ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / KASHI GOPAL PARK

Registered No litigation declared Others project

KASHI GOPAL PARK

By KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE

RG-MH-15951 · RERA P51500050284 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 48 months from the original
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 10%
49 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

KASHI GOPAL PARK is a Others project by KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE in Aurangabad, Maharashtra, registered with MahaRERA as P51500050284 on 1 Apr 2023. Possession is promised by 30 Dec 2029. The completion date has moved by 48 months from the original filing. 3 of the 52 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameKASHI GOPAL PARK
  • TypeOthers
  • Location
    • GANGAPUR VAIJAPUR ROAD
    • BUS STAND ROAD
    • Gangapur (M Cl)
    • Gangapur
    • Aurangabad
    • 431109
  • Pincode431109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500050284
  • ReraGenie IDRG-MH-15951

Builder

  • NameKAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE
  • Entity typeOthers
  • PartnerKAMALAKAR KASHINATHRAO SABNE SABNE
  • PartnersSUDHAKAR KASHINATH SABNE SABNE, PRABHAKAR KASHINATH SABNE SABNE, MADHUKAR KASHINATH SABNE SABNE

Key dates

this monthRegisteredApr 2023First promiseDec 2025Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Apr 2023
  • Promised completion30 Dec 2029
  • Revised completionRevised to 30 Dec 2029 (originally 25 Dec 2025)
  • Buildings2 building records
  • Documents filed73 files

Current status

6%3 of 52 units booked
5.9%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A1NA44121426
BUILDING A2NA44121426

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

BUILDING A128%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered12
Open Space60
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A163036
BUILDING A263036

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,776 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 May 2026

Approvals and building plan

Sanctioning authorityNagar Parishad Gangapur
Permissible FSI2985.51
Proposed, not sanctioned2,986 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGAPUR AUARANGABAD
Estimated costRs 5.45 cr
Cost incurredRs 32.00 lakh
Work done5.87%
BuildingWingEstimatedIncurred
BUILDING A1NARs 2.70 crRs 15.50 lakh
BUILDING A2NARs 2.70 crRs 15.50 lakh
-NARs 5.00 lakhRs 1.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY SONAR
EngineerRAKESH BHATT
EngineerCHAITANYA BHALERAO
EngineerChaitanya S Bhalerao
Chartered AccountantKAPVALT & CO
PartnerRole in project
KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23122518935Dec 2025 → Dec 2029

Reason as filed by the promoterThe project could not be completed within the originally declared timeline due to unavoidable delays in execution of construction activities, availability of resources, and procedural compliances. The project remains ongoing and active, and the promoter is fully committed to completing the balance work within the extended period sought.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf14 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf14 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf20 Jun 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Form 1File: Form 1.pdf19 Mar 2026
Form 2File: Form 2.pdf19 Mar 2026
Form 3File: Form 3.pdf19 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf19 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf19 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf19 Mar 2026
Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf19 Mar 2026
Form 2A (FY 2023-2024)File: From 2A FY 23-24.pdf19 Mar 2026
Withdrawal Update Form 1File: RERA FORM-1.PDF22 Dec 2025
Withdrawal Update Form 2File: form-2pdf_Sep2025.pdf22 Dec 2025
Withdrawal Update Form 3File: CA Certificate Form 3 Q4 pdf.pdf22 Dec 2025
Form 2A (FY 2024-2025)File: Form_2A_Engineer_Certificate_Kashi_Gopal_Park.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: Form_5_Annual_Report_Kashi_Gopal_Park1.pdf28 Oct 2025
Withdrawal Update Form 1File: RERA FORM-1.PDF29 Aug 2025
Withdrawal Update Form 2File: form2.PDF29 Aug 2025
Withdrawal Update Form 3File: CA Certificate Form 3 Q4.pdf29 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Kashi Gopal Park.pdf16 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Updation.pdf16 Mar 2023
PAN CardFile: Declaration and PAN.pdf3 Mar 2023
Copy of the legal title reportFile: Search Report REVISED.PDF3 Mar 2023
Proforma of Agreement for saleFile: ATS Compressed-1-10.pdf3 Mar 2023
Proforma of Agreement for saleFile: ATS Compressed-11-19.pdf3 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration NEW.PDF3 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report ATS.pdf3 Mar 2023
Layout approvalFile: Approved Layout_compressed.pdf9 Feb 2023
Building plan approvalFile: Building Plan_rotated.pdf9 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf9 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal.pdf9 Feb 2023
Copy of Layout Approval (in case of layout)File: Approved Layout_compressed.pdf9 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_rotated.pdf9 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate0001.PDF9 Feb 2023
Declaration about Commencement CertificateFile: Declaration About CC (Format D).pdf9 Feb 2023
Declaration in FORM BFile: Affidavit (Form B) - Landowner.PDF9 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200257163293_For_Asset_Based_Search_10_01_2023_10_59_42_006.pdf9 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Interest (Annexure A) All_compressed.pdf9 Feb 2023
Proforma of Allotment letterFile: Allotment Letter.PDF9 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf9 Feb 2023

How this compares with Aurangabad

6%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 48 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep KASHI GOPAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BUS STAND ROAD1,400+ in Aurangabad

Builder: KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE

KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE has 1 registration on MahaRERA, including KASHI GOPAL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if KASHI GOPAL PARK is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KASHI GOPAL PARK?

The registered promoter entity is KAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KASHI GOPAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KASHI GOPAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KASHI GOPAL PARK?

The professionals named in the filing: Architect: SANJAY SONAR; Engineer: RAKESH BHATT; Engineer: CHAITANYA BHALERAO; Engineer: Chaitanya S Bhalerao; Chartered Accountant: KAPVALT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KASHI GOPAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KASHI GOPAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KASHI GOPAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.