Home / Browse projects / Mumbai City, Maharashtra / Piramal Aranya - Wing C
Piramal Aranya - Wing C
By Glider Buildcon Realtors Private Limited
RG-MH-03011 · RERA P51900020330 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 9 cases
- 7 complaints at MahaRERA
- Rs 1,850.00 crore secured on the land, in favour of hdfc bank
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Piramal Aranya - Wing C is a Residential / Group Housing project by Glider Buildcon Realtors Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900020330 on 5 Apr 2019. Possession is promised by 28 Aug 2027. 254 of the 337 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NamePiramal Aranya - Wing C
- TypeResidential / Group Housing
- Location
- Rambhau Bhogle Marg
- Byculla East
- Mumbai
- Byculla East
- Mumbai City
- 400010
- Pincode400010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900020330
- ReraGenie IDRG-MH-03011
Builder
- NameGlider Buildcon Realtors Private Limited
- Entity typeCompany
- CINU70200MH2015PTC265844
- GSTIN27AAGCG0288B1ZU
- DirectorPankaj S Mundada
- Other registrations3 more →
- Completed1 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2019
- Promised completion28 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed180 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Piramal Aranya - Wing C | NA | 66 | 44 | 337 | 0 | 337 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Piramal Aranya - Wing C: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 55% |
| Street Lighting | Yes | 55% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | Yes | 70% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed487
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Piramal Aranya - Wing C | NA | Rs 410.52 cr | Rs 409.34 cr |
| - | NA | Rs 58.14 cr | Rs 58.14 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Shikre Associates |
| Engineer | Turner and Townsend Pvt Ltd |
| Engineer | Kishor Parmar |
| Chartered Accountant | SRBC & CO LLP |
| Chartered Accountant | D B Ketkar & Co |
| Partner | Role in project |
|---|---|
| Glider Buildcon Realtors Private Limited | - |
Litigation declared9
| Case | Court | Status |
|---|---|---|
| 29408/2018 | Supreme Court | Ongoing |
| CC006000000193444/2020 | MAHARERA AUTHORITY | Closed |
| CC006000000196722/2021 | MAHARERA AUTHORITY | Closed |
| CC006000000196734/2021 | MAHARERA AUTHORITY | Closed |
| 1/2019 | BOMBAY HIGHCOURT | Closed |
| 491/2020 | BOMBAY HIGHCOURT | Closed |
| 8300/2023 | BOMBAY HIGHCOURT | Ongoing |
| 15438/2019 | Supreme Court of India | Ongoing |
| 9859/2024 | Supreme Court | Closed |
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193444 | MR. TAUHID AHMED KHAN AND MRS NIKHAT TAUHID KHAN | GLIDER BUILDCON REALTORS PRIVATE LIMITED | 15/07/2020 |
| CC006000000196722 | Abdul Hafiz Mohd. Mumtaz Baig | Glider Buildcon Realtors Pvt. Ltd | 17/04/2021 |
| CC006000000196734 | Abdul Hakim Mohd. Mumtaz Baig | Glider Buildcon Realtors Pvt. Ltd | 17/04/2021 |
| CC006000000220798 | Tasneem Sadikot | Glider Buildcon Realtors Pvt Ltd. c/o Piramal Realty | 13/04/2022 |
| CC006000000408445 | GLIDER BUILDCON REALTORS PRIVATE LIMITED | SAYED ANSAR HAIDER | 11/12/2023 |
| CC12502396 | Glider Buildcon Realtors Private Limited | Nilofer Mohammed Qaiyum Shaikh | 15/07/2025 |
| SM12500190 | Bhakti Achrekar | Glider Buildcon Realtors Private Limited | 26/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 28 Aug 2027
Documents filed180
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 180 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 00 Form 2A Aranya Ahan.pdf | 30 Jun 2026 |
| Commencement certificateFile: Ahan Full OC.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 01 Form 1 - Ahan Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 01 Form 2 - Ahan Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 01 Form 3 - Ahan Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 01 Form 1 - Ahan.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: 01 Form 2 - Ahan.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: 01 Form 3 - Ahan.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1, Ahan - Sept 2025.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: Form 2, Ahan - Sept 2025.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Form 2, Ahan - Sept 2025.pdf | 24 Nov 2025 |
| Withdrawal Update Form 1File: Form 1, Ahan.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2, Ahan.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3, Ahan.pdf | 20 Oct 2025 |
| Form 2A (FY 2024-2025)File: Ahan.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: Ahan.pdf | 30 Sep 2025 |
| Commencement certificateFile: Further CC dated 28th April 2025.pdf | 16 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Wing C Mar 25.pdf | 20 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3_Ahan.pdf | 19 Apr 2025 |
| Details of encumbrancesFile: Encumbrances Ahan_17042025171553.PDF | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1, Ahan_17042025170850.PDF | 17 Apr 2025 |
| OtherFile: FSI Concession Ahan_17042025172145.PDF | 17 Apr 2025 |
| OtherFile: FSI Concession Ahan_17042025172029.PDF | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ahan_17042025172635 .pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Aranya Wing C Ahan Form 1, December'2024.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Aranya C Wing.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Ahan.pdf | 20 Jan 2025 |
| OtherFile: Ahan.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Piramal Aranya Wing C Ahan Sold Unsold Inventory.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Aranya_Wing C_Ahan Form 2, Sept'2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Aranya_Wing C_Ahan Form 1, Sept'2024.pdf | 18 Oct 2024 |
| Certificates of CA (Form 3)File: Piramal Aranya_Wing C_Ahan Form 3, Sept'2024.pdf | 18 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Piramal Aranya_Wing C_Ahan Form 2A, Sept'2024.pdf | 18 Oct 2024 |
| OtherFile: 02 Piramal Aranya Wing C, FSI Declaration.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 02 Piramal Aranya Wing C, Sold Unsold Inventory.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 C mgt signed.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: Aranya_Ahan_Form 3_June 24.pdf | 24 Jul 2024 |
| Certificates of CA (Form 3)File: A_C_merged.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aranya_Ahan_ Form 2_June 24 (3).pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aranya_Ahan C_Form 2A_June 24.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Aranya Ahan.pdf | 18 Jul 2024 |
| OtherFile: Aranya_Ahan_FSI_June 24.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aranya Ahan .pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Ahan_SoldUnsold.pdf | 4 Jul 2024 |
| OtherFile: Ahan_FsiC_June 24.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: Ahan CA.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: aranya 31-03-24.pdf | 18 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AHAN AC.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: AHAN SOLD UNSOLD.pdf | 16 Apr 2024 |
| OtherFile: AHAN FSI.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan CA.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Ahan 2 CA.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan AC.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Ahan.pdf | 18 Jan 2024 |
| OtherFile: FSI AHAN.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Ahan CA.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf | 18 Oct 2023 |
| Details of encumbrancesFile: Ahan.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan AC.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Ahan Sold Unsold.pdf | 17 Oct 2023 |
| OtherFile: Ahan.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ahan QA.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Aranya - Ahan Wing C.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing C EC.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (4).pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: wING C.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Aranya Wing C.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aranya Wing C.pdf | 14 Jul 2023 |
| OtherFile: Aranya Wing C.pdf | 14 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Aranya Amended CC for C1 45 and C2 26 floor.pdf | 13 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Aranya Ahan.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing C mar 23.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Wing C.pdf | 20 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Aranya.pdf | 14 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing C.pdf | 14 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Ahan Wing C.pdf | 14 Apr 2023 |
| OtherFile: Ahan Wing C.pdf | 14 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31032023 Wing C.pdf | 12 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 180 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Piramal Aranya - Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Byculla East780+ in Mumbai City
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
Piramal Aranya - Wing B
Glider Buildcon Realtors Private Limited
TARABAUG
DARSHAN DEVELOPERS
A. M. Residency
ALFA MANA REALTORS PVT LTD
Piramal Aranya - Ahan 2
Glider Buildcon Realtors Private Limited
10 HARBOUR ESTATES
NAN ENTERPRISES
Piramal Aranya - Wing A
Glider Buildcon Realtors Private Limited
See every Mumbai City project, with the district possession charts
Builder: Glider Buildcon Realtors Private Limited
Glider Buildcon Realtors Private Limited has 4 registrations on MahaRERA, including Piramal Aranya - Wing A and Piramal Aranya - Wing B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if Piramal Aranya - Wing C is delayed beyond 28 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Piramal Aranya - Wing C?
The registered promoter entity is Glider Buildcon Realtors Private Limited, a company as per the filing. Its CIN U70200MH2015PTC265844 and GSTIN 27AAGCG0288B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Piramal Aranya - Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Piramal Aranya - Wing C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Piramal Aranya - Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Piramal Aranya - Wing C?
The professionals named in the filing: Architect: Sandeep Shikre Associates; Engineer: Turner and Townsend Pvt Ltd; Engineer: Kishor Parmar; Chartered Accountant: SRBC & CO LLP; Chartered Accountant: D B Ketkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Piramal Aranya - Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback