Home / Browse projects / Mumbai Suburban, Maharashtra / PARVATI SADAN

Completed No litigation declared Residential / Group Housing project

PARVATI SADAN

By MEENA BUILDER UNIT OF V N RAIKAR HUF

RG-MH-41708 · RERA P51800016081 · Last updated on MahaRERA portal: 30 Aug 2022

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2021Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 85%
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

PARVATI SADAN is a Residential / Group Housing project by MEENA BUILDER UNIT OF V N RAIKAR HUF in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800016081 on 16 Apr 2018. The registration is recorded completed; possession was promised by 30 Jun 2021.

At a glance

Project

  • NamePARVATI SADAN
  • TypeResidential / Group Housing
  • Location
    • 15TH ROAD
    • PLOT NO 49A PARVATI SADAN FRONT OF DHANLAXMI BANK CHEMBUR MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800016081
  • ReraGenie IDRG-MH-41708

Builder

  • NameMEENA BUILDER UNIT OF V N RAIKAR HUF
  • Entity typeOthers
  • Named personVIKAS N RAIKAR
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2018PromisedJun 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Apr 2018
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA60000
Building 2NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

Building 187%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Building 287%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 30 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes40%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered18
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area421 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
K S VISALAM ALSO KNOW VISALAM VENKATESHWARAN IYERKurlaMumbai Suburban

Approvals and building plan

Permissible FSI1182.65
Proposed, not sanctioned601 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch82 C RAJASHREE BUILDING N G ACHARYA MARG CHEMBUR MUMBAI 400071

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H WADHWA AND CO
EngineerSHRI KAUSTUBH RAIKAR
PartnerRole in project
MEENA BUILDER UNIT OF V N RAIKAR HUF-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010234Jun 2021 → Jun 2022

Reason as filed by the promoterProject was started as per old DC rules (of 1991) and later on there was modification in DC rules (of 2034). Hence there was delay due to change in some policies and due to covid19 pandemic.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2022

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Aug 2022
Certificates of CA (Form 3)File: Form 3.pdf12 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY21-22.pdf29 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf12 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf7 Apr 2022
Certificates of CA (Form 3)File: Form 3.pdf7 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Parvati Sadan.pdf11 Jan 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architects Certificate.pdf11 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf4 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf4 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Dec 2021
Certificates of CA (Form 3)File: Form 3.pdf3 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Nov 2021
Certificates of CA (Form 3)File: Form 3.pdf27 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Upto June21.pdf13 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Upto Sept21.pdf13 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf20 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Aug 2021
Certificates of CA (Form 3)File: C A Certificate.pdf11 Aug 2021
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf30 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY20-21.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY20-21.pdf26 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A.pdf4 Nov 2020
Certificates of CA (Form 5)File: Form 5.pdf11 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf11 Nov 2019
Certificates of CA (Form 3)File: C A Certificates.pdf11 Nov 2019
Building plan approvalFile: Amended plan 220819.pdf22 Oct 2019
Building plan approvalFile: Amendment Plan Approval Letter 220819.pdf22 Oct 2019
Building Plan Approval (IOD)File: Amended plan 220819.pdf22 Oct 2019
Building Plan Approval (IOD)File: Amendment Plan Approval Letter 220819.pdf22 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 011019.pdf22 Oct 2019
Certificates of CA (Form 5)File: Form 5 - MB.pdf13 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificae1.pdf19 Jul 2018
Certificates of CA (Form 3)File: C A Certificate1.pdf19 Jul 2018
Copy of the legal title reportFile: Title Certificate.pdf11 Apr 2018
Details of encumbrancesFile: Encumbrances Certificates.pdf11 Apr 2018
Proforma of Allotment letterFile: Agreement for Sale.pdf11 Apr 2018
Building plan approvalFile: IOD Plan.pdf5 Apr 2018
Building plan approvalFile: IOD 1.pdf5 Apr 2018
Building plan approvalFile: IOD 2.pdf5 Apr 2018
Layout approvalFile: IOD Plan.pdf5 Apr 2018
PAN CardFile: V N Raikar Huf.pdf5 Apr 2018
Copy of Layout Approval (in case of layout)File: IOD Plan.pdf5 Apr 2018
Building Plan Approval (IOD)File: IOD Plan.pdf5 Apr 2018
Building Plan Approval (IOD)File: IOD 1.pdf5 Apr 2018
Building Plan Approval (IOD)File: IOD 2.pdf5 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: PARVATI SADAN CC.pdf5 Apr 2018
Declaration in FORM BFile: Affidavit.pdf5 Apr 2018
Certificates of CA (Form 3)File: C A Certificates.pdf5 Apr 2018

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mangal ApartmentPlot No 32 Sector No 15 Ghansoli Navi Mumbai35CompletedJul 2014Jul 2014
Gaodevi ApartmentPlot no 94 Sector 21 Ghansoli Navi Mumbai20CompletedMar 2014Mar 2014
Vishali Apartmentplot no 111 Sector 16 Ghansoli Navi Mumbai66CompletedJan 2012Jan 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARVATI SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 49A PARVATI SADAN FRONT OF DHANLAXMI BANK CHEMBUR MUMBAI6,700+ in Mumbai Suburban

2 kmPARVATI SADANCompleted 138Lapsed / revoked 111Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: MEENA BUILDER UNIT OF V N RAIKAR HUF

MEENA BUILDER UNIT OF V N RAIKAR HUF has 1 registration on MahaRERA, including PARVATI SADAN. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PARVATI SADAN is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARVATI SADAN?

The registered promoter entity is MEENA BUILDER UNIT OF V N RAIKAR HUF, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARVATI SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARVATI SADAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARVATI SADAN?

The professionals named in the filing: Architect: B H WADHWA AND CO; Engineer: SHRI KAUSTUBH RAIKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARVATI SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARVATI SADAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARVATI SADAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.