Home / Browse projects / Palghar, Maharashtra / PARMAR JEWEL RESIDENCY
PARMAR JEWEL RESIDENCY
RG-MH-26759 · RERA P99000011450 · Last updated on MahaRERA portal: 4 Aug 2022
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 27 months past the filed date
- 10 complaints at MahaRERA
- Completion date moved by 48 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARMAR JEWEL RESIDENCY is a Others project by PARMARBUILDTECH in Palghar, Maharashtra, registered with MahaRERA as P99000011450 on 31 Aug 2017. Possession was promised by 30 Jul 2024 and is now 27 months past that date. The completion date has moved by 48 months from the original filing. 10 complaints are on record with the regulator.
At a glance
Project
- NamePARMAR JEWEL RESIDENCY
- TypeOthers
- Location
- STATION ROAD
- RANGE OFFICE
- GOKHIVARE
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000011450
- ReraGenie IDRG-MH-26759
Builder
- NamePARMARBUILDTECH
- Entity typePartnership
- PartnerNITESH JAYANTILAL PARMAR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion30 Jul 2024
- Revised completionRevised to 30 Jul 2024 (originally 31 Jul 2020)
- Buildings2 building records
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING , B WING | NA | 14 | 0 | 0 | 0 | 0 |
| PARMAR BUILDING NO 2 | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 93%.
A WING , B WING72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 93% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 76% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 83% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
PARMAR BUILDING NO 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ENCON |
| Partner | Role in project |
|---|---|
| PARMARBUILDTECH | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe required permission from the competent authority to construct four (4) more floors was received on 02/07/2018, which was not considered at the time of registration of the project with MahaRERA. Further, as per newly notified norms of the Competent Authority, the Project has potential to construct 12th floor in a building, for which application is pending with the competent authority. Therefore, extension of date of completion of the project has been made under Section 6 of RERA, 2016.
Reason as filed by the promoterNon availability of required materials within stipulated time and within estimated budgets
Reason as filed by the promoterWe state that we have received further Commencement Certificate for the said Project on 12.08.2021 bearing reference no. VVCMC/TP/RDP/VP-0110 & 5281/361/2021-22], approved by Vasai Virar Municipal Corporation on the basis of unified development Control and Promotion Regulations which was published as per the Govt. Notification No. TPS-1818/CR-236/18/SEC 37 (1AA)/UD-13 dated 2nd December 2020, pursuant to which additional FSI was approved by the concerned authority. We are hereby applying for extension u/s 7(3) of the registered project bearing Registration No. P99000011450, as prescribed under
Complaints filed with MahaRERA10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209905 | Surekha Kapare | M/s Parmar Build Tech | 03/02/2022 |
| CC006000000210211 | GARUDA AVIATION SERVICES PRIVATE LIMITED | M/S PARMAR BUILD TECH | 02/03/2022 |
| CC006000000397791 | PRAVIN AGARWAL | Parmar Build Tech | 04/12/2023 |
| CC006000000397794 | PRAVIN AGARWAL | Parmar Build Tech | 04/12/2023 |
| CC006000000397796 | PRAVIN AGARWAL | PARMAR BUILD TECH | 04/12/2023 |
| CC006000000397798 | PRAVIN AGARWAL | PARMAR BUILD TECH | 04/12/2023 |
| CC006000000397799 | PRAVIN AGARWAL | PARMAR BUILD TECH | 04/12/2023 |
| CC006000000397802 | PRAVIN AGARWAL | PARMAR BUILD TECH | 04/12/2023 |
| CC006000000374781 | Simran Ajay Rai | Parmar Build Tech | 14/03/2023 |
| CC12504408 | Simran Ajay Rai | PARMARBUILDTECH | 11/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Nov 2020
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure_compressed.pdf | 4 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1_Parmar.pdf | 11 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Form 2_Parmar.pdf | 11 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Jewel_Disclosure of Sold Units.pdf | 11 Jul 2022 |
| Details of encumbrancesFile: NO_DUE_PATAN BANK_PBT.PDF | 31 Mar 2022 |
| Details of encumbrancesFile: SBI No Dues Certificate.pdf | 31 Mar 2022 |
| Layout approvalFile: Layout Plan.pdf | 16 Mar 2022 |
| Building plan approvalFile: Floor Plan.pdf | 16 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 16 Mar 2022 |
| Building Plan Approval (IOD)File: Floor Plan.pdf | 16 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC Jewel.pdf | 12 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architecht Cerificcate _PBT_JAN 2021.pdf | 13 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Cerificcate _PBT_JAN 2021.pdf | 13 Feb 2021 |
| Certificates of CA (Form 3)File: PBT_RERA_CA FORM 3_JAN 2021.pdf | 13 Feb 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Parmar Building No 2_OC-Compress.pdf | 20 Nov 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Parmar Building No 2_OC Plan - Compress.pdf | 20 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_RERA_Arch Certificate_July 20.pdf | 31 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_RERA_Eng Certfc_July 20.pdf | 31 Oct 2020 |
| Certificates of CA (Form 3)File: PBT_RERA_CA FORM 3_JAN 20.pdf | 4 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_ENCON Architect Certificate_JAN 20.pdf | 27 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_ENCON_Engineer Certificate_JAN 20.pdf | 27 Feb 2020 |
