Registered No litigation declared Residential / Group Housing project

QUEENS PARK

By V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED

RG-MH-51524 · RERA P51800047377 · Last updated on MahaRERA portal: 25 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
16 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
61 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

QUEENS PARK is a Residential / Group Housing project by V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047377 on 27 Oct 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 10 months from the original filing. 99 of the 160 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameQUEENS PARK
  • TypeResidential / Group Housing
  • Location
    • SUBHASH NAGAR
    • CHEMBUR EAST
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047377
  • ReraGenie IDRG-MH-51524

Builder

  • NameV LAXMI ESTATE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAICV1396H1ZY
  • DirectorsADITYA RAMDAS SANGLE, RAMDAS MARUTI SANGLE, ANITA RAMDAS SANGLE, HARSHADA RAMDAS SANGLE
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2022First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed135 files

Current status

62%99 of 160 units booked
107.0%Work done, per cost certificate

Figures as on 25 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA171761970
WING BNA1616761490

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

WING A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered96
BuildingClosed/CoveredTotal
WING A4545
WING B5151

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,473 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2026
LandownerVillageDistrict
CHEMBUR PITRUCHHAYA CHS LTDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySPA MHADA
Permissible FSI10815.38
Proposed, not sanctioned10,215 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIKHROLI WEST
Estimated costRs 47.98 cr
Cost incurredRs 51.35 cr
Work done107.01%
BuildingWingEstimatedIncurred
WING ANARs 23.99 crRs 25.67 cr
WING BNARs 23.99 crRs 25.67 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKISHORE R LOTLIKAR
EngineerJC CONSULTANTS
EngineerPankaj R Sawant
Chartered AccountantKAPURE AND KAPURE
Chartered AccountantV.C. Shah & Co.
PartnerRole in project
V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21082622305Dec 2025 → Oct 2026

Reason as filed by the promoter1. The project was registered with the Maharashtra Real Estate Regulatory Authority in October 2022, with an estimated completion timeline up to 31/12/2025. 2. We hereby seek an extension of the project timeline up to 31.10.2026 under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. 3. The construction of the project has been completed, and the Occupancy Certificate has been obtained as of 30.04.2026. Possession has also been handed over to allottees. 4. All requisite NOCs have been duly submitted by the Promoter, and there are no pending compliances on the part of the P

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Queens Park Bldg no 10 Mar 2026.pdf25 Sep 2026
Withdrawal Update Form 1File: Form 1 Queens Park Bldg no 10 Mar 2026.pdf25 Sep 2026
Withdrawal Update Form 1File: 16 BLDG NO - 10 RE.pdf25 Sep 2026
Withdrawal Update Form 2File: Form 2 Queens Park Bldg no 10 Mar 2026 Q4.pdf25 Sep 2026
Withdrawal Update Form 2File: Form 2 Queens Park Bldg no 10 Mar 2026 Q4.pdf25 Sep 2026
Withdrawal Update Form 2File: Estate Form-2.pdf25 Sep 2026
Withdrawal Update Form 3File: Form 3 - Queens Par.pdf25 Sep 2026
Withdrawal Update Form 3File: Form 3 - Quee.pdf25 Sep 2026
Withdrawal Update Form 3File: Form 3 - Queens Par.pdf25 Sep 2026
Withdrawal Update Form 1File: 16 BLDG NO - 10 RE.pdf24 Sep 2026
Withdrawal Update Form 1File: 16 BLDG NO - 10 RE.pdf24 Sep 2026
Withdrawal Update Form 1File: 16 BLDG NO - 10 RE.pdf24 Sep 2026
Withdrawal Update Form 2File: Estate Form-2.pdf24 Sep 2026
Withdrawal Update Form 2File: Estate Form-2.pdf24 Sep 2026
Withdrawal Update Form 2File: Estate Form-2.pdf24 Sep 2026
Withdrawal Update Form 3File: Form 3 - Queens Par.pdf24 Sep 2026
Withdrawal Update Form 3File: Form 3 - Queens Par.pdf24 Sep 2026
Withdrawal Update Form 3File: Form 3 - Queens Par.pdf24 Sep 2026
Form 2A (FY 2025-2026)File: MahaRera New Format of Form 2A - 2025 to 2026 Queens Park.pdf18 Aug 2026
Form 2A (FY 2022-2023)File: MahaRera New Format of Form 2A - 2022 to 2023 Queens Park (1).pdf17 Aug 2026
Form 2A (FY 2023-2024)File: MahaRera New Format of Form 2A - 2023 to 2024 Queens Park (1).pdf17 Aug 2026
Form 2A (FY 2024-2025)File: MahaRera New Format of Form 2A - 2024 to 2025 Queens Park (1).pdf17 Aug 2026
Form 5 (FY 2022-2023)File: Signed Form 5 - V Laxmi Estate D.pdf17 Aug 2026
Form 5 (FY 2023-2024)File: Signed Form 5 - V L.pdf17 Aug 2026
Form 5 (FY 2024-2025)File: Signed Form 5 - FY 24-25.pdf17 Aug 2026
Form 1File: Form 1 BLDG NO - 10 DATED - 31-12-2022.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Dec 2022 Q3.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 Dec 2022 Q3.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclouser December 2022.pdf14 Aug 2026
Form 1File: Form 1 BLDG NO - 10 DATED - 31-03-2023.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 March 2023 Q4.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 March 2023 Q4.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclouser March 2023.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 June 2023 Q1.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 June 2023 Q1.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 June23 Q1.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 J.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Sept 2023 Q2 (1).pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 Sept 2023 Q2.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold BLDG-10 Sept23 Q2.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 Sep 23 (1).pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 December2023.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Dec 2023 Q3.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 Dec 20023 Q3.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold BLDG-10 Dec23 Q3.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 Mar 24.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 March 2024 Q4.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 March 2024 Q4.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 March24 Q4.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 June 2024.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 June 2024 Q1.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 June 2024 Q1.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 June 24 Q1.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 September 2024.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Sept 2024 Q2.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 Sept 2024 Q2.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 Sept 24 Q2.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 December 2024.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Dec 2024 Q3.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 Dec 2024 Q3.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 Dec24 Q3 (1).pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg No 10 Q4.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 March 2025 Q4..pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 March 2025 Q4.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Unsold Bldg-10 March25 Q4 (1).pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg no 10 June 2025 June 25.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 June 2025 Q1.pdf14 Aug 2026
Form 3File: Form 3 Queens Park Bldg no 10 June 2025 Q1.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure-June-2025.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg no 10 Sept 2025.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Sept 2025 Q2.pdf14 Aug 2026
Form 3File: Form 3 June 26_compressed.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure-Sept-2025.pdf14 Aug 2026
Form 1File: Form 1 Queens Park Bldg no 10 Dec 2025.pdf14 Aug 2026
Form 2File: Form 2 Queens Park Bldg no 10 Dec 2025 Q3.pdf14 Aug 2026
Form 3File: Form 3 Dec 25_c.pdf14 Aug 2026
Disclosure of Sold and Booked InventoryFile: Disclosure-Dec-2025.pdf14 Aug 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Queens Park Bldg No 10 Q1.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Queens Park Bldg No 10 Q2.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Queens Park Bldg No 10 Q3.pdf19 Jul 2025

How this compares with Mumbai Suburban

62%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 10 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep QUEENS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR EAST6,700+ in Mumbai Suburban

2 kmQUEENS PARKCompleted 57Lapsed / revoked 54Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 198 registered projects within 2 km.

Builder: V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED

V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including QUEENS PARK and Queens Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if QUEENS PARK is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of QUEENS PARK?

The registered promoter entity is V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAICV1396H1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in QUEENS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for QUEENS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at QUEENS PARK?

The professionals named in the filing: Architect: KISHORE R LOTLIKAR; Engineer: JC CONSULTANTS; Engineer: Pankaj R Sawant; Chartered Accountant: KAPURE AND KAPURE; Chartered Accountant: V.C. Shah & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in QUEENS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About QUEENS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save QUEENS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.