Purva Silversand
RG-MH-12266 · RERA P52100007566 · Last updated on MahaRERA portal: 10 Jun 2025
Source: official MahaRERA filing
Red flags
- 123 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Purva Silversand is a Others project by Pune Projects LLP in Pune, Maharashtra, registered with MahaRERA as P52100007566 on 17 Aug 2017. The registration is recorded completed; possession was promised by 28 Nov 2023. The completion date has moved by 12 months from the original filing. 123 complaints are on record with the regulator.
At a glance
Project
- NamePurva Silversand
- TypeOthers
- Location
- Keshav Nagar Road
- Keshavnagar
- Mundhawa
- Haveli
- Pune
- 411036
- Pincode411036
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007566
- ReraGenie IDRG-MH-12266
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion28 Nov 2023
- Revised completionRevised to 28 Nov 2023 (originally 28 Nov 2022)
- Buildings6 building records
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Phase 1 Building 4 | NA | 24 | 0 | 0 | 0 | 0 |
| Phase 1 Building 5 | NA | 24 | 0 | 0 | 0 | 0 |
| Phase 1 Building 6 | NA | 24 | 0 | 0 | 0 | 0 |
| Phase 1 Building 7 | NA | 24 | 0 | 0 | 0 | 0 |
| Phase 1 Building 8 | NA | 22 | 0 | 0 | 0 | 0 |
| Phase 1 Building 9 | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 10 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
66 of 66 construction stages are filed complete across 6 buildings.
Phase 1 Building 4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Phase 1 Building 5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Phase 1 Building 6100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Phase 1 Building 7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Phase 1 Building 8100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Phase 1 Building 9100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities24
As on 10 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Access to commercial shopping areas proposed in subsequent phases of entire Silversands project | No | Not applicable |
| Designated space for beach volleyball court and half basketball post and cricket practice pitch | Yes | 0% |
| Designated space for jogging and walking track | Yes | 0% |
| Designated space for outdoor yoga and meditation deck and multi play courts | Yes | 0% |
| Designated space for senior citizens and hopskotch | Yes | 0% |
| Parking Level Podiums | Yes | 0% |
| Single hole putting golf green with astro turf | No | Not applicable |
| Swimming pool with demarcated kids pool and provision for snorkelling | Yes | 0% |
| Wave pool and designated space for koi fish pond and wet pool bar | Yes | 0% |
Parking filed2019
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Phase 1 Building 4 | 484 | 484 |
| Phase 1 Building 5 | 477 | 477 |
| Phase 1 Building 6 | 278 | 278 |
| Phase 1 Building 7 | 209 | 209 |
| Phase 1 Building 8 | 213 | 213 |
| Phase 1 Building 9 | 358 | 358 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Oxford Shelters Private Limited | Pune (M Corp.) | Pune |
| Hritik Technologies & Realty Private Limited | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rana Ram |
| Architect | Abhijit Konde |
| Architect | Master Plan Landscape Architects |
| Engineer | JW Consultants LLp |
| Partner | Role in project |
|---|---|
| Pune Projects LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe state that the registration validity of the said project is due to expire on November 28, 2022. We further state that due to certain mitigating circumstances, the balance project development work of the said project is still pending. We therefore, pray that the project registration validity be extended upto November 28, 2023 under the provisions of section 6 of the Real Estate (Regulation and Development) Act, 2016.
Litigation declared6
| Case | Court | Status |
|---|---|---|
| SP C S 2033/2011 | High Court Civil | Civil revision application is pending as on date |
| 1670/2013 | Civil Court | Hearing on application for temporary injunction is pending and further proceedings accordingly |
| 1268/2016 | Civil Court | Matter is kept for argument on exhibit five of the suit petition |
| 216/2009 | Civil Court | Matter is now pending for filing of additional written statements by the defendants and for further |
| 332,380,679/2016 | High Court | The matter is now pending for arguments after cancellation of order passed by previous court |
| 1263/2006 | Civil Court | Application for filing written statement has been allowed and necessary directions have been issued |
Complaints filed with MahaRERA123
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000000183 | Mariam Broachwala | Srabani Mitra | 08/09/2017 |
| CC005000000010546 | Amit Agrawal | Vijay Bharadwaj | 14/11/2017 |
| CC005000000022515 | Harsha Vikas Joshi | PUNE PROJECT LLP | 16/04/2019 |
| CC005000000022724 | Pradeep Kumar Singh | Pune Project LLP | 01/03/2019 |
| CC005000000085476 | Pune Projects LLP | Rachna Sameer Mohite | 17/05/2021 |
| CC005000000106555 | Pune Project LLP | Gulshan Pal | 02/02/2022 |
| CC005000000106562 | Pune Project LLP | Neelam S Pal | 02/02/2022 |
| CC005000000106565 | Pune Project LLP | Sunita Ashok | 02/02/2022 |
| CC005000000106570 | Pune Project LLP | Ujwala Sameer Jadhav | 02/02/2022 |
| CC005000000095771 | RANA ANAND RANJAN | purvankara silversand | 22/07/2021 |
| CC005000000259080 | Ankur Chimanlal Kothari | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 02/07/2023 |
| CC005000000116879 | Kunal Jayantilal Patadiya | Pune Projects LLP | 22/07/2022 |
| CC005000000116932 | MS JYOTI SHYAM MANSUKHANI | PINNI 3 CO OPE HSG SOCIETY LTD | 12/04/2022 |
| CC005000000157266 | Banibandana Nayak | PINNI 3 CO-OPE HAG SOCIETY LTD | 01/07/2022 |
| CC005000000157322 | Alok Kumar Garg | PINNI 3 CO OPERATIVE HSG SOCIETY LTD | 13/07/2022 |
| CC005000000167355 | SUJITH NAIR | PINNI 3 CO-OPERATIVE HSG SOCIETY LTD | 18/07/2022 |
| CC005000000259019 | Hemant Thard | Purva Silversand | 15/06/2023 |
| CC005000000177807 | DAMODARAN SASIDHARAN | PINNI 3 CO OPERATIVE HOUSING SOCIETY LTD | 15/11/2022 |
| CC005000000269474 | DAMODARAN SASIDHARAN | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 21/09/2023 |
| CC005000000177816 | NAGICHETTY PRASAD | PINNI 3 CO OPERATIVE HSG SOCIETY LTD | 21/11/2022 |
| CC005000000177844 | AMIT LINGARCHANI | PINNI 3 CO OPERATIVE HOUSING SOCIETY LTD | 28/11/2022 |
| CC005000000177846 | RAVI AGRAWAL | PINNI 3 CO OPERATIVE HOUSING SOCIETY LTD | 29/11/2022 |
| CC005000000269497 | RAVI AGRAWAL | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 27/09/2023 |
| CC005000000177866 | D VARADHARAJAN | PINNI 3 CO OPERATIVE HOUSING SOCIETY | 30/11/2022 |
| CC005000000177875 | RAHUL SHARMA | PINNI 3 CO OPERATIVE HOUSING SOCIETY | 30/11/2022 |
| CC005000000177860 | Sandeep Raina | PINNI 3 CO OPERATIVE HOUSING SOCIETY | 30/11/2022 |
| CC005000000177876 | NISHA TALREJA | PINNI 3 CO COPERAVIE HOUSING SOCIETY | 06/12/2022 |
| CC005000000177879 | SUMANTO CHOUDHARY | PINNI 3 CO OPERATIVE HOUSING SOCIETY | 30/11/2022 |
| CC005000000177883 | Prerna Sirohi | Purva Silversand | 01/12/2022 |
| CC005000000177913 | Rakhi Sarvahi | PINNI 3 CO-OPERATIVE HOUSING SOCIETY LTD | 10/12/2022 |
| CC005000000177966 | Prakash Murarilal Sharma | PINNI 3 Co-operative Housing Society Ltd. | 22/12/2022 |
| CC005000000177956 | Trupti Vimlakar Deshpande | PINNI 3 Co-operative Housing Society Ltd. | 25/12/2022 |
| CC005000000177957 | Shrihari Anil Anikhindi | PINNI 3 Co-operative Housing Society Ltd. | 25/12/2022 |
| CC005000000198034 | Khadija Challawala | PINNI 3 Co-operative Hsg. Society Ltd. | 09/01/2023 |
| CC005000000198043 | Swarup Chakraborty | Ashish Puravankara | 04/01/2023 |
| CC005000000198065 | Pradip Haribhau Dhanawade | PINNI 3 co-operative Hsg. Society Ltd. | 10/01/2023 |
| CC005000000198134 | Anita Suresh Sarda | PINNI 3 Co-operative Hsg. Society Ltd | 18/01/2023 |
| CC005000000198139 | Ritu Vishwakarma | PINNI 3 Co-operative Housing Society Ltd. | 25/01/2023 |
| CC005000000198193 | Tushar Babanrao Chavan | Pinni 3 Co-operative housing Society Ltd. | 18/02/2023 |
| CC005000000208258 | Venkata Naga Krishna Tejas Peruri | PINNI 3 Co-operative Housing Society | 08/02/2023 |
| CC005000000228332 | Vinayak Mishra | PINNI 3 Co-operative housing society ltd. | 16/02/2023 |
| CC005000000259275 | Rakesh kumar | Pune Projects LLP | 21/08/2023 |
| CC005000000238657 | ASIF SHAIKH | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 08/04/2023 |
| CC005000000238502 | DEEPAK SOFAT | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 21/03/2023 |
| CC005000000238541 | PRASHANT MISAL | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 25/03/2023 |
| CC005000000238665 | AAKASH ATMARAM SATHAWANE | PUNE PROJECTS LLP | 20/04/2023 |
| CC005000000238779 | RAJESH KUMAR PANDEY | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 31/07/2023 |
| CC005000000248793 | RAVINDRA BHASKAR SHELAR | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 30/04/2023 |
| CC005000000238770 | Vivek Kumar Srivastava | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 26/04/2023 |
| CC005000000238771 | VINEET KUMAR | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 26/04/2023 |
| CC005000000248790 | RENU DHAMI | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 28/04/2023 |
| CC005000000258915 | Hussain Parpia | Pune Projects LLP | 07/06/2023 |
| CC005000000259006 | PRAJWAL MUKKAWAR | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 14/06/2023 |
| CC005000000259007 | Rakesh Kawale | Pune Projects LLP | 14/06/2023 |
| CC005000000259022 | AKHIL MURLIDHAR PANPALIYA | PINNI 3 Co-operative Hsg. Society Ltd | 15/06/2023 |
| CC005000000259034 | Chandrakant Ramnivas Kasat | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 20/06/2023 |
| CC005000000259039 | PRIYANKA AMOL GAIKWAD | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 20/06/2023 |
| CC005000000259053 | Shirish Manshani | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 23/06/2023 |
| CC005000000259072 | ROHIT GUPTA | PINNI 3 CO-OPERATIVE HOUSING SOCIETY LIMITED | 01/07/2023 |
| CC005000000259085 | ANKIT CHAUDHARY | PINNI 3 CO OPERATIVE HSG SOCIETY LTD. | 30/06/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Jan 2024
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: SS OC.pdf | 10 Jun 2025 |
| Occupational CertificateFile: Silversands Completion Certificate.pdf | 10 Jun 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Silversands Completion Certificate.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SilverSand-1_Form-5_FY22-23.pdf | 4 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SS OC.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PURVA_SILVERSAND_1_compressed.pdf | 31 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase- 30-Jun-23.pdf | 31 Aug 2023 |
| Certificates of CA (Form 3)File: PURVA_SILVERSAND_1_compressed.pdf | 31 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase-31-03-2023.pdf | 23 May 2023 |
| Certificates of CA (Form 3)File: Purva Silversend 1Form 3.pdf | 23 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113122149_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113122125_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121321_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121412_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121513_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121638_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121725_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113121808_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113122024_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113122102_0001.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 230113122125_0001.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5- Silversand FY 2017-18.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5- Silversand FY 2018-19.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5- Silversand FY 2019-20.pdf | 13 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 01 2018 - Architect certificate Silversand 1.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silver sands Architect certificate Q2.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate -Silversand QTR 3.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silversand Architect certificate Qtr 4.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate - Silversand ph 1 QTR 1.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silversand Architect certificate Qtr 2_compressed.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Progress certificate Silversand-Qrtr 3.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate Silversand Ph1 2020.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate Silversand Ph 1 Q2.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect Certificate Silversand Phase 1.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Silversand RERA Progress certificate Q4 2020 PH 1.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 RERA Architect Certificate Phase 1.pdf | 9 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 RERA Architect Certificate Phase 1.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1-Jun19.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand-1 Dec19.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1 Mar20.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1-Jun20.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1 Sep20.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: PURA SILVERSAND PHASE I Dec17.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1 Dec20.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Silversand 1 2018 CA.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Sliversand 1 Mar 2018.pdf | 9 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Purva Silversand 1 Q2_compressed.pdf | 9 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 (RERA) - Architect Certificate Phase 1 and 1A _B1 to B9 -Phase-30-Sep-22.pdf | 21 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 Sept Q2 2022.pdf | 21 Nov 2022 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 13 Oct 2022 |
| CERSAI detailsFile: CERSAI Report.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q1 2021-22.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q2 2021-22_compressed-1.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q2 2021-22_compressed-2.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q3 2021-22_compressed-1.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q3 2021-22_compressed-2.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q4 2021 - 22.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Q1 2022.pdf | 13 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- Silversand I FY 2021-22.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Certificate 2020.pdf | 20 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Certificate 2021.pdf | 20 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5- Silversand I FY 2021-22.pdf | 20 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Silversand Structural Stability certificate.pdf | 8 Sep 2022 |
| Details of encumbrancesFile: Index of charges_Pune Projects ABFL.pdf | 29 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate Q3 - Silversand.pdf | 14 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate Silversand Q4 2021 .pdf | 14 Jul 2022 |
| Certificates of CA (Form 3)File: Purva_Silversand_1.pdf | 14 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Progress certificate Silversand Q4 2021 .pdf | 15 Jun 2022 |
| Details of encumbrancesFile: PPLLP Charge Regn.pdf | 20 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 28 May 2018 |
| Layout approvalFile: Approved Master Plan.pdf | 27 Jul 2017 |
| Building plan approvalFile: Commencement certificate.pdf | 27 Jul 2017 |
| PAN CardFile: PAN.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: Silversands (RERA) - Litigation.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Approved Master Plan.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Commencement certificate.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Form - B Pune Projects LLP.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architects Certificate.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 (Engineers Certificate).pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
Keep Purva Silversand on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Keshavnagar13,700+ in Pune
Filed coordinates, straight-line distance. 172 registered projects within 2 km.
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Builder: Pune Projects LLP
Pune Projects LLP has 11 registrations on MahaRERA, including Purva Silversand and Purva Silversands Phase 2. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Purva Silversand is delayed beyond 28 Nov 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Purva Silversand?
The registered promoter entity is Pune Projects LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Purva Silversand?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Purva Silversand?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Purva Silversand?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Purva Silversand?
The professionals named in the filing: Architect: Rana Ram; Architect: Abhijit Konde; Architect: Master Plan Landscape Architects; Engineer: JW Consultants LLp. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Purva Silversand?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback