Home / Browse projects / Thane, Maharashtra / Primrose MHADA 2
Primrose MHADA 2
By Runwal Residency Private Limited
RG-MH-06730 · RERA P51700053843 · Last updated on MahaRERA portal: 23 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- 1 complaint at MahaRERA
- Rs 790.00 crore secured on the land, in favour of Indusind Bank Ltd
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Primrose MHADA 2 is a Residential / Group Housing project by Runwal Residency Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700053843 on 1 Dec 2023. Possession was promised by 31 Mar 2025 and is now 19 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NamePrimrose MHADA 2
- TypeResidential / Group Housing
- Location
- Kalyan Shilphata Road
- Dombivali
- Usarghar
- Kalyan
- Thane
- 421204
- Pincode421204
- RERA no.P51700053843
- ReraGenie IDRG-MH-06730
Builder
- NameRunwal Residency Private Limited
- Entity typeCompany
- CINU45400MH2011PTC212140
- DirectorsVijay Kisan Patil, Lucy Roychoudhury
- Other registrations17 more →
- Completed3 of 18
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Dec 2023
- Promised completion31 Mar 2025
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Primrose MHADA 2 EWS LIG - Building no - 2 | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Primrose MHADA 2 EWS LIG - Building no - 2: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities21
As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| seating area | Yes | 100% |
| multipurpose court | Yes | 100% |
| lawn | Yes | 100% |
| kids play area | Yes | 100% |
| drop off area | Yes | 100% |
| DG Back up for essential common area | Yes | 100% |
Parking filed906
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Sandeep Prabhu |
| Architect | Saakar Architects |
| Engineer | chetan sampat |
| Engineer | Uttam Kawathankar |
| Engineer | SHAILESH MAHIMTURA |
| Chartered Accountant | Kshirsagar and associates |
| Chartered Accountant | M B AGARWAL AND CO |
| Partner | Role in project |
|---|---|
| Runwal Residency Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503573 | Mandar Manohar Manjrekar | Runwal Residency Private Limited | 07/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Mar 2025
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Primrose MHADA.pdf | 23 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PRIMROSE 2.pdf | 26 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Lucy Roychoudhury 24th March 2 | 24 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Vijay 24th March 2025.pdf | 24 Mar 2025 |
| Declaration in FORM BFile: FORM B.pdf | 22 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Primrose MHADA-1.pdf | 22 Mar 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_FINAL.pdf | 22 Mar 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Declaration about RERA Designated Bank Accounts -.pdf | 22 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-EWS-2-2023-2024-1_cropped.pdf | 22 Mar 2025 |
| CERSAI detailsFile: CERSAI_ PRIMROSE MHADA 2.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Done Form 1 EWS 2 Dec 2024.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Done EWS-2 RERA FORM 2 ENGINEERS CERTIIFICATE.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Done Form 1 EWS 2 Dec 2024.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EWS 2 Form 3 done (1).pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EWS-2 RERA FORM 2 ENGINEERS CERTIIFICATE 30-09-24.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RRPL MHADA 2 Form 5.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EWS - EWS 2 -June 24.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EWS-2 FORM 2.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EWS 2_CA.pdf | 18 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RRPL Revised CC phase 8 dated 14 May 2024_11zon.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 - ews lig 2 - March 24.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EWS.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EWS 2.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Primrose MAHADA 2.pdf | 2 Feb 2024 |
| Other - LegalFile: page 8-15.pdf | 23 Nov 2023 |
| Other - LegalFile: page 16-22.pdf | 23 Nov 2023 |
| Other - LegalFile: page 23-30.pdf | 23 Nov 2023 |
| Other - LegalFile: page 31-37.pdf | 23 Nov 2023 |
| Other - LegalFile: page 38-43.pdf | 23 Nov 2023 |
| Other - LegalFile: page 44-49.pdf | 23 Nov 2023 |
| Other - LegalFile: page 50-55.pdf | 23 Nov 2023 |
| Other - LegalFile: page 56 -73.pdf | 23 Nov 2023 |
| Other - LegalFile: page 74-95.pdf | 23 Nov 2023 |
| Other - LegalFile: 96-119.pdf | 23 Nov 2023 |