| Certificates of CA (Form 3)File: PBT_RERA_CA Certfct_Oct19_compressed.pdf | 14 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_RERA_Arch Certificate_Oct 19_compressed.pdf | 11 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_RERA_Eng Certfc_Oct 19_compressed.pdf | 11 Nov 2019 |
| OtherFile: PBT_PIM II_OC Application.pdf | 1 Oct 2019 |
| OtherFile: SBI No Dues Certificate.pdf | 24 Sep 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: PBT_RERA_CA FORM 5_F Y 2018-19.pdf | 20 Aug 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: PBT_RERA_CA FORM 5_FY 2018-19.pdf | 14 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_RERA_Arch Certificate_Jul 19_.pdf | 30 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_RERA_Engg Certificate_Jul 19_.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: PBT RERA_CA Form 3_July 2019.pdf | 29 Jul 2019 |
| Certificates of CA (Form 3)File: PBT_RERA_CA FORM 3_Apr 19.pdf | 2 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate_PBT_April 18.pdf | 30 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_PBT_April 18.pdf | 30 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Parmar-Jewel-Residency-VVCMC_TP_RDP_VP-110-VP-5821_61_2018-19-1-6-6.pdf | 4 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Parmar-Jewel-Residency-VVCMC_TP_RDP_VP-110-VP-5821_61_2018-19-1-1-5.pdf | 4 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_Eng Certfc_Jan 19-compressed.pdf | 30 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_Arch Certfc_Jan 19-compressed.pdf | 30 Jan 2019 |
| Certificates of CA (Form 3)File: PBT_RERA_Form 3_Jan19.pdf | 30 Jan 2019 |
| Layout approvalFile: For RERA_New Layout Plan_Jewel.pdf | 3 Dec 2018 |
| Copy of Layout Approval (in case of layout)File: For RERA_New Layout Plan_Jewel.pdf | 3 Dec 2018 |
| Certificates of CA (Form 3)File: PBT_RERA_Oct'18_1.pdf | 4 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_Arch Certfc_Oct 18.pdf | 29 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_Eng Certfc_Oct 18.pdf | 29 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: PIM-2--VVCMC_TP_RDP_VP-110-VP-5821_63_2018-19-1-5.pdf | 29 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: PIM-2--VVCMC_TP_RDP_VP-110-VP-5821_63_2018-19--6-7_Plan 1.pdf | 29 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: PIM-2--VVCMC_TP_RDP_VP-110-VP-5821_63_2018-19--6-7_Plan 2.pdf | 29 Jul 2018 |
| Certificates of CA (Form 3)File: PBT_RERA_CA FORM 3_Apr 18_1_Compresd.pdf | 2 May 2018 |
| Certificates of CA (Form 3)File: PBT_RERA_CA FORM 3_Apr 18_2.pdf | 2 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_Eng Certfc_April 18.pdf | 1 May 2018 |
| Certificates of CA (Form 3)File: CA Certfc_Jan 18 Pg 1-3.pdf | 31 Jan 2018 |
| Certificates of CA (Form 3)File: CA Certfc_Jan 18 Pg 4-6.pdf | 31 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certftct1.pdf | 23 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certftct2.pdf | 23 Jan 2018 |
| Certificates of CA (Form 3)File: PBT_CA CERTFCT_OCT 17-compressed.pdf | 31 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBT_RERA_OCT 17_ENCON-compressed.pdf | 30 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBT_RERA_OCT 17_SANJAY NARANG.pdf | 30 Oct 2017 |
| Certificates of CA (Form 3)File: PBT CA CERTIFICATE.pdf | 31 Jul 2017 |
| Layout approvalFile: LAYOUT 1.pdf | 29 Jul 2017 |
| Layout approvalFile: G 7.pdf | 29 Jul 2017 |
| Building plan approvalFile: LAYOUT 1.pdf | 29 Jul 2017 |
| PAN CardFile: PANCARD PBT.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE SR NO 21 1 2B-compressed.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT 1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: G 7.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: LAYOUT 1.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE compressed.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: FORM B compressed.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects CERTIFICATE compressed.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE OF PBT.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: RERA_PARMAR BUILD TECH _Allotment of Shop_Draft.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: RERA_PARMAR BUILD TECH BLANK DRAFT FOR FLATSHOP.pdf | 29 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PARMAR INDUSTRIAL MALL | Opp. Range Office, Village Gokhivare, Vasai East, Dist. Palghar | 35 | Completed | Jul 2012 | Late, Oct 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PARMAR JEWEL RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RANGE OFFICE, GOKHIVARE3,200+ in Palghar
Filed coordinates, straight-line distance. 334 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: PARMARBUILDTECH
PARMARBUILDTECH has 1 registration on MahaRERA, including PARMAR JEWEL RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that PARMAR JEWEL RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PARMAR JEWEL RESIDENCY is delayed beyond 30 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARMAR JEWEL RESIDENCY?
The registered promoter entity is PARMARBUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARMAR JEWEL RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PARMAR JEWEL RESIDENCY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PARMAR JEWEL RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARMAR JEWEL RESIDENCY?
The professionals named in the filing: Architect: ENCON. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARMAR JEWEL RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback