARs 70.00 lakhRs 42.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY MALOO
EngineerVISHNU JADHAV OF SUPREME ENGINEERING
EngineerCENTRE LINE CONSULTANTS & ENGINEERS
Chartered AccountantVIPUL JAIN
PartnerRole in project
RADHA KRISHNA REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018248Dec 2023 → Dec 2024

Reason as filed by the promoterDELAY DUE TO AMENDMENT IN PLAN, PLANNING DELAYS AND COVID 19 PANDEMIC

EXT99000025107Dec 2023 → Dec 2026

Reason as filed by the promoterWe had applied for change in plans, accordingly revised Commencement Certificate was issued on 20.05.2022 and layout plans was approved on 21.06.2022 by Palghar Municipal Corporation. Kindly note that floors were increased during this revision, however, revised Development Agreement could not be signed with landowner due to negotiation and it could be finally signed on 09.02.2023. This has caused delay in completion of originally estimated completion date. We are attaching copy of revised plans and DA for your kind perusal. Kindly note that we had already completed Bldg 3 and given possessions

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Aug 2024

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 qtr 4 RKR.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 QTR 4 RKR.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3 MAR 26.pdf6 May 2026
Withdrawal Update Form 1File: FORM 1 QTR 2.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 QTR 3 .pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Compressed.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 QTR 3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Qtr 2 compressed.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 QTR 3 compressed.pdf20 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 4 2425.pdf16 May 2025
Certificates of CA (Form 3)File: FORM 3 QTR 4 2425.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QTR 4 2425.pdf16 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 4 2425.pdf16 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC-24.pdf18 Jan 2025
Certificates of CA (Form 3)File: FORM 3 DEC-24.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC-24.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DEC-24.pdf18 Jan 2025
CERSAI detailsFile: CERSAI.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Jun23_compressed.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sep 23_compressed.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 24.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM 3 JUNE 24_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: FORM 3 SEP 24_compressed.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 24.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2324_compressed.pdf28 Dec 2024
Declaration in FORM BFile: Affidavit Cum Declaration Notarized.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf19 Nov 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT.pdf19 Nov 2024
Declaration in FORM BFile: Affidavit Cum Declaration Notarized.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Nov 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf19 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf19 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC RADHA KRISHNA.PDF5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Compressed.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Compressed.pdf27 Jul 2024
Certificates of CA (Form 3)File: FORM 3 Compressed.pdf27 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2122 WITH SIGN.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A MAR 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: 2A MAR 23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Jun23_compressed.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sep 23_compressed.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Dec 23_compressed.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032023 cOMPRESSED.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Jun23_Compressed.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sep23_compressed.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Dec23_compressed.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QTR 4 202223_COMPRESSED.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Jun23_Compressed.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sep23_Compressed.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Dec23_Compressed.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 Signed_compressed.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 June 23_Compressed.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 Sep 23_compressed.pdf16 Jan 2024
Certificates of CA (Form 3)File: Form 3 Dec 23_Compressed.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 2223.PDF15 Dec 2023
Layout approvalFile: LAYOUT PLAN FINAL.pdf22 Feb 2023
Building plan approvalFile: BUILDING PLANS-1-3.pdf22 Feb 2023
Building plan approvalFile: BUILDING PLANS-4.pdf22 Feb 2023
Building plan approvalFile: BUILDING PLANS-5 AND 6.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN FINAL.pdf22 Feb 2023
Building Plan Approval (IOD)File: BUILDING PLANS-1-3.pdf22 Feb 2023
Building Plan Approval (IOD)File: BUILDING PLANS-4.pdf22 Feb 2023
Building Plan Approval (IOD)File: BUILDING PLANS-5 AND 6.pdf22 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC RADHA KRISHNA.pdf22 Feb 2023
Proforma of Agreement for saleFile: Draft Agreement.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2122.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 RADHA KRISHNA 2020.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RADHA KRISHNA 2021.pdf11 Feb 2023
Certificates of CA (Form 3)File: uPDATED FORM 3.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr 2.pdf31 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr 3.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr 2.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr 3.pdf31 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold AND Unsold Qtr 3.pdf31 Jan 2023
Certificates of CA (Form 3)File: Sep22 Form 3.pdf31 Jan 2023

How this compares with Palghar

63%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RADHA KRISHNA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TEMBHODE3,200+ in Palghar

2 kmRADHA KRISHNA RESIDENCYCompleted 114Lapsed / revoked 50Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: RADHA KRISHNA REALTY

RADHA KRISHNA REALTY has 2 registrations on MahaRERA, including RADHA KRISHNA RESIDENCY and SHREE SALASAR ROW VILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if RADHA KRISHNA RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RADHA KRISHNA RESIDENCY?

The registered promoter entity is RADHA KRISHNA REALTY, a partnership as per the filing. Its GSTIN 27AAYFR8167K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RADHA KRISHNA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RADHA KRISHNA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RADHA KRISHNA RESIDENCY?

The professionals named in the filing: Architect: SANJAY MALOO; Engineer: VISHNU JADHAV OF SUPREME ENGINEERING; Engineer: CENTRE LINE CONSULTANTS & ENGINEERS; Chartered Accountant: VIPUL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RADHA KRISHNA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RADHA KRISHNA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RADHA KRISHNA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.