Registration lapsed No litigation declared Residential / Group Housing project

POONAM IMPERIA PHASE I

By POONAM SKYLINE CONSTRUCTION

RG-MH-66078 · RERA P99000017908 · Last updated on MahaRERA portal: 28 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 21 months past the filed date
  • Completion date moved by 26 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jan 2025Possession promised21 months past this date
37 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

POONAM IMPERIA PHASE I is a Residential / Group Housing project by POONAM SKYLINE CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000017908 on 25 Sep 2018. Possession was promised by 31 Jan 2025 and is now 21 months past that date. The completion date has moved by 26 months from the original filing.

At a glance

Project

  • NamePOONAM IMPERIA PHASE I
  • TypeResidential / Group Housing
  • Location
    • NEAR VITTHAL MANDIR
    • WALIV
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000017908
  • ReraGenie IDRG-MH-66078

Builder

  • NamePOONAM SKYLINE CONSTRUCTION
  • Entity typePartnership
  • PartnersMANEK JUGRAJ MEHTA HUF, VIDHYA NAVRATN JAIN
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

21 months past promisethis monthRegisteredSep 2018First promiseNov 2022Revised toJan 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Sep 2018
  • Promised completion31 Jan 2025
  • Revised completionRevised to 31 Jan 2025 (originally 30 Nov 2022)
  • Buildings4 building records
  • Documents filed159 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA150000
B WINGNA150000
C WINGNA150000
H WINGNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes80%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered143
Open Space23
BuildingClosed/CoveredOpen SpaceTotal
A WING44044
B WING53053
C WING45045
H WING12324

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,274 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13216.0
Proposed, not sanctioned13,216 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR VIRAR RAILWAY STATION

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON ARCHITECTURAL & STRUCTURAL WORKS PROJECT CONSULTANTS
EngineerAJAY SHAH
Chartered AccountantHARSH N SHAH
PartnerRole in project
POONAM SKYLINE CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000010764Nov 2022 → Oct 2023

Reason as filed by the promoterDue to lockdown situation.

EXT99000019092Nov 2022 → Jan 2025

Reason as filed by the promoterThe project comprised of Total 4 Wings namely Wings A, B, C & H, of which, we have completed construction of Wings B, C & H and have also applied for OC. However, due to lack of timely recovery of sale proceeds from customers we are facing financial constraints. This lead to reduction in overall construction speed of the Project. We have already completed 3 Wings and we are optimistic to complete the construction of pending Wing A by 30-April-2025. We therefore, request to grant us the extension upto 30-April-2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Dec 2024

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Skyline Form 3 June 24.pdf28 Feb 2025
Certificates of CA (Form 3)File: Skyline Form 3 Sept 24.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Skyline Form 2 June 24.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Skyline Form 2 Sept 24.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PSC FORM -5 2023-24.pdf26 Feb 2025
Other - TechnicalFile: IMPERIA A OC VERIFICATION.pdf25 Feb 2025
Other - TechnicalFile: IMPERIA BCH OC VERIFICATION.pdf25 Feb 2025
Layout approvalFile: WALIV LAYOUT PLAN.pdf20 Feb 2025
Building plan approvalFile: b wing plan waliv.pdf20 Feb 2025
Building plan approvalFile: C wing plan waliv.pdf20 Feb 2025
Building plan approvalFile: h wing plan waliv.pdf20 Feb 2025
Copy of Layout Approval (in case of layout)File: WALIV LAYOUT PLAN.pdf20 Feb 2025
Building Plan Approval (IOD)File: b wing plan waliv.pdf20 Feb 2025
Building Plan Approval (IOD)File: h wing plan waliv.pdf20 Feb 2025
Building Plan Approval (IOD)File: C wing plan waliv.pdf20 Feb 2025
Building plan approvalFile: WING A-compressed.pdf19 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SKYLINE SEPT 2024.pdf19 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Feb 2025
Building Plan Approval (IOD)File: WING A-compressed.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A SKYLINE 2024.pdf19 Feb 2025
Certificates of CA (Form 3)File: Form 3 Skyline March 24.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Skyline March 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SKYLINE MARCH 2024.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SKYLINE JUNE 2024.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 WALIV.pdf2 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC COPY WALIV.pdf2 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Waliv A Wing.pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 vista B and C wing.pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Waliv wing A OC.pdf8 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Waliv Wing BCH OC.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold (Imperia) (2).pdf5 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VP-5155 ANNEXURE-A_compressed.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SKYLINE DEC 2023.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A SKYLINE DEC 2023.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 13-02-2024.pdf16 Feb 2024
Certificates of CA (Form 3)File: FORM-3 SKYLINE DEC 2023.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 WALIV JUNE 2023.pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM- 2 SKYKINE SEP 2023.pdf13 Feb 2024
Certificates of CA (Form 3)File: FORM - 3 SKYLINE MAR 2023.pdf13 Feb 2024
Certificates of CA (Form 3)File: FORM 3 WALIV JUNE 2023.pdf13 Feb 2024
Certificates of CA (Form 3)File: FORM -3 SKYLINE SEP 2023.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold (Imperia) (1).pdf22 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WALIV FORM 1 SEPT_compressed.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 WALIV 22 23.pdf22 Sep 2023
Proforma of Agreement for saleFile: 5 Proforma of Allotment letter.pdf22 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Imperia form 1_compressed.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold (Imperia).pdf21 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar'23.pdf10 May 2023
Certificates of CA (Form 3)File: FORM 3 WALIV DEC 2022.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 WALIV DEC 2022.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 WALIV DEC 2022.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: imperia form 5 2021-22.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: imperia form 5 2022-23.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD WALIV.pdf10 Jan 2023
Declaration about Commencement CertificateFile: WALIV DECLARATION OF CC.pdf3 Jan 2023
Disclosure of sold/ booked inventoryFile: WALIV SOLD UNSOLD LIST.pdf3 Jan 2023
Details of encumbrancesFile: ENCUMBRANCE LETTER- WALIV.pdf27 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 IMPERIA ( SEPT 22) FINAL.pdf27 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT POONAM IMPERIA 2022.pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ( MARCH -22 ) WALIV.pdf27 Dec 2022
Certificates of CA (Form 3)File: FORM 3 WALIV MARCH 2022.pdf27 Dec 2022
Certificates of CA (Form 3)File: FORM 3 WALIV JUN 2022.pdf27 Dec 2022
Layout approvalFile: MYSCAN_20220823_0004_compressed.pdf3 Sep 2022
Building plan approvalFile: MYSCAN_20220823_0005_compressed.pdf3 Sep 2022
Building plan approvalFile: MYSCAN_20220823_0006_compressed.pdf3 Sep 2022
Building plan approvalFile: MYSCAN_20220823_0007_compressed (1).pdf3 Sep 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220823_0004_compressed.pdf3 Sep 2022
Building Plan Approval (IOD)File: MYSCAN_20220823_0005_compressed.pdf3 Sep 2022
Building Plan Approval (IOD)File: MYSCAN_20220823_0006_compressed.pdf3 Sep 2022
Building Plan Approval (IOD)File: MYSCAN_20220823_0007_compressed (1).pdf3 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised CC (RDP) (1).pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ( MARCH 22) WALIV.pdf3 Sep 2022
Proforma of Allotment letterFile: MHADA Draft.pdf3 Sep 2022
Proforma of Allotment letterFile: MHADA Draft.pdf3 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2022 WALIV.pdf31 Jul 2022
Disclosure of sold/ booked inventoryFile: WALIV SOLD UNSOLD INVENTORY.pdf29 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ( MARCH 22) WALIV.pdf22 Jun 2022
Proforma of Allotment letterFile: Draft Agreement (Poonam Imperia).pdf8 Jun 2022

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 26 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POONAM IMPERIA PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WALIV3,200+ in Palghar

2 kmPOONAM IMPERIA PHASE ICompleted 20Lapsed / revoked 7Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: POONAM SKYLINE CONSTRUCTION

POONAM SKYLINE CONSTRUCTION has 2 registrations on MahaRERA, including POONAM IMPERIA PHASE I and POONAM IMPERIA PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that POONAM IMPERIA PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if POONAM IMPERIA PHASE I is delayed beyond 31 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POONAM IMPERIA PHASE I?

The registered promoter entity is POONAM SKYLINE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POONAM IMPERIA PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POONAM IMPERIA PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POONAM IMPERIA PHASE I?

The professionals named in the filing: Architect: ENCON ARCHITECTURAL & STRUCTURAL WORKS PROJECT CONSULTANTS; Engineer: AJAY SHAH; Chartered Accountant: HARSH N SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POONAM IMPERIA PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POONAM IMPERIA PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POONAM IMPERIA PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.