| Other - LegalFile: 120-143.pdf | 23 Nov 2023 |
| Other - LegalFile: 144-167.pdf | 23 Nov 2023 |
| Other - LegalFile: 168- 193.pdf | 23 Nov 2023 |
| Other - LegalFile: 194-217.pdf | 23 Nov 2023 |
| Other - LegalFile: 218-242.pdf | 23 Nov 2023 |
| Other - LegalFile: 243 - last page.pdf | 23 Nov 2023 |
| Other - LegalFile: 1- page 1 to 22.pdf | 23 Nov 2023 |
| Other - LegalFile: 2-pages 23 to 36.pdf | 23 Nov 2023 |
| Other - LegalFile: 3 page 37 - 53.pdf | 23 Nov 2023 |
| Other - LegalFile: 4-page 54-73.pdf | 23 Nov 2023 |
| Other - LegalFile: 5- page 74-101.pdf | 23 Nov 2023 |
| Other - LegalFile: 6- page 102 to 127.pdf | 23 Nov 2023 |
| Other - LegalFile: 7- page 128-153.pdf | 23 Nov 2023 |
| Other - LegalFile: 8-page 154-179.pdf | 23 Nov 2023 |
| Other - LegalFile: 9- page 180-205.pdf | 23 Nov 2023 |
| Other - LegalFile: 10- page 206 - 231.pdf | 23 Nov 2023 |
| Other - LegalFile: 11-232-257.pdf | 23 Nov 2023 |
| Other - LegalFile: 12-258-284.pdf | 23 Nov 2023 |
| Other - LegalFile: 13 page 285 to 290.pdf | 23 Nov 2023 |
| Other - LegalFile: 1-page 1 to 15.pdf | 23 Nov 2023 |
| Other - LegalFile: 2-page 16-37.pdf | 23 Nov 2023 |
| Other - LegalFile: 3-page 38-49.pdf | 23 Nov 2023 |
| Other - LegalFile: 4- page 50-73.pdf | 23 Nov 2023 |
| Other - LegalFile: 5-page 74-91.pdf | 23 Nov 2023 |
| Other - LegalFile: 6- page 92-105.pdf | 23 Nov 2023 |
| Other - LegalFile: 7-page 106-118.pdf | 23 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 16 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 16 Nov 2023 |
| CERSAI detailsFile: Details of encumbrances concerned to Finance.pdf | 16 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf | 16 Nov 2023 |
| Proforma of Allotment letterFile: Allotment Letter Final.pdf | 7 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter Final.pdf | 7 Nov 2023 |
| Building plan approvalFile: 42.pdf | 21 Oct 2023 |
| Building plan approvalFile: 43.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 42.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 43.pdf | 21 Oct 2023 |
| Other - TechnicalFile: Amended CC EWS LAYOUT PLINTH HIGHLIGHTED PROFORMA.pdf | 21 Oct 2023 |
| Other - LegalFile: page 1-7.pdf | 20 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC dated - EWS 2.pdf | 12 Oct 2023 |
| Proforma of Agreement for saleFile: Runwal Gardens AFS EWS.pdf | 4 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for sale compressed.pdf | 4 Oct 2023 |
| Other - TechnicalFile: Parking Declaration - revised on 4 October 2023.pdf | 4 Oct 2023 |
| Building plan approvalFile: Amended CC WITH PLANS-58_11zon.pdf | 3 Oct 2023 |
| Layout approvalFile: Runwal Gardens Amended Layout dated 09-05-2023 plinth parking built up area highlighted fo | 3 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances finance.pdf | 3 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf | 3 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 17 other registrations, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Primrose MHADA 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivali7,600+ in Thane
Constrcution of 2557 EWS tenements at S.No.157
ARUN SHANKARRAO BORGAVE
Runwal Gardens Phase I
Runwal Residency Private Limited
Runwal Garden City Cluster 6 Tower 6 to 9
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 6A Bldg No. 53-54
Runwal Residency Private Limited
RGC Runwal My City EWS - LIG Building
HORIZON PROJECTS PVT LTD
BALAJI ESTATE PHASE 2
M/S SAI BALAJI BUILDCON
See every Thane project, with the district possession charts
Builder: Runwal Residency Private Limited
Runwal Residency Private Limited has 18 registrations on MahaRERA, including Runwal Gardens Phase I and Runwal Gardens Phase 2 Bldg no 18-23. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Primrose MHADA 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Primrose MHADA 2 is delayed beyond 31 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Primrose MHADA 2?
The registered promoter entity is Runwal Residency Private Limited, a company as per the filing. Its CIN U45400MH2011PTC212140 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Primrose MHADA 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Primrose MHADA 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Primrose MHADA 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Primrose MHADA 2?
The professionals named in the filing: Architect: Ar Sandeep Prabhu; Architect: Saakar Architects; Engineer: chetan sampat; Engineer: Uttam Kawathankar; Engineer: SHAILESH MAHIMTURA; Chartered Accountant: Kshirsagar and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Primrose MHADA 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback