Home / Browse projects / Mumbai Suburban, Maharashtra / Queens Avenue

Registered No litigation declared Others project

Queens Avenue

By V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED

RG-MH-06956 · RERA P51800054458 · Last updated on MahaRERA portal: 18 Jul 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 30%
1Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Queens Avenue is a Others project by V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054458 on 25 Jan 2024. Possession is promised by 31 Dec 2027. 1 complaint is on record with the regulator.

At a glance

Project

  • NameQueens Avenue
  • TypeOthers
  • Location
    • SUBHASH NAGAR
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800054458
  • ReraGenie IDRG-MH-06956

Builder

  • NameV LAXMI ESTATE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsADITYA RAMDAS SANGLE, HARSHADA RAMDAS SANGLE, ANITA RAMDAS SANGLE
  • Managing DirectorRAMDAS MARUTI SANGLE
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Queens Avenue Wing ANA170000
Queens Avenue Wing BNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 30%.

Queens Avenue Wing A4%
ActivityProgress
Excavation30%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Queens Avenue Wing B4%
ActivityProgress
Excavation30%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90
BuildingClosed/CoveredTotal
Queens Avenue Wing A4545
Queens Avenue Wing B4545

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,452 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VRINDAVAN CHSLChemburMumbai Suburban

Approvals and building plan

Permissible FSI10500.0
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKannamwar Nagar 1 VIKHROLI East Mumbai 400083

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Rakshe
EngineerAjay Mahale
Chartered AccountantSumit Kapure
PartnerRole in project
V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502057Sharad Baliram JadhavV LAXMI ESTATE DEVELOPERS PRIVATE LIMITED24/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Queens Avenue - Mar'24.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June24.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep24.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec24.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 March 24.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 June 24.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 Sept 24.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 Dec 24.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: 11 March 25.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 02-04-2024.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 05-07-2024.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 03-10-2024.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 03-10-2024.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 01-01-2025.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Queens Avenue - Q4.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bldg No 11 Q1.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bldg No 11 Q2.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bldg No 11 Q3.pdf9 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Queens Avenue Form 2.pdf8 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Queens Avenue Form 2.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Queens Avenue - Mar'24.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June24.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep24.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec24.pdf17 Jun 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Self-Declaration.pdf9 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Self-Declaration.pdf9 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate.pdf8 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ajay Mahale Engineer's Certificate.pdf8 May 2024
Layout approvalFile: 1 - Ground Floor.PDF27 Apr 2024
Building plan approvalFile: 1 - Ground Floor.PDF27 Apr 2024
Building plan approvalFile: 2.PDF27 Apr 2024
Building plan approvalFile: 3.PDF27 Apr 2024
Building plan approvalFile: 4.PDF27 Apr 2024
Building plan approvalFile: 6.PDF27 Apr 2024
Building plan approvalFile: 7.PDF27 Apr 2024
Building plan approvalFile: 8.PDF27 Apr 2024
Copy of Layout Approval (in case of layout)File: 1 - Ground Floor.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 - Ground Floor.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.PDF27 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.PDF27 Apr 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrance.pdf11 Jan 2024
Details of encumbrances concerned to LegalFile: Declaration of No Encumbrance.pdf11 Jan 2024
CERSAI detailsFile: Declaration for Cersai.pdf11 Jan 2024
Proforma of Agreement for saleFile: Agreement for Sale Building no 11 Final.pdf11 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abount Bank Statement.pdf11 Jan 2024
Other - LegalFile: 1 other Legal.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Queens Avenue 10th Jan.pdf10 Jan 2024
Other - LegalFile: Bldg No 11.pdf27 Dec 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf9 Dec 2023
Layout approvalFile: ZERO FSI IOA Queens Avenue.pdf8 Dec 2023
Building plan approvalFile: ZERO FSI IOA Queens Avenue.pdf8 Dec 2023
Copy of Layout Approval (in case of layout)File: ZERO FSI IOA Queens Avenue.pdf8 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: ZERO FSI IOA Queens Avenue.pdf8 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 11 Subhash Nagar PCC (1).pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf8 Dec 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter Deviation.pdf8 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Devation Report1-10.pdf8 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Devation Report11-19.pdf8 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Int_Estate_11_Aditya Sangle.pdf24 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Int_Estate_11_Anita Sangle.pdf24 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Int_Estate_11_Harshada Sangle.pdf24 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Int_Estate_11_Ramdas M Sangle.pdf24 Nov 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal 26th October 2023.pdf11 Nov 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal 26th October 2023.pdf11 Nov 2023
Declaration in FORM BFile: FormB Developer.pdf11 Nov 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER Queens Avenue.pdf11 Nov 2023
PAN CardFile: Pan Card.pdf26 Oct 2023
Copy of the legal title reportFile: Title Certificate.pdf26 Oct 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Queens Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED

V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including QUEENS PARK and Queens Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Queens Avenue is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Queens Avenue?

The registered promoter entity is V LAXMI ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Queens Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Queens Avenue?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Queens Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Queens Avenue?

The professionals named in the filing: Architect: Sachin Rakshe; Engineer: Ajay Mahale; Chartered Accountant: Sumit Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Queens Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Queens Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Queens Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.