Home / Browse projects / TARABAUG
TARABAUG
RG-MH-26941 · RERA P51900008495 · Last updated on MahaRERA portal: 18 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 72 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TARABAUG is a Residential / Group Housing project by DARSHAN DEVELOPERS in 400010, registered with MahaRERA as P51900008495 on 19 Aug 2017. Possession is promised by 31 Dec 2032. The completion date has moved by 72 months from the original filing. 103 of the 453 units on this registration are recorded sold or booked, and 38 of 88 construction stages are filed complete.
At a glance
Project
- NameTARABAUG
- TypeResidential / Group Housing
- Location
- MOTISHAH LANE
- 400010
- Pincode400010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900008495
- ReraGenie IDRG-MH-26941
Builder
- NameDARSHAN DEVELOPERS
- Entity typePartnership
- PartnersMOHANLAL O JAIN, DALPATRAJ P JAIN
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion31 Dec 2032
- Revised completionRevised to 31 Dec 2032 (originally 30 Dec 2026)
- Buildings8 building records
- Documents filed96 files
Current status
Figures as on 18 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RUSHABH | NA | 30 | 28 | 107 | 0 | 107 |
| RUSHABH 2 | NA | 24 | 23 | 44 | 0 | 44 |
| BUILDING NO 3 | NA | 4 | 4 | 40 | 0 | 40 |
| GANESH DARSHAN | NA | 9 | 7 | 56 | 0 | 56 |
| PARSHWA DARSHAN | NA | 8 | 7 | 26 | 0 | 26 |
| BUILDING NO 6 | NA | 4 | 1 | 0 | 9 | 9 |
| BUILDING NO 7 | NA | 3 | 3 | 10 | 1 | 11 |
| Parking Structure | NA | 16 | 16 | 160 | 0 | 160 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
38 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
RUSHABH82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RUSHABH 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GANESH DARSHAN82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PARSHWA DARSHAN73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 652%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Parking Structure0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 57% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 57% |
| Storm Water Drains | Yes | 57% |
| Landscaping & Tree Planting | Yes | 29% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 57% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 29% |
| Electrical meter room, sub-station, receiving station | Yes | 57% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RUSHABH | 8 | 8 |
| RUSHABH 2 | 5 | 5 |
| GANESH DARSHAN | 1 | 1 |
| PARSHWA DARSHAN | 1 | 1 |
| Parking Structure | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RUSHABH | NA | Rs 5.46 cr | Rs 4.19 cr |
| RUSHABH 2 | NA | Rs 5.46 cr | Rs 4.19 cr |
| BUILDING NO 3 | NA | Rs 5.46 cr | Rs 4.19 cr |
| GANESH DARSHAN | NA | Rs 5.46 cr | Rs 4.19 cr |
| PARSHWA DARSHAN | NA | Rs 5.46 cr | Rs 4.19 cr |
| BUILDING NO 6 | NA | Rs 5.46 cr | Rs 4.19 cr |
| BUILDING NO 7 | NA | Rs 5.46 cr | Rs 4.19 cr |
| - | NA | Rs 2.01 cr | Rs 1.87 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PAGNIS & PAGNI |
| Engineer | SK Consultants & Engineers |
| Engineer | Pravin Gala Consultants Pvt Ltd |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | N B Sayed & Associates |
| Partner | Role in project |
|---|---|
| DARSHAN DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Darshan Developers, the promoter of the project TARABAUG (Registration No. P51900008495) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to ongoing litigations between the developer, tenants, and landowners, which have adversely affected the pace and progress of the project. These disputes have significantly impacted construction activities and led to delays in execution. Further, certain litigations are still pendi
Litigation declared13
| Case | Court | Status |
|---|---|---|
| 10549/2017 | Supreme Court of India | Disposed off but an Interim Application has been filed by the respondents for Modification of Order |
| 953/2017 | Supreme Court of India | Ad Interim Stage |
| 802/2015 | Bombay High Court | For Admission Interim Stage |
| 1700/2017 | Bombay High Court | Pre Admission Ad Interim Stage |
| 848/2013 | Bombay High Court | For Written Statement |
| 790/2016 | Bombay High Court | Hearing and Final Disposal |
| 1864/2016 | Bombay High Court | Hearing and Final Disposal |
| 46/2016 | Bombay High Court | Hearing and Final Disposal |
| 3400/2016 | City Civil Court | Notice of Motion Hearing |
| 858/2017 | Bombay High Court | Pre Admission Ad Interim Stage |
| 9053/2015 | Bombay High Court | Hearing and Final Disposal |
| 200710/2009 | Small Causes Court | Further Cross Examination |
| 1782/2010 | Bombay High Court | Hearing and Arguments |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2032
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on June 2026_compressed.pdf | 18 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on June 2026.pdf | 18 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug as on June 2026.pdf | 18 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on June 2026_compressed.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on June 2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug as on June 2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on Dec 2025.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on Dec 25.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug- as on June 2025.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug as on Sept 25.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug as on December 2025.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Tarabaug as on 31st March 2026.pdf | 21 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 2029-2025-16-18.pdf | 21 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf | 21 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-25-1-3.pdf | 21 Apr 2026 |
| Certificates of CA (Form 3)File: Form 3 - Tarabaug as on Dec 2024.pdf | 17 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tarabaug as on Dec 2024.pdf | 17 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Tarabaug as on March 2024.pdf | 24 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 - Tarabaug as on June 2024.pdf | 24 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 - Tarabaug as on Sep 2024.pdf | 24 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tarabaug as on March 2024.pdf | 24 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tarabaug as on June 2024.pdf | 24 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tarabaug as on Sep 2024.pdf | 24 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 16 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: 18 Certificates of CA (Form 3).pdf | 16 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Tarabaug Dec 23.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Tarabaug- Dec 23.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - Tarabaug FY 17-18.pdf | 17 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Tarabaug FY 18-19.pdf | 17 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Tarabaug FY 19-20.pdf | 17 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Tarabaug FY 20-21.pdf | 17 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Tarabaug FY 21-22.pdf | 17 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug June 23 - Form 2.pdf | 20 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Sept 23 - Form 2.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- June 23.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Sept 23.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Tarabaug as on 2022-23.pdf | 30 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 18 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 19 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 20 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 21 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Dec 21 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 22 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug June 22 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Sept 22 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Dec 22 - Form 2.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tarabaug Mar 23 - Form 2.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Tarabaug Mar 18 - Form 2.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Tarabaug Mar 19 - Form 2.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Tarabaug Mar 20 - Form 2.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Tarabaug Mar 21 - Form 2.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- March 2018.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- March 2019.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- March 2020.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- March 2021.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Dec 2021.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Mar 2022.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- June 2022.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Sept 2022.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Dec 2022.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: New Form 3 - Tarabaug- Mar 2023 New.pdf | 20 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: img071.pdf | 16 Jan 2020 |
| Layout approvalFile: layout plan.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 1 AND 2.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 3.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 4.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 5.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 7.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD 6.pdf | 31 Jul 2017 |
| PAN CardFile: Darshan Developer PAN.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate Tarabaug.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Non-Encumbrance Certificate RERA.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TARABAUG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
Piramal Aranya - Wing B
Glider Buildcon Realtors Private Limited
A. M. Residency
ALFA MANA REALTORS PVT LTD
Piramal Aranya - Wing C
Glider Buildcon Realtors Private Limited
Piramal Aranya - Ahan 2
Glider Buildcon Realtors Private Limited
10 HARBOUR ESTATES
NAN ENTERPRISES
Piramal Aranya - Wing A
Glider Buildcon Realtors Private Limited
Builder: DARSHAN DEVELOPERS
DARSHAN DEVELOPERS has 2 registrations on MahaRERA, including TARABAUG and DARSHAN DEVELOPERS. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if TARABAUG is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TARABAUG?
The registered promoter entity is DARSHAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TARABAUG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TARABAUG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TARABAUG?
The professionals named in the filing: Architect: PAGNIS & PAGNI; Engineer: SK Consultants & Engineers; Engineer: Pravin Gala Consultants Pvt Ltd; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TARABAUG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback