Home / Browse projects / Pune, Maharashtra / PARVATARA PHASE 2

Registered No litigation declared Others project

PARVATARA PHASE 2

By Saakshi Constructions

RG-MH-08845 · RERA P52100002707 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
3 of 11Construction stages donefurthest along: Staircases, 90%
22 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

PARVATARA PHASE 2 is a Others project by Saakshi Constructions in Pune, Maharashtra, registered with MahaRERA as P52100002707 on 4 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 94 of the 116 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePARVATARA PHASE 2
  • TypeOthers
  • Location
    • Mukai Chowk
    • Kiwale
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002707
  • ReraGenie IDRG-MH-08845

Builder

  • NameSaakshi Constructions
  • Entity typePartnership
  • GSTIN27AAQFS8256G1ZK
  • PartnersNarendra Sunderlal Chugh, Naresh Sunderlal Chugh
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed65 files

Current status

81%94 of 116 units booked
85.6%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA20129026116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

BUILDING A: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.71%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.58%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed98

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots98
Closed/Covered98

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,050 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI12931.45
Proposed, not sanctioned12,931 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPimple Saudagar, Pune-411027
Estimated costRs 62.50 cr
Cost incurredRs 53.49 cr
Work done85.59%
BuildingWingEstimatedIncurred
BUILDING ANARs 54.03 crRs 44.75 cr
-NARs 8.46 crRs 8.74 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashank Phadke
EngineerRahul Kapse
EngineerKapil Chugh
Chartered AccountantGothe Dhurande & associates
Chartered AccountantNPSR & Associates
Chartered AccountantGanesh Sunil Mandlecha
PartnerRole in project
Saakshi Constructions-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012194Dec 2022 → Dec 2027

Reason as filed by the promoter1: We had applied for revised Building Plan Permission of project PARAVATARA Phase 2 which earlier was purely a commercial project and now after fresh revised Building Plan. It is the combination of commercial and Residential Project. 2: Since the Building plan was revised, we received a revised building work commencement Certificate for PARVATARA PHASE 2 on 15th Dec 2021. 3. After receipt of revised building plan for PARVATARA Phase 2, We have applied for getting revised Environment clearance certificate. We have not yet received the environment clearance till toady 4: Since We have not yet r

EXT52100011324Dec 2022 → May 2023

Reason as filed by the promoterRevised plan not yet sanctioned. Work not yet commenced. No booking accepted.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 Q4.pdf29 Jun 2026
Withdrawal Update Form 2File: form 2 scan.pdf29 Jun 2026
Withdrawal Update Form 3File: Form - 3 Q4 with sign_compressed.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf27 Jun 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 scan.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 scan.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM 3 SCAN_compressed (1).pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 with scan_compressed.pdf27 Jun 2026
Withdrawal Update Form 1File: Form1 300625.pdf3 Jun 2026
Withdrawal Update Form 1File: Form1 300925.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 3_0001.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2_0001.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3 WITH SIGNS.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3 WITH SIGN.pdf3 Jun 2026
Certificates of CA (Form 3)File: QTR-4 Form -3 _compressed-1-1.pdf25 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf27 Jan 2025
Certificates of CA (Form 3)File: Qtr4.pdf25 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 -Parvatara Phase 2.pdf25 Jan 2025
Certificates of CA (Form 3)File: CA Certificate Form 3.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf6 Feb 2024
Certificates of CA (Form 3)File: Final Form 3 Q3_compressed.pdf16 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf26 Dec 2023
Certificates of CA (Form 3)File: PARVATARA Phase 2 Form 3 upto june 2023_0001_0001.pdf13 Dec 2023
Certificates of CA (Form 3)File: PARVATARA Phase 2 Form 3 upto sep 2023_0001_0001_0001.pdf13 Dec 2023
Certificates of CA (Form 3)File: Final Form 3_compressed.pdf31 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf31 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Architect Certificate_Saakhi Constructions.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate Form 5.PDF24 Mar 2023
Certificates of CA (Form 3)File: CA RERA Certificate_Saakshi Constructions_compressed.pdf21 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Saakshi - PR (1).pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Desclosure of sold - unsold inventory (2).pdf4 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory (1).pdf28 Apr 2022
Certificates of CA (Form 3)File: CA Certificate.pdf28 Apr 2022
Certificates of CA (Form 3)File: CA Certificate (2).pdf14 Apr 2022
CERSAI detailsFile: CERSAI Undertaking.pdf2 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf23 Mar 2022
Declaration about Commencement CertificateFile: Commencement Certificate - PARVATARA Phase 2.pdf12 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 of RERA.pdf12 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 of RERA.pdf12 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 of RERA.pdf12 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's certificate 2A Quality Certificate.pdf1 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's certificate 2A Quality Certificate.pdf1 Mar 2022
Layout approvalFile: Revised Sanction Layout.pdf23 Feb 2022
Copy of Layout Approval (in case of layout)File: Revised Sanction Layout.pdf23 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Solf Booking inventory.pdf23 Feb 2022
Certificates of CA (Form 5)File: Saakshi Phase 2.pdf1 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PT_Engineers_Certificate_Phase_2.pdf28 Jul 2017
Certificates of CA (Form 3)File: PT_CA_Certificate_Phase_2.pdf28 Jul 2017
Certificates of CA (Form 5)File: PT_CA_Certificate_Phase_2.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 Parvatara Phase II.pdf24 Jul 2017
Proforma of Allotment letterFile: Parvatara_Agreement_Draft_Pahse_2.pdf21 Jul 2017
Proforma of Allotment letterFile: PT_Letter_for_Allotment-_Phase-2.pdf21 Jul 2017
Declaration in FORM BFile: Promotors _Self_Declaration_Phase_2.pdf19 Jul 2017
Details of encumbrancesFile: PT_Saakshi_Self_Declration_Phase -2.pdf11 Jul 2017
Building plan approvalFile: PT_Saakshi_IOD.pdf10 Jul 2017
Layout approvalFile: PT_Sanctioned_Layout_1-1 (1).pdf10 Jul 2017
PAN CardFile: Pan_Card_saakshi_Constructions (1).pdf10 Jul 2017
Copy of the legal title reportFile: PT_Search_Report.pdf10 Jul 2017
Copy of Layout Approval (in case of layout)File: PT_Sanctioned_Layout_1-1 (1).pdf10 Jul 2017
Building Plan Approval (IOD)File: PT_Saakshi_IOD.pdf10 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Certificate_13_01_2017_Final.pdf10 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ParvasaakshiPimple Saudagar82CompletedMar 2016Mar 2016

How this compares with Pune

81%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARVATARA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kiwale13,700+ in Pune

2 kmPARVATARA PHASE 2Completed 101Lapsed / revoked 54Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Saakshi Constructions

Saakshi Constructions has 3 registrations on MahaRERA, including PARVATARA PHASE 1 and PARVATARA PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARVATARA PHASE 2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARVATARA PHASE 2?

The registered promoter entity is Saakshi Constructions, a partnership as per the filing. Its GSTIN 27AAQFS8256G1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARVATARA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARVATARA PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARVATARA PHASE 2?

The professionals named in the filing: Architect: Shashank Phadke; Engineer: Rahul Kapse; Engineer: Kapil Chugh; Chartered Accountant: Gothe Dhurande & associates; Chartered Accountant: NPSR & Associates; Chartered Accountant: Ganesh Sunil Mandlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARVATARA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARVATARA PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARVATARA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.