Home / Browse projects / Mumbai Suburban, Maharashtra / PRAYAG HEIGHTS

Registration lapsed No litigation declared Residential / Group Housing project

PRAYAG HEIGHTS

By JENVEE INFRASTRUCTURE PVT LTD

RG-MH-24393 · RERA P51800009260 · Last updated on MahaRERA portal: 5 Sep 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
5Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

PRAYAG HEIGHTS is a Residential / Group Housing project by JENVEE INFRASTRUCTURE PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009260 on 22 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 5 complaints are on record with the regulator.

At a glance

Project

  • NamePRAYAG HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • OPPOSITE OBEROI MALL
    • MALAD EAST
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009260
  • ReraGenie IDRG-MH-24393

Builder

  • NameJENVEE INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • Managing DirectorsYOGESH TULSIDAS SHAH, DIPESH SURENDRAPRASAD SINGH
  • Declared earlier projects9 →

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA240000
WING BNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,055 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DINDOSHI PRAYAG COOP HSG SOC LTDBorivaliMumbai Suburban
AU SMALL FINANCE BANK LTD-Jaipur

Approvals and building plan

Permissible FSI4141.6
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBKC, BANDRA

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHREE DIMENSIONAL CONSULTANT LLP
PartnerRole in project
JENVEE INFRASTRUCTURE PVT LTD-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000591401NIKUNJ SHAHJENVEE INFRASTRUCTURE PVT LTD13/08/2024
CC12502053MAHADEV ANANT NAIKJENVEE INFRASTRUCTURE PVT LTD23/06/2025
CC12502105NIMESHKUMAR DALPATBHAI LADJENVEE INFRASTRUCTURE PVT LTD26/06/2025
CC12502106WILLSON SEBASTYAV DSOUZAJENVEE INFRASTRUCTURE PVT LTD27/06/2025
CC12502139NITEEN RAOSAHEB KAMBLEJENVEE INFRASTRUCTURE PVT LTD28/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jun 2022

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: PRAYAG 23RD FLOOR IOD.pdf5 Sep 2022
Building Plan Approval (IOD)File: PRAYAG 23RD FLOOR IOD.pdf5 Sep 2022
OtherFile: CFO Remark.pdf5 Sep 2022
OtherFile: CFO Plans.pdf5 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Assessment noc prayag.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HE NOC.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: LIFT COMPLETION.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Drainage COMPLETION.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WATERPROOFING CERTIFICATE.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SITE SUPERVISOR CERTIFICATE.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: STRUCTURAL STABILITY CERTIFICATE.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: STRUCTURAL PLAN.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SWM NOC.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: INTERNAL DRAIN REMARK.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VERMICULTURE NOC.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Garden OC.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RAIN WATER HARVESTING.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PARKING PICTURE.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PCO RECEIPT.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Airport Authority Height Permission.pdf2 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 1535_furthercc_signed.pdf6 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf25 Dec 2019
Building plan approvalFile: IOD PLAN_compressed.pdf7 Sep 2019
Building Plan Approval (IOD)File: IOD PLAN_compressed.pdf7 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: PRAYAG FCC_compressed.pdf27 Aug 2019
Annual Audit Report of Statutory CA (Form 5)File: RERA CA CERTIFICATE.pdf24 Aug 2019
Proforma of Allotment letterFile: AGREEMENT FOR SALE Prayag - AU SMALL FINANCE LTD.pdf18 Jun 2019
Details of encumbrancesFile: No encumbrances.pdf7 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Prayag Heights Further CC.pdf1 Jan 2019
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf22 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate PRAYAG.pdf3 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate PRAYAG.pdf3 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Final.pdf1 Aug 2018
Building plan approvalFile: IOD - 6TH FLOOR.pdf29 May 2018
Building Plan Approval (IOD)File: IOD - 6TH FLOOR.pdf29 May 2018
Commencement Certificates / NA Order for plotted developmentFile: CC UPTO 6 FLOOR.pdf29 May 2018
Proforma of Allotment letterFile: Draft AGREEMENT FOR SALE.pdf29 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 02 ARCH CERTIFICATE.pdf16 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 ENGINEERS CERTIFICATE-ilovepdf-compressed (1).pdf16 Apr 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE Draft.pdf12 Mar 2018
Proforma of Allotment letterFile: Agreement for Sale.pdf14 Dec 2017
Building plan approvalFile: Jnv CFO PLAN.pdf7 Dec 2017
Building Plan Approval (IOD)File: Jnv CFO PLAN.pdf7 Dec 2017
OtherFile: j n v con plan.pdf7 Dec 2017
OtherFile: Concession Letter.pdf7 Dec 2017
OtherFile: rera letter233.pdf31 Oct 2017
Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: compressed arch final.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: COMPRESSED ENG CERT.pdf29 Jul 2017
Certificates of CA (Form 3)File: RERA244.pdf29 Jul 2017
Building plan approvalFile: iod.pdf27 Jul 2017
Layout approvalFile: Drawing.pdf27 Jul 2017
PAN CardFile: PANCARD COMPANY002.pdf27 Jul 2017
Copy of the legal title reportFile: title report.pdf27 Jul 2017
Details of encumbrancesFile: ENCUMB.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Drawing.pdf27 Jul 2017
Building Plan Approval (IOD)File: iod.pdf27 Jul 2017
Declaration in FORM BFile: form b.pdf27 Jul 2017
Proforma of Allotment letterFile: ALLOT AND AGREE.pdf27 Jul 2017

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 not delivered by the promised date5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHREE GOPALDHAMP51800079265KANDIVALI WEST, Mumbai Suburban-Feb 2025OngoingDec 2030Not due yet
JEANDVEESAIDHAM - A WINGP51800080568NEAR DINDOSHI METRO STATION, Mumbai Suburban-Jun 2025OngoingDec 2029Not due yet
JEANDVEESAIDHAM - B WINGP51800055922DINDOSHI NAGAR, MALAD EAST, Mumbai Suburban-Apr 2024OngoingDec 2028Not due yet
SHREE SATYAM IIP51800054109DINDOSHI NAGAR, Mumbai Suburban-Dec 2023OngoingDec 2027Not due yet
JEANDVEEKEDARNATHP51800030984DAHISAR - EAST, Mumbai Suburban-Sep 2021OngoingDec 2026Registered original: Apr 2025Not due yet
MADHUBANP51800020431DINDOSHI MALAD EAST, Mumbai Suburban110Apr 2019OngoingMar 2026Registered original: Dec 2023Not delivered
VrindavanP51800017298OPP OBEROI MALL, Mumbai Suburban-Jul 2018CompletedDec 2024Jun 2024
SHIVKRUPAP51800025225OPP. OBEROI MALL, NEAR FIRE BRIGADE, Mumbai Suburban242Mar 2020OngoingDec 2024Not delivered
OM TRIMURTIP51800020394OPP OBEROI MALL, Mumbai Suburban-Apr 2019CompletedAug 2024Registered original: Dec 2023Aug 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAYAG HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmPRAYAG HEIGHTSCompleted 99Lapsed / revoked 64Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 281 registered projects within 2 km.

Builder: JENVEE INFRASTRUCTURE PVT LTD

JENVEE INFRASTRUCTURE PVT LTD has 1 registration on MahaRERA, including PRAYAG HEIGHTS. Its filings disclose 9 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PRAYAG HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRAYAG HEIGHTS is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAYAG HEIGHTS?

The registered promoter entity is JENVEE INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAYAG HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRAYAG HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRAYAG HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAYAG HEIGHTS?

The professionals named in the filing: Architect: THREE DIMENSIONAL CONSULTANT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAYAG HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAYAG HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAYAG HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.