Home / Browse projects / Nagpur, Maharashtra / Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur

Completed No litigation declared Residential / Group Housing project

Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur

By MHADA (Nagpur Board)

RG-MH-83697 · RERA P50500052672 · Last updated on MahaRERA portal: 1 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 21 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur is a Residential / Group Housing project by MHADA (Nagpur Board) in Nagpur, Maharashtra, registered with MahaRERA as P50500052672 on 15 Sep 2023. The registration is recorded completed; possession was promised by 31 Dec 2023.

At a glance

Project

  • NamePlot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur
  • TypeResidential / Group Housing
  • Location
    • Subhash Road
    • Ganesh Peth
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440018
  • Pincode440018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500052672
  • ReraGenie IDRG-MH-83697

Builder

  • NameMHADA (Nagpur Board)
  • Entity typePublic Authority
  • Other registrations21 more →
  • Completed15 of 22
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredSep 2023PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Sep 2023
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
2ANA180000
2BNA180000
2CNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

2A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
2B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
2C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 1 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered3
Open Space3
BuildingClosed/CoveredOpen SpaceTotal
2A112
2B112
2C112

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,428 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Nagpur Housing and Area Development BoardNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI20663.4
Proposed, not sanctioned20,663 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSitabuldi Nagpur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Vinayak Bhalerao
EngineerMr Piyush Arun Kamble
Chartered AccountantMr Jaideo Chiwande
PartnerRole in project
MHADA (Nagpur Board)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 May 2025

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC Plot 2.pdf1 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC and Completion Certi 224.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PLOT NO 2 (224).pdf21 Dec 2023
Declaration about Commencement CertificateFile: Formate D plot no 2.pdf7 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth approval 224.pdf5 Sep 2023
Declaration in FORM BFile: Form B Affidavit 224 (1).pdf5 Sep 2023
Copy of the legal title reportFile: Mhada City Land Documents.pdf28 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: plot no 02 Format A.pdf28 Aug 2023
Details of encumbrances concerned to FinanceFile: 1a finance legal plot no 2.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: 1a finance legal plot no 2.pdf25 Aug 2023
CERSAI detailsFile: No CERSAI Report 224.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 224 (1).pdf25 Aug 2023
Building plan approvalFile: BUILD PLAN-01 (PLOT-2)-1.pdf9 Aug 2023
Building plan approvalFile: BUILD PLAN-01 (PLOT-2)-3.pdf9 Aug 2023
Building plan approvalFile: BUILD PLAN-01 (PLOT-2)-2.pdf9 Aug 2023
Building plan approvalFile: BUILD PLAN-01 (PLOT-2)-4.pdf9 Aug 2023
Building plan approvalFile: BUILD PLAN-01 (PLOT-2)-5.pdf9 Aug 2023
Layout approvalFile: SANCTION LAYOUT PLAN EMP MILL.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT PLAN EMP MILL.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILD PLAN-01 (PLOT-2)-1.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILD PLAN-01 (PLOT-2)-3.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILD PLAN-01 (PLOT-2)-2.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILD PLAN-01 (PLOT-2)-4.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILD PLAN-01 (PLOT-2)-5.pdf9 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-plot 2.pdf9 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ar 224 (1).pdf9 Aug 2023
Details of encumbrances concerned to FinanceFile: 1a 224 legal (1).pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: 1a 224 legal (1).pdf8 Aug 2023
PAN CardFile: 1 MHADA PAN Card-224.pdf17 May 2023
Copy of the legal title reportFile: 2 Legal title report 224.pdf17 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 18 Disclosure of interest 224.pdf17 May 2023
Proforma of Agreement for saleFile: 23 Proforma of agreement for sale 120.PDF17 May 2023
Proforma of Allotment letterFile: 24 Proforma of allotment letter-120.pdf17 May 2023
Deviation Report with respect to Allotment letterFile: 35 Deviation report wrt Allotment letter 224.pdf17 May 2023
Deviation Report with respect to model copy of AgreementFile: 36 Deviation report wrt model copy of Agreement 224.pdf17 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Construction of 168 EWS 24 MIG 20 shops 10 Office chambers at S No 124 Datala ChandrapurDatala Chanrapur 442401192CompletedApr 2019Late, Dec 2019

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Plot No.02,House No.175,Ward No.06,C.S. No.1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ganesh Peth2,800+ in Nagpur

2 kmPlot No.02,House No.175,Completed 37Lapsed / revoked 16Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: MHADA (Nagpur Board)

MHADA(Nagpur Board) has 22 registrations on MahaRERA, including Construction of 14 Rowhouses at Waddhamna Nagpur and Site No.124, Datala, New Chandrapur. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur?

The registered promoter entity is MHADA (Nagpur Board), a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur?

The professionals named in the filing: Architect: Mr Vinayak Bhalerao; Engineer: Mr Piyush Arun Kamble; Chartered Accountant: Mr Jaideo Chiwande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Plot No.02,House No.175,Ward No.06,C.S. No.1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.