Home / Browse projects / Aurangabad, Maharashtra / KASHI GOPAL PARK
KASHI GOPAL PARK
By KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE
RG-MH-15951 · RERA P51500050284 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KASHI GOPAL PARK is a Others project by KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE in Aurangabad, Maharashtra, registered with MahaRERA as P51500050284 on 1 Apr 2023. Possession is promised by 30 Dec 2029. The completion date has moved by 48 months from the original filing. 3 of the 52 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.
At a glance
Project
- NameKASHI GOPAL PARK
- TypeOthers
- Location
- GANGAPUR VAIJAPUR ROAD
- BUS STAND ROAD
- Gangapur (M Cl)
- Gangapur
- Aurangabad
- 431109
- Pincode431109
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500050284
- ReraGenie IDRG-MH-15951
Builder
- NameKAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE
- Entity typeOthers
- PartnerKAMALAKAR KASHINATHRAO SABNE SABNE
- PartnersSUDHAKAR KASHINATH SABNE SABNE, PRABHAKAR KASHINATH SABNE SABNE, MADHUKAR KASHINATH SABNE SABNE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Apr 2023
- Promised completion30 Dec 2029
- Revised completionRevised to 30 Dec 2029 (originally 25 Dec 2025)
- Buildings2 building records
- Documents filed73 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A1 | NA | 4 | 4 | 12 | 14 | 26 |
| BUILDING A2 | NA | 4 | 4 | 12 | 14 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.
BUILDING A128%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING A218%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING A1 | 6 | 30 | 36 |
| BUILDING A2 | 6 | 30 | 36 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A1 | NA | Rs 2.70 cr | Rs 15.50 lakh |
| BUILDING A2 | NA | Rs 2.70 cr | Rs 15.50 lakh |
| - | NA | Rs 5.00 lakh | Rs 1.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY SONAR |
| Engineer | RAKESH BHATT |
| Engineer | CHAITANYA BHALERAO |
| Engineer | Chaitanya S Bhalerao |
| Chartered Accountant | KAPVALT & CO |
| Partner | Role in project |
|---|---|
| KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project could not be completed within the originally declared timeline due to unavoidable delays in execution of construction activities, availability of resources, and procedural compliances. The project remains ongoing and active, and the promoter is fully committed to completing the balance work within the extended period sought.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2029
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf | 20 Jun 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Form 1File: Form 1.pdf | 19 Mar 2026 |
| Form 2File: Form 2.pdf | 19 Mar 2026 |
| Form 3File: Form 3.pdf | 19 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf | 19 Mar 2026 |
| Form 2A (FY 2023-2024)File: From 2A FY 23-24.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: RERA FORM-1.PDF | 22 Dec 2025 |
| Withdrawal Update Form 2File: form-2pdf_Sep2025.pdf | 22 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf | 22 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form_2A_Engineer_Certificate_Kashi_Gopal_Park.pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form_5_Annual_Report_Kashi_Gopal_Park1.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: RERA FORM-1.PDF | 29 Aug 2025 |
| Withdrawal Update Form 2File: form2.PDF | 29 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate Form 3 Q4.pdf | 29 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Kashi Gopal Park.pdf | 16 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Updation.pdf | 16 Mar 2023 |
| PAN CardFile: Declaration and PAN.pdf | 3 Mar 2023 |
| Copy of the legal title reportFile: Search Report REVISED.PDF | 3 Mar 2023 |
| Proforma of Agreement for saleFile: ATS Compressed-1-10.pdf | 3 Mar 2023 |
| Proforma of Agreement for saleFile: ATS Compressed-11-19.pdf | 3 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration NEW.PDF | 3 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report ATS.pdf | 3 Mar 2023 |
| Layout approvalFile: Approved Layout_compressed.pdf | 9 Feb 2023 |
| Building plan approvalFile: Building Plan_rotated.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal.pdf | 9 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Approved Layout_compressed.pdf | 9 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan_rotated.pdf | 9 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate0001.PDF | 9 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration About CC (Format D).pdf | 9 Feb 2023 |
| Declaration in FORM BFile: Affidavit (Form B) - Landowner.PDF | 9 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257163293_For_Asset_Based_Search_10_01_2023_10_59_42_006.pdf | 9 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Interest (Annexure A) All_compressed.pdf | 9 Feb 2023 |
| Proforma of Allotment letterFile: Allotment Letter.PDF | 9 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf | 9 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KASHI GOPAL PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BUS STAND ROAD1,400+ in Aurangabad
PMAY591 EWS housing in S.no 29 Mouje Ambewadi
Samarath Multibiz JV
SARA ANGAN PHASE-II
Sara Infrastructures
KHASWA PARK
SHAIKH SUBHAN BAPUJI PATEL, SHAIKH FAROOQ
BANSILAL NAGAR
BHAGWANSING BANSISING RAJPUT
PMAY U Tisgaon 227 B
Unity Developers
PMAY U Sundarwadi 10
Aurathrone Infra
See every Aurangabad project, with the district possession charts
Builder: KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE
KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE has 1 registration on MahaRERA, including KASHI GOPAL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if KASHI GOPAL PARK is delayed beyond 30 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KASHI GOPAL PARK?
The registered promoter entity is KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KASHI GOPAL PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KASHI GOPAL PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KASHI GOPAL PARK?
The professionals named in the filing: Architect: SANJAY SONAR; Engineer: RAKESH BHATT; Engineer: CHAITANYA BHALERAO; Engineer: Chaitanya S Bhalerao; Chartered Accountant: KAPVALT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KASHI GOPAL PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback