Home / Browse projects / Pune, Maharashtra / Pinnacle Neelanchal Phase III

Registration lapsed No litigation declared Residential / Group Housing project

Pinnacle Neelanchal Phase III

By Pinnacle Vastunirman Private Limited

RG-MH-36259 · RERA P52100047091 · Last updated on MahaRERA portal: 12 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 24 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
1 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 80%
200 of 288Units unsoldnot recorded sold or booked
24Complaints at MahaRERAon this registration
Jump to the 220 documents Report an error

Pinnacle Neelanchal Phase III is a Residential / Group Housing project by Pinnacle Vastunirman Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100047091 on 3 Oct 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 88 of the 288 units on this registration are recorded sold or booked, and 1 of 33 construction stages are filed complete. 24 complaints are on record with the regulator.

At a glance

Project

  • NamePinnacle Neelanchal Phase III
  • TypeResidential / Group Housing
  • Location
    • Vibgyor School Road
    • Sus
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • RERA no.P52100047091
  • ReraGenie IDRG-MH-36259

Builder

  • NamePinnacle Vastunirman Private Limited
  • Entity typeCompany
  • DirectorsRohan Gajendra Pawar, Gajendra Dattatraya Pawar

Key dates

10 months past promisethis monthRegisteredOct 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Oct 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed220 files

Current status

31%88 of 288 units booked
4.4%Work done, per cost certificate

Figures as on 12 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Pinnacle Neelanchal Phase III Wing FNA141496096
Pinnacle Neelanchal Phase III Wing GNA141496096
Pinnacle Neelanchal Phase III Wing HNA14096096

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 80%.

Pinnacle Neelanchal Phase III Wing F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Pinnacle Neelanchal Phase III Wing G7%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Pinnacle Neelanchal Phase III Wing H5%
ActivityProgress
Excavation55%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed376

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots376
Closed/Covered94
Open Space282
BuildingClosed/CoveredOpen SpaceTotal
Pinnacle Neelanchal Phase III Wing F3194125
Pinnacle Neelanchal Phase III Wing G3194125
Pinnacle Neelanchal Phase III Wing H3294126

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,989 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
Pinnacle Vastunirman Private LimitedPune (M Corp.)Pune
G. P. Corporation LLPPune (M Corp.)Pune
G. P. RealtyPune (M Corp.)Pune
Landlord Properties Pvt. Ltd.Pune (M Corp.)Pune
Navnath Tanaji ChanderePune (M Corp.)Pune
Purnima Navnath ChanderePune (M Corp.)Pune
Siddhi Navnath ChanderePune (M Corp.)Pune
Aditya Navnath ChanderePune (M Corp.)Pune
Parubai Tanaji ChanderePune (M Corp.)Pune
Anil Tanaji ChanderePune (M Corp.)Pune
Manisha Anil ChanderePune (M Corp.)Pune
Shivraj Anil ChanderePune (M Corp.)Pune
Riddhi Anil ChanderePune (M Corp.)Pune
Tanaji Shivram ChanderePune (M Corp.)Pune
Rahul Nayan BhaleraoPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY PUNE
Permissible FSI25618.68
Proposed, not sanctioned25,619 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHdfc Bank Ltd, Ruby House, Kharadi Magarpatta Bye Pass, Pune Maharashtra 411014
Estimated costRs 86.06 cr
Cost incurredRs 3.77 cr
Work done4.38%
BuildingWingEstimatedIncurred
Pinnacle Neelanchal Phase III Wing FNARs 26.88 crRs 51.03 lakh
Pinnacle Neelanchal Phase III Wing GNARs 26.88 crRs 51.03 lakh
Pinnacle Neelanchal Phase III Wing HNARs 26.88 crRs 51.03 lakh
-NARs 5.42 crRs 2.24 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHrishikesh Kulkarni
EngineerMahesh Sidramappa Mashalkar
EngineerRANJIT DHOBALE
Chartered AccountantCA Nikita A. Bajaj
Chartered AccountantVIDHI S SHAH AND ASSOCIATES
PartnerRole in project
Pinnacle Vastunirman Private Limited-

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC12401215Soaniya MalempatiPinnacle Vastunirman Private Limited24/12/2024
CC12401208Soaniya MalempatiPinnacle Vastunirman Private Limited23/12/2024
CC12501989Mayur Vishwanath SuryawanshiPinnacle Vastunirman Private Limited18/06/2025
CC12502814Vikash KumarPinnacle Vastunirman Private Limited11/08/2025
CC12502813Piyush Kumar PathakPinnacle Vastunirman Private Limited11/08/2025
CC12504443BHUSHAN VASANT NAGTODEPinnacle Vastunirman Private Limited13/12/2025
CC12504444Kalyani SharmaPinnacle Vastunirman Private Limited13/12/2025
CC12600849Sumit Manohar ThakPinnacle Vastunirman Private Limited15/02/2026
CC12504570Ganesh Janardan MahadikPinnacle Vastunirman Private Limited22/12/2025
CC12600013MAHESH PRALHAD WARALEPinnacle Vastunirman Private Limited01/01/2026
CC12504725Sanish KumarPinnacle Vastunirman Private Limited31/12/2025
CC12600509Sanket KapsePinnacle Vastunirman Private Limited29/01/2026
CC12600319Sandhya Sachin RaskarPinnacle Vastunirman Private Limited17/01/2026
CC12600555Gaurav KatdarePinnacle Vastunirman Private Limited01/02/2026
CC12600563Pritam PatilPinnacle Vastunirman Private Limited01/02/2026
CC12600667Raju PatelPinnacle Vastunirman Private Limited05/02/2026
CC12600733Ragini Satish DeshpandePinnacle Vastunirman Private Limited08/02/2026
CC12601686Sudha Shefali MishraPinnacle Vastunirman Private Limited24/03/2026
CC12601945Amita Akshay DongarePinnacle Vastunirman Private Limited02/04/2026
CC12601528Pawan KumarPinnacle Vastunirman Private Limited20/03/2026
CC12601726Ajay Kumar HiwarkarPinnacle Vastunirman Private Limited25/03/2026
CC12602160Pravin Samadhan ZadokarPinnacle Vastunirman Private Limited12/04/2026
CC12602075Ashwini Ashutosh DesaiPinnacle Vastunirman Private Limited09/04/2026
CC12602152RAJASHRI DESHPANDEPinnacle Vastunirman Private Limited12/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed220

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 220 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: 2022-23.pdf12 Feb 2026
Form 5 (FY 2023-2024)File: 2023-24.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: 2024-25.pdf12 Feb 2026
Form 2A (FY 2022-2023)File: Q4 FY 2022-23.pdf11 Feb 2026
Form 2A (FY 2023-2024)File: Q4 FY 2023-24.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Q4 FY 2024-25.pdf11 Feb 2026
Withdrawal Update Form 1File: FORM 1_compressed (1) (1).pdf6 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 Signed Phase III Q3_compressed.pdf6 Feb 2026
Withdrawal Update Form 1File: FORM 1 Q1 FY 2025-26_compressed.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM 1 Q2 FY 2025-26.pdf29 Jan 2026
Withdrawal Update Form 2File: FORM2 Q1 FY 2025-26.pdf29 Jan 2026
Withdrawal Update Form 2File: FORM 2 Q2 FY 2025-26.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q1 FY 2025 26_compressed.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q1 FY 2025 26_compressed.pdf29 Jan 2026
Form 1File: FORM 1 Q1 23 24.pdf28 Jan 2026
Form 2File: FORM 2 Q1 FY 2023-24.pdf28 Jan 2026
Form 3File: FORM 3 Q1 23 24_compressed.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q1.pdf28 Jan 2026
Form 1File: FORM 1 Q2 FY 2023-24.pdf28 Jan 2026
Form 2File: FORM 2 Q2 FY 2023-24.pdf28 Jan 2026
Form 3File: FORM3 PH 3 Q2 23 24_compressed.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q2 23-24.pdf28 Jan 2026
Form 1File: FORM 1 Q4 FY 2023-24.pdf28 Jan 2026
Form 2File: FORM 2 Q4 FY 2023-24.pdf28 Jan 2026
Form 3File: FORM3 PH 3 Q4 23-24_compressed.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 23-24.pdf28 Jan 2026
Form 1File: FORM 1 Q3 FY 2022-23.pdf28 Jan 2026
Form 2File: FORM 2 Q3 FY 2022-23.pdf28 Jan 2026
Form 3File: FORM3 PH 3 Q3 22-23_compressed.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q3_compressed.pdf28 Jan 2026
Form 1File: FORM 1 Q4 FY 2022-23.pdf28 Jan 2026
Form 2File: FORM 2 Q4 FY 2022-23.pdf28 Jan 2026
Form 3File: FORM3 PH 3 Q4 22-23_compressed.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 22-23.pdf28 Jan 2026
Form 1File: FORM 1 Q3 FY 2023-24.pdf23 Jan 2026
Form 2File: FORM 2 Q3 FY 2023-24.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD Q3 FY 2023-24.pdf23 Jan 2026
Form 3File: FORM 3 Q3 FY 2023-24.pdf23 Jan 2026
Form 1File: FORM 1 Q1 FY 2024-25.pdf23 Jan 2026
Form 2File: FORM 2 Q1 FY 2024-25.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD Q1 FY 2024-25.pdf23 Jan 2026
Form 3File: FORM 3 Q1 FY 2024-25_compressed.pdf23 Jan 2026
Form 1File: FORM 1 Q2 FY 2024-25.pdf23 Jan 2026
Form 2File: FORM 2 Q2 FY 2024-25.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD Q2 FY 2024-25.pdf23 Jan 2026
Form 3File: FORM 3 Q2 FY 2024-25_compressed.pdf23 Jan 2026
Form 1File: FORM 1 Q3 FY 2024-25.pdf23 Jan 2026
Form 2File: FORM 2 Q3 FY 2024-25.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD Q3 FY 2024-25.pdf23 Jan 2026
Form 3File: FORM 3 Q3 FY 2024-25_compressed.pdf23 Jan 2026
Form 1File: FORM 1 Q4 FY 2023-24.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD Q4 FY 2024-25.pdf23 Jan 2026
Form 2File: FORM 2 Q4 FY 2024-25.pdf23 Jan 2026
Form 3File: FORM 3 Q4 FY 2024-25_compressed.pdf23 Jan 2026
Copy of the legal title reportFile: Neelanchal Format A.pdf13 Sep 2022
Copy of the legal title reportFile: 2016 Title Search Report 21A 2.pdf13 Sep 2022
Copy of the legal title reportFile: 2016 Title Search Report 21A 1.pdf13 Sep 2022
Copy of the legal title reportFile: 2.pdf13 Sep 2022
Copy of the legal title reportFile: 4.pdf13 Sep 2022
Copy of the legal title reportFile: 5.pdf13 Sep 2022
Copy of the legal title reportFile: 6.pdf13 Sep 2022
Copy of the legal title reportFile: 7.pdf13 Sep 2022
Copy of the legal title reportFile: 8.pdf13 Sep 2022
Copy of the legal title reportFile: 8.pdf13 Sep 2022
Copy of the legal title reportFile: 8.pdf13 Sep 2022
Copy of the legal title reportFile: 8.pdf13 Sep 2022
Copy of the legal title reportFile: 2016 Title Search.pdf13 Sep 2022
Copy of the legal title reportFile: 2016 Title Search 21 B.pdf13 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf2 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS FINAL.pdf2 Sep 2022
Details of encumbrances concerned to FinanceFile: Details of Encubrance certifcate Finance.pdf23 Aug 2022
Details of encumbrances concerned to LegalFile: Details of Encubrance certifcate legal.pdf23 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (1).pdf23 Aug 2022
Proforma of Allotment letterFile: AFS.pdf23 Aug 2022
Proforma of Allotment letterFile: Allotment Letter-Pinnacle Neelanchal Phase III.pdf23 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Account.pdf29 Jul 2022
Layout approvalFile: 1.pdf28 Jul 2022
Layout approvalFile: 2.pdf28 Jul 2022

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pinnacle Neelanchal Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sus13,700+ in Pune

Builder: Pinnacle Vastunirman Private Limited

Pinnacle Vastunirman Private Limited has 1 registration on MahaRERA, including Pinnacle Neelanchal Phase III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Pinnacle Neelanchal Phase III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Pinnacle Neelanchal Phase III is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pinnacle Neelanchal Phase III?

The registered promoter entity is Pinnacle Vastunirman Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pinnacle Neelanchal Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pinnacle Neelanchal Phase III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pinnacle Neelanchal Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pinnacle Neelanchal Phase III?

The professionals named in the filing: Architect: Hrishikesh Kulkarni; Engineer: Mahesh Sidramappa Mashalkar; Engineer: RANJIT DHOBALE; Chartered Accountant: CA Nikita A. Bajaj; Chartered Accountant: VIDHI S SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pinnacle Neelanchal Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pinnacle Neelanchal Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pinnacle Neelanchal Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.