Home / Browse projects / PRASUN SARVAM

Completed No litigation declared Residential / Group Housing project

PRASUN SARVAM

By Prasun Associates

RG-MH-12847 · RERA P52100021383 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2024Possession promisedregistration recorded completed
10 of 66Construction stages doneacross 6 buildings; furthest along: Basement (if any), 50%
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

PRASUN SARVAM is a Residential / Group Housing project by Prasun Associates in Kharadi, 411014, registered with MahaRERA as P52100021383 on 24 Jun 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NamePRASUN SARVAM
  • TypeResidential / Group Housing
  • Location
    • Acolade Road
    • Kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021383
  • ReraGenie IDRG-MH-12847

Builder

  • NamePrasun Associates
  • Entity typePartnership
  • GSTIN27AABFP3837B1ZJ
  • PartnersPrakash Nandlal Chawla, Sunil Nandlal Chawla
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredJun 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jun 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings6 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA160000
BNA160000
CNA160000
DNA160000
ENA160000
FNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Basement (if any), at 50%.

A18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed303

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots303
Closed/Covered288
Open Space15
BuildingClosed/CoveredOpen SpaceTotal
A48048
B48048
C48755
D48856
E48048
F48048

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,953 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI17503.0
Proposed, not sanctioned17,503 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround And Mazzanine Floor, PWD 24/9 And 10l, Near Ashok Theatre And Shastri Garden, Pimpri, Pune 41

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects
PartnerRole in project
Prasun Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Nov 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: INDEX II-Conveyance Deed-SARVAM.pdf23 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Prasun Sarvam_FY 2023-24.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf13 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate-Dtd-09-10-2023-SARVAM.pdf21 Nov 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf21 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.pdf4 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2020-21.pdf4 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf4 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupation Certificate-OCC-0002-23-Dtd-03-04-2023-SARVAM.pdf4 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Prasun Sarvam Society Registration Certificate-Dtd-25-01-2023.pdf31 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory-dtd-09-01-2023.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineers Certificate_compressed.pdf20 Jan 2023
Certificates of CA (Form 3)File: FORM 3.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Prasun Ass-2021-2022.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5_Prasun Associates (Sarvam)_March 21_compressed.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory Till 15072021_compressed.pdf2 Aug 2021
Proforma of Allotment letterFile: Proforma of the Agreement for Sale_Dtd_15072021.pdf31 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Dtd-15-07-2021.pdf26 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5_Prasun Survam.pdf29 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Declaration-Prasun Homes.pdf20 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-16-10-2020-SARVAM_compressed.pdf6 Nov 2020
Proforma of Allotment letterFile: Revised Agreement Draft-SARVAM_compressed.pdf6 Nov 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf22 Aug 2020
Proforma of Allotment letterFile: Agreement-Prasun Sarvam.pdf9 Dec 2019
Proforma of Allotment letterFile: Allotment-Sarvam-Flat.pdf9 Dec 2019
Copy of the legal title reportFile: Title Report.pdf19 Jun 2019
Proforma of Allotment letterFile: Agreement-Sarvam-19062019-min.pdf19 Jun 2019
Proforma of Allotment letterFile: Allotment-Sarvam-Flat-19062019.pdf19 Jun 2019
Certificates of CA (Form 3)File: Scan copy CA certificate 14062019.pdf14 Jun 2019
Layout approvalFile: Layout-page-001.pdf13 Jun 2019
Building plan approvalFile: IOD.pdf13 Jun 2019
PAN CardFile: PAN-Prasun Associates-New.pdf13 Jun 2019
Copy of Layout Approval (in case of layout)File: Layout-page-001.pdf13 Jun 2019
Building Plan Approval (IOD)File: IOD.pdf13 Jun 2019
Details of encumbrancesFile: Self Declaration Regarding Encumbrances.pdf6 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Building.pdf6 Jun 2019
Declaration in FORM BFile: Form B-Affidavit Cum Declaration-Prasun Associates_compressed.pdf6 Jun 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Prasun ElaraPR1260002503034Haveli, Pune49Mar 2026OngoingDec 2028Not due yet
Prasun AdaraP52100077000kharadi146Jul 2024OngoingMay 2028Not due yet
Prasun MoryaP52100025761Thergaon, Pune-Jul 2020CompletedDec 2020Jul 2020
Prasun SavoySurvey No 22 Part Dhanori Lohegaon Road Dhanori Pune 411014195-CompletedApr 2017Apr 2017

Keep PRASUN SARVAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharadi

2 kmPRASUN SARVAMCompleted 55Lapsed / revoked 27Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: Prasun Associates

Prasun Associates has 5 registrations on MahaRERA, including PRASUN SARVAM and Prasun Morya. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if PRASUN SARVAM is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRASUN SARVAM?

The registered promoter entity is Prasun Associates, a partnership as per the filing. Its GSTIN 27AABFP3837B1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRASUN SARVAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRASUN SARVAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRASUN SARVAM?

The professionals named in the filing: Architect: Malwadkar Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRASUN SARVAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRASUN SARVAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRASUN SARVAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.