Home / Browse projects / Thane, Maharashtra / Pristine Tower

Registration lapsed No litigation declared Others project

Pristine Tower

By Ideal Developers

RG-MH-65830 · RERA P51700008383 · Last updated on MahaRERA portal: 26 Feb 2020

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 67 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2021Possession promised67 months past this date
7 of 11Construction stages donefurthest along: Installation of Lifts, 95%
1Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

Pristine Tower is a Others project by Ideal Developers in Thane, Maharashtra, registered with MahaRERA as P51700008383 on 18 Aug 2017. Possession was promised by 30 Mar 2021 and is now 67 months past that date. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePristine Tower
  • TypeOthers
  • Location
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008383
  • ReraGenie IDRG-MH-65830

Builder

  • NameIdeal Developers
  • Entity typePartnership
  • PartnersChandrajit Shyamlal Yadav, Ramdrsh Ramdhari Yadav
  • Other registrations4 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

67 months past promisethis monthRegisteredAug 2017First promiseMar 2018Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Mar 2021
  • Revised completionRevised to 30 Mar 2021 (originally 31 Mar 2018)
  • Buildings1 building record
  • Documents filed20 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Pristine TowerNA370000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Feb 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Pristine Tower: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 26 Feb 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
CCTV CamersYes100%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered18
Open Space39

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,270 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3257.05
Proposed, not sanctioned3,257 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaxmi Industrial Complex Vartak Nagar Naka Thane W 400 606

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Jagwani
PartnerRole in project
Ideal Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700005824Mar 2018 → Sep 2020

Reason as filed by the promoterAs per the details mentioned at the time of registration of the project at the Maharera Website we have mentioned 31.03.2018 as the project completion date. However, we have completed the construction work but we got delayed in obtaining the Occupancy Certificate from TMC. As a result, we had applied for an extension of 6 months and the same had been granted on 10.04.2018 for a validity period up to 30.09.2018. We had applied for Occupancy Certificate on 12.01.2019 and the same is awaited since then. Meanwhile we had offered for fit-out possession to the allottees and the allottees are residin

EXT51700000205Mar 2018 → Sep 2020

Reason as filed by the promoterThe construction is completed. Also, we have attained most of the required NOC's. There was a 40 metre road sanctioned on our plot, which was supposed to be transferred to TMC on 7/12 extract. But, the transfer has not been completed yet. Thus, we are unable to file for Occupancy Certificate. Thus, we request you to grant us the extension for 9 months.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC0060000000898211. Sayeed Rehman and other 26Mr. Kailash Tilaku Yadav22/06/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Pristine Tower.pdf26 Feb 2020
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Ideal Developers.pdf5 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf2 Apr 2018
Layout approvalFile: P-B.pdf1 Aug 2017
Building plan approvalFile: 9_0001.pdf1 Aug 2017
Building plan approvalFile: 9_0002.pdf1 Aug 2017
Copy of the legal title reportFile: 66-4.pdf1 Aug 2017
Details of encumbrancesFile: 88_0002.pdf1 Aug 2017
Details of encumbrancesFile: 88_0001.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: P-B.pdf1 Aug 2017
Building Plan Approval (IOD)File: 9_0001.pdf1 Aug 2017
Building Plan Approval (IOD)File: 9_0002.pdf1 Aug 2017
Declaration in FORM BFile: DECLARATION.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC CERTIFICATE.pdf1 Aug 2017
Proforma of Allotment letterFile: RERA final agreement for sale.pdf1 Aug 2017
Proforma of Allotment letterFile: allotment letter pristine tower for rera.pdf1 Aug 2017
OtherFile: 44-1.pdf1 Aug 2017
PAN CardFile: Ideal developers PAN copy.pdf31 Jul 2017
Certificates of CA (Form 3)File: RERA CA Certificate.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pristine Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane (M Corp.)7,600+ in Thane

2 kmPristine TowerCompleted 78Lapsed / revoked 24Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: Ideal Developers

IDEAL DEVELOPERS has 5 registrations on MahaRERA, including BALAJI VISHWA and Pristine Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Pristine Tower shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Pristine Tower is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pristine Tower?

The registered promoter entity is Ideal Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pristine Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pristine Tower?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pristine Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pristine Tower?

The professionals named in the filing: Architect: Anil Jagwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pristine Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pristine Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pristine Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.