ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Piramal Aranya - Wing C

Registered Litigation declared Residential / Group Housing project

Piramal Aranya - Wing C

By Glider Buildcon Realtors Private Limited

RG-MH-03011 · RERA P51900020330 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • 7 complaints at MahaRERA
  • Rs 1,850.00 crore secured on the land, in favour of hdfc bank

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 95%
83 of 337Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 180 documents Report an error

Piramal Aranya - Wing C is a Residential / Group Housing project by Glider Buildcon Realtors Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900020330 on 5 Apr 2019. Possession is promised by 28 Aug 2027. 254 of the 337 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NamePiramal Aranya - Wing C
  • TypeResidential / Group Housing
  • Location
    • Rambhau Bhogle Marg
    • Byculla East
    • Mumbai
    • Byculla East
    • Mumbai City
    • 400010
  • Pincode400010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900020330
  • ReraGenie IDRG-MH-03011

Builder

  • NameGlider Buildcon Realtors Private Limited
  • Entity typeCompany
  • CINU70200MH2015PTC265844
  • GSTIN27AAGCG0288B1ZU
  • DirectorPankaj S Mundada
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2019PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2019
  • Promised completion28 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed180 files

Current status

75%254 of 337 units booked
99.8%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Piramal Aranya - Wing CNA66443370337

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Piramal Aranya - Wing C: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes55%
Street LightingYes55%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed487

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots487
Closed/Covered476
Open Space11

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,086 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofhdfc bank
Secured amountRs 1,850.00 crore
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI27762.0
Proposed, not sanctioned27,762 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManekji Wadia building nanik motwani marg fort mumbai 400023
Estimated costRs 468.66 cr
Cost incurredRs 467.48 cr
Work done99.75%
BuildingWingEstimatedIncurred
Piramal Aranya - Wing CNARs 410.52 crRs 409.34 cr
-NARs 58.14 crRs 58.14 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre Associates
EngineerTurner and Townsend Pvt Ltd
EngineerKishor Parmar
Chartered AccountantSRBC & CO LLP
Chartered AccountantD B Ketkar & Co
PartnerRole in project
Glider Buildcon Realtors Private Limited-

Litigation declared9

CaseCourtStatus
29408/2018Supreme CourtOngoing
CC006000000193444/2020MAHARERA AUTHORITYClosed
CC006000000196722/2021MAHARERA AUTHORITYClosed
CC006000000196734/2021MAHARERA AUTHORITYClosed
1/2019BOMBAY HIGHCOURTClosed
491/2020BOMBAY HIGHCOURTClosed
8300/2023BOMBAY HIGHCOURTOngoing
15438/2019Supreme Court of IndiaOngoing
9859/2024Supreme CourtClosed

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000193444MR. TAUHID AHMED KHAN AND MRS NIKHAT TAUHID KHANGLIDER BUILDCON REALTORS PRIVATE LIMITED15/07/2020
CC006000000196722Abdul Hafiz Mohd. Mumtaz BaigGlider Buildcon Realtors Pvt. Ltd17/04/2021
CC006000000196734Abdul Hakim Mohd. Mumtaz BaigGlider Buildcon Realtors Pvt. Ltd17/04/2021
CC006000000220798Tasneem SadikotGlider Buildcon Realtors Pvt Ltd. c/o Piramal Realty13/04/2022
CC006000000408445GLIDER BUILDCON REALTORS PRIVATE LIMITEDSAYED ANSAR HAIDER11/12/2023
CC12502396Glider Buildcon Realtors Private LimitedNilofer Mohammed Qaiyum Shaikh15/07/2025
SM12500190Bhakti AchrekarGlider Buildcon Realtors Private Limited26/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Aug 2027

