Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rachana Business Bay Commercial 2 is a Commercial project by RACHANA LIFESPACES in Pune, Maharashtra, registered with MahaRERA as P52100050723 on 28 Apr 2023. Possession is promised by 31 Dec 2027. 17 of the 136 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameRachana Business Bay Commercial 2
- TypeCommercial
- Location
- Sus
- Mulshi
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050723
- ReraGenie IDRG-MH-92530
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed145 files
Current status
Figures as on 27 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RACHANA BUSINESS BAY / COMMERCIAL-2 | NA | 24 | 20 | 0 | 136 | 136 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
RACHANA BUSINESS BAY / COMMERCIAL-2: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 25% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed954
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ARCHANA SOMNATH DHANKUDE | Baner | Pune |
| DEEPAK SITARAM SASAR | Pashan | Pune |
| GANESH HANUMANT SUTAR | Sus | Pune |
| SMITA DEEPAK SASAR | Pashan | Pune |
| SUNANDA BHASKAR THUBE | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RACHANA BUSINESS BAY / COMMERCIAL-2 | NA | Rs 68.98 cr | Rs 56.63 cr |
| - | NA | Rs 4.26 cr | Rs 2.13 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vikas Achalkar & Associates |
| Architect | Vikas Arunkumar Achalkar |
| Engineer | JW Consultants LLP |
| Engineer | Dhananjay Kisanrao Patil |
| Engineer | PRAFUL SHRIGIRIWAR |
| Chartered Accountant | D V Joshi |
| Chartered Accountant | SPAK & Co |
| Chartered Accountant | Bogati & Company |
| Partner | Role in project |
|---|---|
| RACHANA LIFESPACES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed145
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2 A Tower Commercial 2.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Tower C2 Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Tower C2 Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Tower C2 Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form1 Commercial 2 Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Comm 2 Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Tower C2 Q3 FY 202526.pdf | 20 Jan 2026 |
| Layout approvalFile: IOD Plan 2025.pdf | 17 Oct 2025 |
| Layout approvalFile: IOD Plan 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Tower Comm 2 Q2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Comm 2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Q2 202526 Tower C2.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Tower C2 FY 2024-25.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Rachana Business Bay Comm2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rachana Business Bay Comm2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Comm2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Comm2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 tower C2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 tower C2.pdf | 24 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Rachana Business Bay Comm2.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Comm2.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 tower C2.pdf | 23 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rachana Business Bay Commercial 2.pdf | 22 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rachana Business Bay Commercial 2.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Business Bay Commerical - 2.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: RBB COMMECIAL 2001.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Commerical 2 QA.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 (2).pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 Comm-2 Tower.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Commercial 2.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: RBB COMMECIAL-2.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAC commercial 2.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Commercial -2 (Form 1).pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Com II Sold and Unsold Inventory.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)-30 01 2023.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1)-30 09 2023.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)-05 01 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)-02 04 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)-01 07 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)-30 08 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)-03 07 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)-01 10 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1)-30 09 2023.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)-01 10 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)-03 07 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)-30 08 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)-01 07 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)-02 04 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)-05 01 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)-30 01 2023.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RLS (Form - 3).pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 30 6 23.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 30 09 24.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BUSINESS BAY.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Comm-2 From5.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BUSINESS BAY001.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Comm-2 30 08 2024.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA cert Commercial 2.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Comm-2 From5.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 BC commercial 2.pdf | 8 Oct 2024 |
| Copy of the legal title reportFile: 01_Commercial II Title Report.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower Com 2_ RERA_Legal and Litigation Encumbrance.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Bella Casa_ Tower Com 2_ RERA_Finance Encumbrance.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Bella Casa_ Tower Com 2_ RERA_Legal and Litigation Encumbrance.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Bella Casa_ Tower Com 2_ RERA_Finance Encumbrance.pdf | 22 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 22 Jul 2024 |
| Declaration about Commencement CertificateFile: Bella Casa_ Tower Com 2_ RERA_Declaration about commencement-RLS.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Comm 2).pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA - Commercial 2.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bella Casa_ Tower Com 2_ RERA_Form 3- Accounts-RLS.pdf | 22 Jul 2024 |
| Proforma of Agreement for saleFile: 01_Final Draft-Agreement 1 Com II.pdf | 22 Jul 2024 |
| Proforma of Allotment letterFile: 04_Allotment Letter- Final- Com 2 Building.pdf | 22 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: Bella Casa_ Tower Com2_ RERA_Deviation of Allotment Letter-RLS.pdf | 22 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: Bella Casa_ Tower Com 2_ RERA_Deviation for AFS.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Comm-2.pdf | 14 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Comm-2.pdf | 14 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Commercial Tower 2 Business Bay.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Business Bay Commercial 2.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 Comm-2_compressed.pdf | 24 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Bella Casa PH-II | Sus | 296 | Completed | Dec 2020 | Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 145 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rachana Business Bay Commercial 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sus13,700+ in Pune
Filed coordinates, straight-line distance. 213 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: RACHANA LIFESPACES
Rachana Lifespaces has 4 registrations on MahaRERA, including Bellacasa and BELLACASA ROYALE TOWER / TYPE 'A'. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Rachana Business Bay Commercial 2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rachana Business Bay Commercial 2?
The registered promoter entity is RACHANA LIFESPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rachana Business Bay Commercial 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Rachana Business Bay Commercial 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rachana Business Bay Commercial 2?
The professionals named in the filing: Architect: Vikas Achalkar & Associates; Architect: Vikas Arunkumar Achalkar; Engineer: JW Consultants LLP; Engineer: Dhananjay Kisanrao Patil; Engineer: PRAFUL SHRIGIRIWAR; Chartered Accountant: D V Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rachana Business Bay Commercial 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback