Home / Browse projects / PRISTINE ALLURE PART2

Registered No litigation declared Residential / Group Housing project

PRISTINE ALLURE PART2

By MAHALAXMI SHELTERS

RG-MH-75299 · RERA P52100050873 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 54%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

PRISTINE ALLURE PART2 is a Residential / Group Housing project by MAHALAXMI SHELTERS in KHARADI, 411014, registered with MahaRERA as P52100050873 on 15 May 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NamePRISTINE ALLURE PART2
  • TypeResidential / Group Housing
  • Location
    • HADAPSAR BYPASS ROAD
    • KHARADI
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050873
  • ReraGenie IDRG-MH-75299

Builder

  • NameMAHALAXMI SHELTERS
  • Entity typePartnership
  • PartnersPRITAM ISHWARCHAND GOYAL, SACHIN ISHWARCHAND GOYAL
  • Other registrations4 more →
  • Completed1 of 5
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA150000
B WINGNA150000
G WINGNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 54%.

A WING42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure54%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.28%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G WING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed219

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots219
Closed/Covered219
BuildingClosed/CoveredTotal
A WING7373
B WING7373
G WING7373

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,820 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI22608.18
Proposed, not sanctioned22,608 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Bhandarkar Road, 411004

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerPraful Jagtap
Chartered AccountantRSMS & Associates
PartnerRole in project
MAHALAXMI SHELTERS-

Litigation declared1

CaseCourtStatus
24/2021/2021HON COURT OF DISTRICT JUDGE PUNEPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 260630 - Architects Certificate Allure Part 2.pdf10 Jul 2026
Form 2File: Pristine_Allure_Part2_Form2_Q1_2026-27_10-07-2026_05-10.pdf10 Jul 2026
Form 3File: Pristine_Allure_Part2_Form3_Q1_2026-27_10-07-2026_05-08_doc1.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - PRISTINE ALLURE PART 2 AS ON JUNE 2026.pdf10 Jul 2026
Form 1File: 260331 Architects Certificate Allure Part 2.pdf20 Apr 2026
Form 2File: 260331 Engineers Certificate Allure Part 2.pdf20 Apr 2026
Form 3File: 260331 CA Certificate Allure Part 2.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - PRISTINE ALLURE PART2.pdf20 Apr 2026
Form 1File: Form 1 - Pristine Allure Part 2 as on Dec 2025.pdf27 Jan 2026
Form 2File: Form 2 - Pristine Allure Part 2 as on Dec 2025.pdf27 Jan 2026
Form 3File: Form 3 - Pristine Allure Part 2 as on Dec 2025.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pristine Allure Part 2 as on Dec 2025.pdf27 Jan 2026
Form 1File: Form 1 - Pristine Allure Part 2 as on Sept 2025.pdf19 Dec 2025
Form 2File: Form 2 - Pristine Allure Part 2 as on Sept 2025.pdf19 Dec 2025
Form 3File: Form 3 - Pristine Allure Part 2 as on Sept 2025.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pristine Allure Part 2 as on Sept 2025.pdf19 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - Pristine Allure Part 2 FY 2024-25.pdf26 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A - Pristine Allure Part 2 FY 20224-25.pdf24 Sep 2025
Form 1File: Form 1 - Pristine Allure Part 2 as on June 2025.pdf22 Sep 2025
Form 2File: Form 2 - Prisitne Allure Part 2 as on June 2025.pdf22 Sep 2025
Form 3File: Form 3 - Pristine Allure Part 2 as on June 2025.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pristine Allure Part 2 as on June 2025.pdf22 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 250331 Architects Certificate Allure Part 2.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 250331 CA Certificate Allure Part 2.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 250331 Engineers Certificate Allure Part 2.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 241231 Form 1 Part 3.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 241231 Form 1 Part 2.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pristine Allure Part 2.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Part 2-Form 2 - 31122024.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrances Allure Part 2_page-0001.pdf11 Nov 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrances Allure Part 2_page-0001.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 Part 2_compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240930 Form-1 Part 2.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Part 2_compressed.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240930 Form-2 Part 2.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240930 Form-1 Part 2.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 240630 Form 3 Part 2.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20240809 Arc Cert Part 2_page-0001.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20240809 Engg Cert Part 2.pdf14 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Part 2.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Part 2 240331.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Part 2.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Part 2.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A -Quality Assurance Part 2 23-24.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 part 2 dec 23.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PART 2.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Part-2.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Allure Part-2.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA 2 Arc Cert 230930.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA 2 Engg Cert 230930.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Till 30 June 23.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate till 30 june 23.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate part2 - 2nd edition.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate part 2- 2nd edition.pdf18 Aug 2023
Other - FinanceFile: 1.pdf22 Jun 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding financial encumbrances.pdf17 May 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding financial encumbrances.pdf17 May 2023
Declaration in FORM BFile: FORM B DECLARATION.pdf17 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM B DECLARATION.pdf17 May 2023
Proforma of Agreement for saleFile: Agreement Draft Flat Agr ABG, Pristine Allure Part 2.pdf17 May 2023
Deviation Report with respect to model copy of AgreementFile: Allure Deviation Rera.pdf17 May 2023
Commencement Certificates / NA Order for plotted developmentFile: kharadi cc_compressed.pdf2 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: NEW 1 Separate Bank Account details including no encumbrances on the Bank Account or no es27 Apr 2023
Copy of the legal title reportFile: 1 (2).pdf26 Apr 2023
CERSAI detailsFile: ilovepdf_merged.pdf26 Apr 2023
Proforma of Agreement for saleFile: Rera Draft - Allure Part 2-2.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PRITAM GOYAL.pdf24 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SACHIN GOYAL.pdf24 Apr 2023
Declaration about Commencement CertificateFile: Format 2.pdf20 Apr 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding encumbrances.pdf18 Apr 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding encumbrances.pdf18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahalaxmi Shelters Document_compressed.pdf13 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate.pdf12 Apr 2023
Proforma of Allotment letterFile: Proforma Allotment Letter_compressed.pdf12 Apr 2023
Deviation Report with respect to model copy of AgreementFile: No Deviaton Agreement to Sale.pdf12 Apr 2023
Declaration in FORM BFile: form B.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate.pdf11 Apr 2023
Deviation Report with respect to Allotment letterFile: No deviation in allotment letter.pdf11 Apr 2023
Building plan approvalFile: 9 - 29-compressed.pdf10 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NEO CITY PART 2Gat No 735 734 739150CompletedDec 2021Sep 2020
NEO CITY PART 1Gat No. 735 734 739 Neo City behind Jain College near JSPM & Lexicon International School Bakori Road Wagholi Pune Maharashtra 412 207832CompletedJul 2017Jul 2017

Keep PRISTINE ALLURE PART2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARADI

2 kmPRISTINE ALLURE PART2Completed 33Lapsed / revoked 21Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: MAHALAXMI SHELTERS

MAHALAXMI SHELTERS has 5 registrations on MahaRERA, including NEO CITY PART 2 and PRISTINE ALLURE PART 1. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if PRISTINE ALLURE PART2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRISTINE ALLURE PART2?

The registered promoter entity is MAHALAXMI SHELTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRISTINE ALLURE PART2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRISTINE ALLURE PART2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRISTINE ALLURE PART2?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Praful Jagtap; Chartered Accountant: RSMS & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRISTINE ALLURE PART2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISTINE ALLURE PART2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISTINE ALLURE PART2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.