Red flags
- 10 complaints at MahaRERA
- Rs 2,300.00 crore secured on the land, in favour of HDFC BANK, ICICI BANK
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Piramal Aranya - Wing A is a Others project by Glider Buildcon Realtors Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900003324 on 5 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. 148 of the 229 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 10 complaints are on record with the regulator.
At a glance
Project
- NamePiramal Aranya - Wing A
- TypeOthers
- Location
- Rambhau Bhogale Marg
- Byculla East
- Mumbai City
- 400010
- Pincode400010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900003324
- ReraGenie IDRG-MH-24086
Builder
- NameGlider Buildcon Realtors Private Limited
- Entity typeCompany
- CINU70200MH2015PTC265844
- GSTIN27AAGCG0288B1ZU
- DirectorPankaj S Mundada
- Other registrations3 more →
- Completed1 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Aug 2017
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed149 files
Current status
Figures as on 17 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AVYAN | NA | 67 | 0 | 229 | 0 | 229 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
AVYAN: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed506
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AVYAN | NA | Rs 390.32 cr | Rs 390.32 cr |
| - | NA | Rs 16.93 cr | Rs 16.93 cr |
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Glider Buildcon Realtors Private Limited | - |
Litigation declared10
| Case | Court | Status |
|---|---|---|
| 29408/2018 | Supreme Court | Pending |
| CC006000000171890/2020 | MAHARERA AUTHORITY | Disposed off |
| 1/2019 | BOMBAY HIGHCOURT | Dismissed |
| 491/2020 | BOMBAY HIGHCOURT | disposed off |
| CC006000000198423/2021 | MAHARERA AUTHORITY | Pending for Hearing |
| AT006000000083879/2022 | MAHARERA APPELLATE TRIBUNAL | Pending for hearing |
| AT006000000134070/2022 | MAHARERA APPELLATE TRIBUNAL | ONGOING |
| 8300/2023 | BOMBAY HIGHCOURT | ONGOING |
| 15438/2019 | Supreme Court of India | Ongoing |
| 9859/2024 | Supreme Court | Pending for hearing |
Complaints filed with MahaRERA10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198764 | Murtaza Abbas Kagalwala | Glider Buildcon Realtors Pvt. Ltd. | 21/10/2021 |
| CC006000000171890 | Pravin Sawant | Glider Buildcon Realtors Private Limited | 16/12/2019 |
| CC006000000194792 | Inderjeet | Glider Buildcon Realtors Pvt. Ltd. | 03/11/2020 |
| CC006000000195198 | Balkrishna Solanki | Piramal Realty Pvt. Ltd. | 25/02/2021 |
| CC006000000221023 | Balkrishna Solanki | Piramal Realty Pvt. Ltd through its directors Ms sarita Jitendra | 01/05/2022 |
| CC006000000198423 | Ravi Madhusudan Mehta | Glider Buildcon Realtors Private Limited | 22/09/2021 |
| CC006000000209514 | Samir Sayed | Glider Buildcon Realtors Pvt Ltd | 28/07/2022 |
| CC006000000591443 | Shreyas Rajkumar Nagdawane | Glider Buildcon Realtors Private Limited | 06/08/2024 |
| CC12400096 | Siraj Jaorawala | Glider Buildcon Realtors Private Limited | 13/09/2024 |
| CC12503219 | KIRANBALA RAMGOPAL CHOUHAN | Glider Buildcon Realtors Private Limited | 11/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2023
Documents filed149
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrancesFile: Encumbrances Avyan_17042025171617.PDF | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 wing A mgt signed.pdf | 7 Oct 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Piramal Aranya.pdf | 19 Jan 2024 |
| Details of encumbrancesFile: Avyan.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Aranya - Avyan Wing A.pdf | 29 Sep 2023 |
| Certificates of CA (Form 3)File: Aranya Wing A CA .pdf | 31 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wing A.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Aranya Wing A.pdf | 20 Jul 2023 |
| Details of encumbrancesFile: Aranya Avyan enc.pdf | 14 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A.pdf | 14 Jul 2023 |
| OtherFile: Aranya Wing A.pdf | 14 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Aranya Avyan.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wing A Mar 23.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Wing A.pdf | 20 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Aranya wing A.pdf | 20 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Aranya Form 4.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing A.pdf | 14 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing A.pdf | 14 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Avyan Wing A.pdf | 14 Apr 2023 |
| OtherFile: Aranya Wing A.pdf | 14 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Aranya Wing A CHS.pdf | 12 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Sep 18.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: Mar 19 Aranya Wing A.pdf | 29 Mar 2023 |
| Certificates of CA (Form 3)File: CA certificate Sept 18.pdf | 28 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Aranya Wing A.pdf | 27 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 19 Aranya Wing A.pdf | 25 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 18 Aranya Wing A compressed.pdf | 25 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A Dec 18.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 3 Certificates of CA (Form 5).pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 18.pdf | 27 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Byculla_Aranya Wing A.pdf | 27 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate_Aranya Wing A.pdf | 27 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A Dec 19.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing A Mar 20.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A Sep 20.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A Dec 20.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WING A Sep 19.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate_Aranya Wing A.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Aranya Wing A_Sep'19.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Aranya Wing CA Certificate.PDF | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Wing A.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Wing A Aranya.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: Wing A.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya_Wing A Mar 21.pdf | 7 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya_Wing A Jul 21.pdf | 7 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya_Wing A Sep 21.pdf | 7 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Aranya Wing A.pdf | 16 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wing A.pdf | 16 Jan 2023 |
| Certificates of CA (Form 3)File: CA Cert Aranya Wing A Avyan.pdf | 16 Jan 2023 |
| OtherFile: FSI Concession Aranya Wing A.pdf | 16 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Avyan.pdf | 14 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aranya - Wing A.pdf | 18 Oct 2022 |
| Certificates of CA (Form 3)File: Aranya Wing A_merged.pdf | 18 Oct 2022 |
| OtherFile: Aranya Wing A.pdf | 17 Oct 2022 |
| OtherFile: Aranya Wing A.pdf | 17 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A.pdf | 14 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aranya Wing A.pdf | 14 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aranya Wing A.pdf | 13 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Aranya Wing A - Avyan.pdf | 13 Oct 2022 |
| Details of encumbrancesFile: Aranya Wing A Encumbrance.pdf | 12 Oct 2022 |
| Details of encumbrancesFile: Aranya Wing A Encumbrances.pdf | 12 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aranya - Avyan Wing A_Form 5_FY2021-22.pdf | 30 Sep 2022 |
| Declaration about Commencement CertificateFile: cc declaration.pdf | 7 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ac a000.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ec a.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: ec a.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: ca a000.pdf | 7 Jul 2022 |
| OtherFile: fsi a000.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: avyan ec001.pdf | 7 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: avyan ec001.pdf | 7 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC Avyan.pdf | 7 Apr 2022 |
| CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200077653821_For_Registration_Of_Security_Interest_07_04_2022 | 7 Apr 2022 |
| Certificates of CA (Form 3)File: ca avyan.pdf | 7 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 3022022.pdf | 6 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SSA Architect certificate_Aranya_Wing A (Avyan)_01042022.pdf | 6 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC AR WING A.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AR AVYAN.pdf | 6 Apr 2022 |
| OtherFile: FSI AR WING A.pdf | 6 Apr 2022 |
| Details of encumbrancesFile: ARANYA WING A ENCUMBRANCE .pdf | 7 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC for Wing C1 upto 26 floor.pdf | 7 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 149 filed documents as one ZIP, foldered, with a manifest
Keep Piramal Aranya - Wing A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Byculla East780+ in Mumbai City
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
Piramal Aranya - Wing B
Glider Buildcon Realtors Private Limited
TARABAUG
DARSHAN DEVELOPERS
A. M. Residency
ALFA MANA REALTORS PVT LTD
Piramal Aranya - Wing C
Glider Buildcon Realtors Private Limited
Piramal Aranya - Ahan 2
Glider Buildcon Realtors Private Limited
10 HARBOUR ESTATES
NAN ENTERPRISES
See every Mumbai City project, with the district possession charts
Builder: Glider Buildcon Realtors Private Limited
Glider Buildcon Realtors Private Limited has 4 registrations on MahaRERA, including Piramal Aranya - Wing A and Piramal Aranya - Wing B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if Piramal Aranya - Wing A is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Piramal Aranya - Wing A?
The registered promoter entity is Glider Buildcon Realtors Private Limited, a company as per the filing. Its CIN U70200MH2015PTC265844 and GSTIN 27AAGCG0288B1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Piramal Aranya - Wing A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Piramal Aranya - Wing A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Piramal Aranya - Wing A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Piramal Aranya - Wing A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback