Red flags

  • Completion date moved by 52 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

PARSHV GLORY is a Residential / Group Housing project by JINIT RAMESH MEHTA in Palghar, Maharashtra, registered with MahaRERA as P99000017032 on 4 Jul 2018. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 52 months from the original filing.

At a glance

Project

  • NamePARSHV GLORY
  • TypeResidential / Group Housing
  • Location
    • WAGULSAR
    • MAHIM VILLAGE
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000017032
  • ReraGenie IDRG-MH-40088

Builder

  • NameJINIT RAMESH MEHTA
  • Entity typeIndividual

Key dates

this monthRegisteredJul 2018First promiseAug 2020Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jul 2018
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Aug 2020)
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA60000
WING DNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
WING C44
WING D44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,699 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2102.09
Proposed, not sanctioned2,102 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR VITHAL MANDIR, VIRAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU SHILP ASSOCIATES
EngineerDarsh Consult
Chartered AccountantBharat Dhonde and Co
PartnerRole in project
JINIT RAMESH MEHTA-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012562Aug 2020 → Dec 2023

Reason as filed by the promoterWE WANT TO EXTEND THE RERA CERTIFICATE BECAUSE STILL OUR SOME FLATS ARE PENDING TO BE SOLD .

EXT99000009175Aug 2020 → Mar 2022

Reason as filed by the promoterDUE TO COVID-19 PANDEMIC SITUATION FROM MARCH-2020 COLLECTOR OFFICE ARE NOT WORKING AND LATER ON REGULAR FUNCTIONING PERIOD WE HAVE STARTED WITH FURTHER PROCEDURE TO COMPLETE OC FORMALITITES

EXT99000002510Aug 2020 → Aug 2020

Reason as filed by the promoterThe reason for delay is that our work is going slow and our flat's are also not sold.

EXT99000018294Aug 2020 → Dec 2024

Reason as filed by the promoterAs per Letter attached

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Nov 2019

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B (With Date).pdf9 Feb 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf29 Jan 2024
Declaration in FORM BFile: Form B - Jinit Mehta.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 31 Mar 2021.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 30 June 2022.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 30 Sept 2022.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 31 Dec 2022.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 31 Mar 2023.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 30 June 2023.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 30 Sept 2023.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: As on 31 Dec 2023.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-03-2019.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-03-2020.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-03-2021.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-03-2022.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 30-06-2022.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 30-09-2022.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-12-2022.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-03-2023.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-06-2023.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 30-09-2023.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: As on 31-12-2023.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Certificate For FY 2019-2020.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Certificate For FY 2020-2021.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Certificate For FY 2021-2022.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Certificate For FY 2022-2023.pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31032019.pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31032020.pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31032021.pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31-03-2022(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 30-06-2022(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 30-09-2022(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31-12-2022(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31-03-2023(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 30-06-2023(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 30-09-2023(C).pdf29 Jan 2024
Certificates of CA (Form 3)File: As on 31-12-2023(C).pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration about Interest in Real Estate - Jinit Mehta.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 01-04-2019 to 31-03-2020.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 01-04-2020 to 31-03-2021.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 01-04-2021 to 31-03-2022.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FY 01-04-2022 to 31-03-2023.pdf29 Jan 2024
Proforma of Agreement for saleFile: ag1.pdf29 Jan 2024
Proforma of Agreement for saleFile: ag2.pdf29 Jan 2024
Declaration in FORM BFile: FORM B_11zon.pdf12 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293012603_For_Asset_Based_Search_09_01_2024_16_16_29_811.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf12 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf12 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 PARSHV GLORY.pdf6 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WORK COMPLETED CERTIFICATE.pdf29 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: ANNUAL REPORT FORM 5.pdf17 Oct 2019
Proforma of Allotment letterFile: sale of agreement of parshv glory.pdf26 Nov 2018
Proforma of Allotment letterFile: LETTER OF ALLOTMENT PDF.pdf26 Nov 2018
Copy of the legal title reportFile: 20180620184507.pdf20 Jun 2018
Declaration in FORM BFile: 20180619152012.pdf19 Jun 2018
Proforma of Allotment letterFile: 20180619151929.pdf19 Jun 2018
Details of encumbrancesFile: PASRHV DEVELOPERS LETTER.pdf18 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: CC PARSHV GLORY.pdf18 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VASTU SHILP ARTICTE'S CERTIFICATE.pdf18 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DARSH CONSULTANT.pdf18 Jun 2018
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf18 Jun 2018
Building plan approvalFile: MYSCAN_20180615_0001.pdf16 Jun 2018
Building plan approvalFile: CC PARSHV GLORY.pdf16 Jun 2018
Layout approvalFile: MYSCAN_20180615_0002.pdf16 Jun 2018
PAN CardFile: ilovepdf_jpg_to_pdf.pdf16 Jun 2018
Copy of Layout Approval (in case of layout)File: MYSCAN_20180615_0002.pdf16 Jun 2018
Building Plan Approval (IOD)File: MYSCAN_20180615_0001.pdf16 Jun 2018
Building Plan Approval (IOD)File: CC PARSHV GLORY.pdf16 Jun 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 52 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARSHV GLORY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM VILLAGE3,200+ in Palghar

Builder: JINIT RAMESH MEHTA

JINIT RAMESH MEHTA has 1 registration on MahaRERA, including PARSHV GLORY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PARSHV GLORY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARSHV GLORY?

The registered promoter entity is JINIT RAMESH MEHTA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARSHV GLORY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARSHV GLORY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARSHV GLORY?

The professionals named in the filing: Architect: VASTU SHILP ASSOCIATES; Engineer: Darsh Consult; Chartered Accountant: Bharat Dhonde and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARSHV GLORY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARSHV GLORY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARSHV GLORY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.