Home / Browse projects / Palghar, Maharashtra / RADHA KRISHNA RESIDENCY
RADHA KRISHNA RESIDENCY
RG-MH-03101 · RERA P99000020418 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RADHA KRISHNA RESIDENCY is a Residential / Group Housing project by RADHA KRISHNA REALTY in Palghar, Maharashtra, registered with MahaRERA as P99000020418 on 9 Apr 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 79 of the 126 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameRADHA KRISHNA RESIDENCY
- TypeResidential / Group Housing
- Location
- MAHIM ROAD
- TEMBHODE
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000020418
- ReraGenie IDRG-MH-03101
Builder
- NameRADHA KRISHNA REALTY
- Entity typePartnership
- GSTIN27AAYFR8167K1Z2
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersRAMASHANKAR K YADAV, RAMSAKAL YADAV, SHIVDEV SHUKLA, DIPESH S MISHRA, SHYAMSUNDER PANDHARI YADAV
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Apr 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed134 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B NO 1 WING A B | NA | 6 | 6 | 54 | 0 | 54 |
| B NO 3 WING A B | NA | 6 | 6 | 72 | 0 | 72 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 92%.
B NO 1 WING A B69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 92% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 47% |
B NO 3 WING A B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 45% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHASHIKANT R PATIL | Palghar | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B NO 1 WING A B | NA | Rs 7.64 cr | Rs 6.19 cr |
| B NO 3 WING A B | NA | Rs 3.43 cr | Rs 3.43 cr |
| - | NA | Rs 70.00 lakh | Rs 42.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY MALOO |
| Engineer | VISHNU JADHAV OF SUPREME ENGINEERING |
| Engineer | CENTRE LINE CONSULTANTS & ENGINEERS |
| Chartered Accountant | VIPUL JAIN |
| Partner | Role in project |
|---|---|
| RADHA KRISHNA REALTY | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDELAY DUE TO AMENDMENT IN PLAN, PLANNING DELAYS AND COVID 19 PANDEMIC
Reason as filed by the promoterWe had applied for change in plans, accordingly revised Commencement Certificate was issued on 20.05.2022 and layout plans was approved on 21.06.2022 by Palghar Municipal Corporation. Kindly note that floors were increased during this revision, however, revised Development Agreement could not be signed with landowner due to negotiation and it could be finally signed on 09.02.2023. This has caused delay in completion of originally estimated completion date. We are attaching copy of revised plans and DA for your kind perusal. Kindly note that we had already completed Bldg 3 and given possessions
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Aug 2024
Documents filed134
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 qtr 4 RKR.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 QTR 4 RKR.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 26.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: FORM 1 QTR 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 QTR 3 .pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 QTR 3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Qtr 2 compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 QTR 3 compressed.pdf | 20 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 4 2425.pdf | 16 May 2025 |
| Certificates of CA (Form 3)File: FORM 3 QTR 4 2425.pdf | 16 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QTR 4 2425.pdf | 16 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 4 2425.pdf | 16 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC-24.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3 DEC-24.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC-24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DEC-24.pdf | 18 Jan 2025 |
| CERSAI detailsFile: CERSAI.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Jun23_compressed.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sep 23_compressed.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 24.pdf | 28 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 24_compressed.pdf | 28 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 SEP 24_compressed.pdf | 28 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP 24.pdf | 28 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2324_compressed.pdf | 28 Dec 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration Notarized.pdf | 19 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf | 19 Nov 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration Notarized.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Nov 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 19 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INT.pdf | 19 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf | 19 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC RADHA KRISHNA.PDF | 5 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Compressed.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Compressed.pdf | 27 Jul 2024 |
| Certificates of CA (Form 3)File: FORM 3 Compressed.pdf | 27 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2122 WITH SIGN.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A MAR 23.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 2A MAR 23.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Jun23_compressed.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sep 23_compressed.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Dec 23_compressed.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032023 cOMPRESSED.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Jun23_Compressed.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Sep23_compressed.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Dec23_compressed.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QTR 4 202223_COMPRESSED.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Jun23_Compressed.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sep23_Compressed.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Dec23_Compressed.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Signed_compressed.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 June 23_Compressed.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Sep 23_compressed.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Dec 23_Compressed.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA FORM 5 2223.PDF | 15 Dec 2023 |
| Layout approvalFile: LAYOUT PLAN FINAL.pdf | 22 Feb 2023 |
| Building plan approvalFile: BUILDING PLANS-1-3.pdf | 22 Feb 2023 |
| Building plan approvalFile: BUILDING PLANS-4.pdf | 22 Feb 2023 |
| Building plan approvalFile: BUILDING PLANS-5 AND 6.pdf | 22 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN FINAL.pdf | 22 Feb 2023 |
| Building Plan Approval (IOD)File: BUILDING PLANS-1-3.pdf | 22 Feb 2023 |
| Building Plan Approval (IOD)File: BUILDING PLANS-4.pdf | 22 Feb 2023 |
| Building Plan Approval (IOD)File: BUILDING PLANS-5 AND 6.pdf | 22 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC RADHA KRISHNA.pdf | 22 Feb 2023 |
| Proforma of Agreement for saleFile: Draft Agreement.pdf | 22 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2122.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 RADHA KRISHNA 2020.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RADHA KRISHNA 2021.pdf | 11 Feb 2023 |
| Certificates of CA (Form 3)File: uPDATED FORM 3.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr 2.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr 3.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr 2.pdf | 31 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr 3.pdf | 31 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold AND Unsold Qtr 3.pdf | 31 Jan 2023 |
| Certificates of CA (Form 3)File: Sep22 Form 3.pdf | 31 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 134 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RADHA KRISHNA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TEMBHODE3,200+ in Palghar
Filed coordinates, straight-line distance. 282 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: RADHA KRISHNA REALTY
RADHA KRISHNA REALTY has 2 registrations on MahaRERA, including RADHA KRISHNA RESIDENCY and SHREE SALASAR ROW VILLAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if RADHA KRISHNA RESIDENCY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RADHA KRISHNA RESIDENCY?
The registered promoter entity is RADHA KRISHNA REALTY, a partnership as per the filing. Its GSTIN 27AAYFR8167K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RADHA KRISHNA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RADHA KRISHNA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RADHA KRISHNA RESIDENCY?
The professionals named in the filing: Architect: SANJAY MALOO; Engineer: VISHNU JADHAV OF SUPREME ENGINEERING; Engineer: CENTRE LINE CONSULTANTS & ENGINEERS; Chartered Accountant: VIPUL JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RADHA KRISHNA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback