Home / Browse projects / Pune, Maharashtra / PERCEPT BOUNTY 4
PERCEPT BOUNTY 4
By PRIME ESTATE
RG-MH-16677 · RERA P52100027522 · Last updated on MahaRERA portal: 26 Oct 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PERCEPT BOUNTY 4 is a Others project by PRIME ESTATE in Pune, Maharashtra, registered with MahaRERA as P52100027522 on 14 Dec 2020. Possession was promised by 1 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NamePERCEPT BOUNTY 4
- TypeOthers
- Location
- PLOT NO 103 AND 104 SUEVEY NO 1
- VADGAONSHERI
- VADGAONSHERI
- Pune (M Corp.)
- Pune City
- Pune
- 411014
- Pincode411014
- RERA no.P52100027522
- ReraGenie IDRG-MH-16677
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Dec 2020
- Promised completion1 Jun 2025
- Revised completionRevised to 1 Jun 2025 (originally 1 Jun 2024)
- Buildings1 building record
- Documents filed94 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PERCEPT BOUNTY 4 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
PERCEPT BOUNTY 4: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 26 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ARVIND VASUDEV GHOGALE | Nashik (M Corp.) | Nashik |
| ASHOK SHINDE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR GANESH BHAGWAT |
| Engineer | ER NAVNATH JARAG |
| Chartered Accountant | SPCM AND ASSOCIATES |
| Chartered Accountant | CA NIKITA A BAJAJ |
| Partner | Role in project |
|---|---|
| PRIME ESTATE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Prime Estate i.e., promoter of the Project PERCEPT BOUNTY 4 holding MahaRERA Registration No. P52100027522, hereby apply for revision in the project completion date. The erstwhile project completion date was 01/06/2024, however, the same seems to be unachievable due to reasons beyond our control such as: 1. Non-availability of Skilled Labour; 2. Non-availability of Requisite Material; 3. Overall distress caused due to COVID-19 pandemic; 4. Unforeseen Lockdown Conditions. 5. Insufficient Cash flow and funds due to untimely payments of the Allottees Further, as on date, the project is 90% Co
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000106636 | RAHUL ANIL LALA | Mithesh Bhiyani | 18/02/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (10).pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory.pdf | 26 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 26 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 BOUNTY 4.pdf | 18 Oct 2024 |
| Declaration in FORM BFile: Form B PB4_compressed.pdf | 29 Jun 2024 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 29 Jun 2024 |
| CERSAI detailsFile: CERSAI DECLARATION PB4.pdf | 29 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A MB.pdf | 29 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A PB.pdf | 29 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 BOUNTY 4_compressed.pdf | 29 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf | 29 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q1.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q2.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q3.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q4.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q1.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q2.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q3.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Q4.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A Q1.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A Q2.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A Q3.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A Q4.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q1.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: PB4 Sold Unsold Q2.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q3.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q4.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED Compressed.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 6 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 6 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 6 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 6 Jun 2024 |
| Layout approvalFile: Layout Plan.pdf | 11 Jan 2024 |
| Building plan approvalFile: Layout Plan.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Plan.pdf | 11 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: PB 4 Commencement Certificates.pdf | 11 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PERCEPT BOUNTY 4 FORM 5 SIGNED.pdf | 18 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE B4.pdf | 21 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 B4.pdf | 21 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A B4.pdf | 21 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 - Q2 - B4_compressed.pdf | 21 Oct 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE NEW MODIFIED 21-9.pdf | 26 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-B-4.pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BOUNTY 4 FORM 2.pdf | 11 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: BOUNTY 4 FORM 2A.pdf | 11 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B4 FORM 3.pdf | 11 Jul 2022 |
| Proforma of Allotment letterFile: Bounty 4 RERA Agreement NEW.pdf | 27 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Prime Estates -Form 2A.pdf | 7 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Bounty 4.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 B4.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 B4.pdf | 6 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A B4.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold bounty 4_compressed.pdf | 6 Apr 2022 |
| Proforma of Allotment letterFile: Bounty 4 RERA Agreement.pdf | 26 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNED FORM 5 BOUNTY 4.pdf | 12 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Bounty 4.pdf | 7 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BOUNTY 4.pdf | 7 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Prime Estate.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Bounty 4.pdf | 7 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: bounty 4 signed form.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 7 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf | 7 Oct 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE - Prime Estates-BOUNTY 4.pdf | 29 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 BOUNTY 4.pdf | 24 Sep 2021 |
| Declaration in FORM BFile: PB 4 form B Mitesh Bhayani.pdf | 11 Dec 2020 |
| Declaration in FORM BFile: PB 4 form B Purvi Bhayani.pdf | 11 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PERCEPT BOUNTY 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VADGAONSHERI13,700+ in Pune
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: PRIME ESTATE
PRIME ESTATE has 2 registrations on MahaRERA, including PERCEPT BOUNTY 3 and PERCEPT BOUNTY 4. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that PERCEPT BOUNTY 4 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PERCEPT BOUNTY 4 is delayed beyond 1 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PERCEPT BOUNTY 4?
The registered promoter entity is PRIME ESTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PERCEPT BOUNTY 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PERCEPT BOUNTY 4?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PERCEPT BOUNTY 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PERCEPT BOUNTY 4?
The professionals named in the filing: Architect: AR GANESH BHAGWAT; Engineer: ER NAVNATH JARAG; Chartered Accountant: SPCM AND ASSOCIATES; Chartered Accountant: CA NIKITA A BAJAJ. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PERCEPT BOUNTY 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback