Home / Browse projects / Nashik, Maharashtra / PARVATI HEIGHTS

Completed No litigation declared Residential / Group Housing project

PARVATI HEIGHTS

By LAXMINARAYAN CONSTRUCTIONS

RG-MH-08008 · RERA P51600007938 · Last updated on MahaRERA portal: 7 Sep 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

PARVATI HEIGHTS is a Residential / Group Housing project by LAXMINARAYAN CONSTRUCTIONS in Nashik, Maharashtra, registered with MahaRERA as P51600007938 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NamePARVATI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600007938
  • ReraGenie IDRG-MH-08008

Builder

  • NameLAXMINARAYAN CONSTRUCTIONS
  • Entity typePartnership
  • PartnersCHINTAMAN BALIRAM PATIL, CHARUSHILA CHINTAMAN PATIL
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 31 Dec 2020)
  • Buildings2 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARVATI HEIGHTS ANA60000
PARVATI HEIGHTS DNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

PARVATI HEIGHTS A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PARVATI HEIGHTS D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23
BuildingClosed/CoveredTotal
PARVATI HEIGHTS A1919
PARVATI HEIGHTS D44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,095 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1361.99
Proposed, not sanctioned1,362 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAIVILLA NEW NASHIK

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY SANAP
EngineerVijay Sanap
PartnerRole in project
LAXMINARAYAN CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600009771Dec 2020 → Dec 2021

Reason as filed by the promoterApplied for Occupancy Certificate. Actual approval may take some time. Proposed date of extension of project is 31/12/2021 which is not more than one year from expiry date of project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Sep 2022

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf7 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf7 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE A.pdf7 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE D.pdf7 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECTS CERTIFICATE.pdf7 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LAXMINARAYAN FORM 5.pdf31 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE PH-A.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE PH-D.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE PH-A.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE PH-D.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A (2).pdf12 Aug 2021
Declaration about Commencement CertificateFile: decleartion about commencement certificaete 1.pdf5 Jul 2021
Declaration about Commencement CertificateFile: decleartion about commencement certificaete 2.pdf5 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA form 2A Tushar Patil Parvati Heights D_compressed.pdf30 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA form 2A Tushar Patil Parvati Heights A_compressed.pdf30 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA form 2A Tushar Patil Parvati Heights A_compressed.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: disclosure of sold or booked inventry 1.pdf26 Jun 2021
Disclosure of sold/ booked inventoryFile: disclosure of sold or booked inventry 2.pdf26 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 2018-19.pdf26 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 2019-20.pdf26 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 2020-21.pdf26 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CCI12232020.pdf23 Dec 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CCI12232020_0001.pdf23 Dec 2020
OtherFile: CCI12232020.pdf23 Dec 2020
OtherFile: CCI12232020.pdf23 Dec 2020
Certificates of CA (Form 5)File: LAXMINARAYAN CONSTRUCTION.pdf29 Sep 2018
Building plan approvalFile: Builg Plan Builg A 1-1.pdf1 Aug 2017
Building plan approvalFile: Buildg Plan B,C,D 1-2.pdf1 Aug 2017
PAN CardFile: Charushila.pdf1 Aug 2017
PAN CardFile: Chintaman.pdf1 Aug 2017
PAN CardFile: Laxminarayan Constr.pdf1 Aug 2017
PAN CardFile: Tushar.pdf1 Aug 2017
Details of encumbrancesFile: Tushar Patil - Self Declaration regarding encumbrances.pdf1 Aug 2017
Building Plan Approval (IOD)File: Builg Plan Builg A 1-1.pdf1 Aug 2017
Building Plan Approval (IOD)File: Buildg Plan B,C,D 1-2.pdf1 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencment C Builg A.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Arch build A final.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Arch build D final.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engg build D final.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engg build A.pdf1 Aug 2017
Certificates of CA (Form 3)File: parvati Heights A CA Certificate.pdf1 Aug 2017
Certificates of CA (Form 3)File: CA certificate D.pdf1 Aug 2017
Proforma of Allotment letterFile: Parvati Heights-D Agree.pdf1 Aug 2017
Layout approvalFile: LAYOUT PLAN 315.pdf31 Jul 2017
Building plan approvalFile: Building Plan.pdf31 Jul 2017
Copy of the legal title reportFile: Title search Buildg D.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN 315.pdf31 Jul 2017
Building Plan Approval (IOD)File: Building Plan.pdf31 Jul 2017
Declaration in FORM BFile: Rs 100 Affidavite.pdf31 Jul 2017
Proforma of Allotment letterFile: Parvati Heights-A Agree_Rera__Blank_-2.pdf31 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PARVATI HEIGHTS CPATHARDI NASHIK15CompletedDec 2014Dec 2014
PARVATI HEIGHTS BSURVEY NO.315 2B 2 PLOT NO.16 TO 20 PATHARDI NASHIK16CompletedSep 2013Sep 2013

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 18 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARVATI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmPARVATI HEIGHTSCompleted 105Lapsed / revoked 20Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 200 registered projects within 2 km.

Builder: LAXMINARAYAN CONSTRUCTIONS

LAXMINARAYAN CONSTRUCTIONS has 1 registration on MahaRERA, including PARVATI HEIGHTS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if PARVATI HEIGHTS is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARVATI HEIGHTS?

The registered promoter entity is LAXMINARAYAN CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARVATI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARVATI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARVATI HEIGHTS?

The professionals named in the filing: Architect: VIJAY SANAP; Engineer: Vijay Sanap. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARVATI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARVATI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARVATI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.