Home / Browse projects / Pune, Maharashtra / Princetown Royal - B5

Completed No litigation declared Residential / Group Housing project

Princetown Royal - B5

By Manikchand Kumar Properties

RG-MH-16116 · RERA P52100027928 · Last updated on MahaRERA portal: 14 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Princetown Royal - B5 is a Residential / Group Housing project by Manikchand Kumar Properties in Pune, Maharashtra, registered with MahaRERA as P52100027928 on 16 Jan 2021. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NamePrincetown Royal - B5
  • TypeResidential / Group Housing
  • Location
    • NIBM Road
    • Undri
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027928
  • ReraGenie IDRG-MH-16116

Builder

  • NameManikchand Kumar Properties
  • Entity typePartnership
  • GSTIN27AANFM4061E1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAmeya Inderkumar Jain, Prakash Rasiklal Dhariwal, Rajas Vimalkumar Jain, Manish Vimalkumar Jain
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJan 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Jan 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B5NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

B5: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,873 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7310.75
Proposed, not sanctioned7,311 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society, Gen Thimaya Road, East Street, Camp, Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sameer Valimbe
EngineerNeha Dighe
Chartered AccountantSupriya Abhijit Mundada
PartnerRole in project
Manikchand Kumar Properties-

Litigation declared5

CaseCourtStatus
622/2015Civil Court Senior DivisionPending
1901/2013Civil Court Senior DivisionPending
1700/2018Civil CourtPending
42/2019Civil CourtPending
1156/2020Civil CcourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 May 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 46_Princetown Royal - B5.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 46_Princetown Royal - B5.pdf14 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240516_Completion Certificate.pdf27 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: 240527_B5_Form 4.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 4_Princetown Royal - B5.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: 4_Princetown Royal - B5.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 38_Princetown Royal - B5.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: 4_Princetown Royal - B5.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_PT B5.pdf20 Jul 2023
Declaration about Commencement CertificateFile: 230331_Declaration about CC.pdf26 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Apr 2023
Layout approvalFile: 230403_Layout.pdf3 Apr 2023
Copy of Layout Approval (in case of layout)File: 230403_Layout.pdf3 Apr 2023
Building plan approvalFile: 230331_Sheet 8 ot 22_B5_Bldg Plan_1.pdf1 Apr 2023
Building plan approvalFile: 230331_Sheet 9 ot 22_B5_Bldg Plan_2.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 230331_Sheet 8 ot 22_B5_Bldg Plan_1.pdf1 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 230331_Sheet 9 ot 22_B5_Bldg Plan_2.pdf1 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 230331_Commencement Certificate.pdf1 Apr 2023
Proforma of Agreement for saleFile: 230331_Agreement_R1.pdf1 Apr 2023
Proforma of Allotment letterFile: 230331_Allotment_R1.pdf1 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Jan 2023
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5.pdf13 Jan 2023
Copy of the legal title reportFile: 221205_Legal Title Report_compressed.pdf14 Dec 2022
Details of encumbrances concerned to FinanceFile: 221208_Encumbrance Certificate_R1.pdf14 Dec 2022
Details of encumbrances concerned to LegalFile: 221208_Encumbrance Certificate_R1.pdf14 Dec 2022
Declaration in FORM BFile: 221208_Form B_Declaration_R3.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 38_Princetown Royal - B5.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5.pdf8 Nov 2022
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5_Disclosure of Sold Inventory.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5_Quality Certificate_Form 2A.pdf16 Apr 2022
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5_Disclosure of Sold Inventory.pdf16 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf16 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf22 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg certificate.pdf22 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf22 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Princetown Royal - B5.pdf13 Dec 2021
Disclosure of sold/ booked inventoryFile: 20_Princetown Royal - B5_Disclosure of Sold Inventory.pdf22 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5_Quality Certificate_Form 2A.pdf8 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf8 Oct 2021
Declaration about Commencement CertificateFile: 38_Princetown Royal - B5.pdf7 Oct 2021
Copy of the legal title reportFile: 210709_Continuation Title Opinion_compressed.pdf19 Aug 2021
Layout approvalFile: 4_Layout.pdf25 Dec 2020
Copy of Layout Approval (in case of layout)File: 4_Layout.pdf25 Dec 2020
Proforma of Allotment letterFile: 5_Allotment and Agreement.pdf25 Dec 2020
Declaration in FORM BFile: 6_Form B_Declaration.pdf24 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8_CA Certificate.pdf19 Jun 2020
Building plan approvalFile: 13_Building Plan_1.pdf9 Mar 2020
Building plan approvalFile: 13_Building Plan_2.pdf9 Mar 2020
Copy of the legal title reportFile: 2_160922_Legal Title Report_1.pdf9 Mar 2020
Copy of the legal title reportFile: 2_180521_Legal Title Report_2.pdf9 Mar 2020
Copy of the legal title reportFile: 2_190216_Legal Title Report_3.pdf9 Mar 2020

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Princetown Royal - B3 and B6P52100046228Undri, Pune116Jun 2022CompletedMay 2027Dec 2025
Princetown Tower - C2P52100045982Undri, Pune88Jun 2022CompletedDec 2025Dec 2024
Princetown Tower - C3Undri Pune85-CompletedJul 2023Sep 2021
Princetown Royal - B2Undri Pune58-CompletedSep 2022Apr 2021
Princetown Royal - B4Undri Pune54-CompletedDec 2021Oct 2018
Princetown Royal - B1Undri Pune54-CompletedSep 2015Jul 2015
Kumar Princetown A1 to A4Undri Pune176-CompletedFeb 2013Sep 2011

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Princetown Royal - B5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

2 kmPrincetown Royal - B5Completed 83Lapsed / revoked 39Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 225 registered projects within 2 km.

Builder: Manikchand Kumar Properties

Manikchand Kumar Properties has 7 registrations on MahaRERA, including Princetown Tower - C3 and Princetown Royal - B2. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Princetown Royal - B5 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Princetown Royal - B5?

The registered promoter entity is Manikchand Kumar Properties, a partnership as per the filing. Its GSTIN 27AANFM4061E1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Princetown Royal - B5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Princetown Royal - B5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Princetown Royal - B5?

The professionals named in the filing: Architect: Ar Sameer Valimbe; Engineer: Neha Dighe; Chartered Accountant: Supriya Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Princetown Royal - B5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Princetown Royal - B5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Princetown Royal - B5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.