Documents filed180

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 180 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 00 Form 2A Aranya Ahan.pdf30 Jun 2026
Commencement certificateFile: Ahan Full OC.pdf20 Apr 2026
Withdrawal Update Form 1File: 01 Form 1 - Ahan Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: 01 Form 2 - Ahan Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: 01 Form 3 - Ahan Mar 26.pdf20 Apr 2026
Withdrawal Update Form 1File: 01 Form 1 - Ahan.pdf20 Jan 2026
Withdrawal Update Form 2File: 01 Form 2 - Ahan.pdf20 Jan 2026
Withdrawal Update Form 3File: 01 Form 3 - Ahan.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1, Ahan - Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2, Ahan - Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 2, Ahan - Sept 2025.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1, Ahan.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2, Ahan.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3, Ahan.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: Ahan.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Ahan.pdf30 Sep 2025
Commencement certificateFile: Further CC dated 28th April 2025.pdf16 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Wing C Mar 25.pdf20 Apr 2025
Certificates of CA (Form 3)File: Form 3_Ahan.pdf19 Apr 2025
Details of encumbrancesFile: Encumbrances Ahan_17042025171553.PDF17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1, Ahan_17042025170850.PDF17 Apr 2025
OtherFile: FSI Concession Ahan_17042025172145.PDF17 Apr 2025
OtherFile: FSI Concession Ahan_17042025172029.PDF17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ahan_17042025172635 .pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Aranya Wing C Ahan Form 1, December'2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Aranya C Wing.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Ahan.pdf20 Jan 2025
OtherFile: Ahan.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Piramal Aranya Wing C Ahan Sold Unsold Inventory.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Aranya_Wing C_Ahan Form 2, Sept'2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Aranya_Wing C_Ahan Form 1, Sept'2024.pdf18 Oct 2024
Certificates of CA (Form 3)File: Piramal Aranya_Wing C_Ahan Form 3, Sept'2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Piramal Aranya_Wing C_Ahan Form 2A, Sept'2024.pdf18 Oct 2024
OtherFile: 02 Piramal Aranya Wing C, FSI Declaration.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 02 Piramal Aranya Wing C, Sold Unsold Inventory.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 C mgt signed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Aranya_Ahan_Form 3_June 24.pdf24 Jul 2024
Certificates of CA (Form 3)File: A_C_merged.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aranya_Ahan_ Form 2_June 24 (3).pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aranya_Ahan C_Form 2A_June 24.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Aranya Ahan.pdf18 Jul 2024
OtherFile: Aranya_Ahan_FSI_June 24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aranya Ahan .pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: Ahan_SoldUnsold.pdf4 Jul 2024
OtherFile: Ahan_FsiC_June 24.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf19 Apr 2024
Certificates of CA (Form 3)File: Ahan CA.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: aranya 31-03-24.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AHAN AC.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: AHAN SOLD UNSOLD.pdf16 Apr 2024
OtherFile: AHAN FSI.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan CA.pdf20 Jan 2024
Certificates of CA (Form 3)File: Ahan 2 CA.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan AC.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ahan.pdf18 Jan 2024
OtherFile: FSI AHAN.pdf16 Jan 2024
Certificates of CA (Form 3)File: Ahan CA.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ahan EC.pdf18 Oct 2023
Details of encumbrancesFile: Ahan.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ahan AC.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Ahan Sold Unsold.pdf17 Oct 2023
OtherFile: Ahan.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ahan QA.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Aranya - Ahan Wing C.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing C EC.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (4).pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: wING C.pdf20 Jul 2023
Certificates of CA (Form 3)File: Aranya Wing C.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aranya Wing C.pdf14 Jul 2023
OtherFile: Aranya Wing C.pdf14 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Aranya Amended CC for C1 45 and C2 26 floor.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: Aranya Ahan.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing C mar 23.pdf20 Apr 2023
Certificates of CA (Form 3)File: Wing C.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Aranya.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing C.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: Ahan Wing C.pdf14 Apr 2023
OtherFile: Ahan Wing C.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31032023 Wing C.pdf12 Apr 2023

How this compares with Mumbai City

75%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Piramal Aranya - Wing C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Byculla East780+ in Mumbai City

2 kmPiramal Aranya - Wing CCompleted 7Lapsed / revoked 27Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Glider Buildcon Realtors Private Limited

Glider Buildcon Realtors Private Limited has 4 registrations on MahaRERA, including Piramal Aranya - Wing A and Piramal Aranya - Wing B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Piramal Aranya - Wing C is delayed beyond 28 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Piramal Aranya - Wing C?

The registered promoter entity is Glider Buildcon Realtors Private Limited, a company as per the filing. Its CIN U70200MH2015PTC265844 and GSTIN 27AAGCG0288B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Piramal Aranya - Wing C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Piramal Aranya - Wing C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Piramal Aranya - Wing C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Piramal Aranya - Wing C?

The professionals named in the filing: Architect: Sandeep Shikre Associates; Engineer: Turner and Townsend Pvt Ltd; Engineer: Kishor Parmar; Chartered Accountant: SRBC & CO LLP; Chartered Accountant: D B Ketkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Piramal Aranya - Wing C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Piramal Aranya - Wing C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Piramal Aranya - Wing C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.