Home / Browse projects / Palghar, Maharashtra / PARASNATH NAGARI
PARASNATH NAGARI
RG-MH-28993 · RERA P99000027533 · Last updated on MahaRERA portal: 22 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 54 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARASNATH NAGARI is a Residential / Group Housing project by SHREENATH ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000027533 on 14 Dec 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 54 months from the original filing. 43 of the 77 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NamePARASNATH NAGARI
- TypeResidential / Group Housing
- Location
- UMROLI EAST
- UMROLI RLY STN
- Umroli
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000027533
- ReraGenie IDRG-MH-28993
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Dec 2020
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed52 files
Current status
Figures as on 22 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG NO-2 TYPE C D E WING A B C | NA | 6 | 4 | 50 | 27 | 77 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
BLDG NO-2 TYPE C D E WING A B C: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 0% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLDG NO-2 TYPE C D E WING A B C | NA | Rs 5.46 cr | Rs 5.46 cr |
| - | NA | Rs 1.89 cr | Rs 1.89 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARM S YADAV parmar |
| Engineer | YOGESH D VAJA |
| Chartered Accountant | LUNAWAT & VYAS |
| Chartered Accountant | STR AND ASSOCIATES |
| Chartered Accountant | S B JAIN AND ASSOCIATES |
| Chartered Accountant | sachin h chordiya |
| Partner | Role in project |
|---|---|
| SHREENATH ENTERPRISES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterPROJECT IS IN REMOTE LOCATION AND SALE RESPONCE IS TOO LOW FOR THE PROJECT.. CASH FLOW ISSUED LEADED TO GET PROJECT DATE DELAYED
Reason as filed by the promoterDear Sir, With reference to cited subject, We the undersigned developer of the Project PARASNATH NAGARI would like to inform you that my Maharera Project due date has been expired, Due to covid 19 Pandemic and market slow down we could not complete the entire project within the stipulated timeline. Thus, our honour, in the larger interest of the Project kindly extends the Project further till 29-06-2024. We hope that a balanced approach keeping in view the object and intent of the enactment and the rights and liabilities of promoter and allottees in larger public interest is to be adopted. Tha
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM1.pdf | 22 Nov 2025 |
| Form 2File: FORM2.pdf | 22 Nov 2025 |
| Form 3File: form 3 draft 154.pdf | 22 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf | 22 Nov 2025 |
| Form 1File: FORM1.pdf | 22 Nov 2025 |
| Form 2File: FORM2.pdf | 22 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf | 22 Nov 2025 |
| Form 3File: form 3 draft 154.pdf | 22 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 12 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 12 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH PAR.pdf | 9 May 2024 |
| Declaration about Commencement CertificateFile: cc dec parshwanth.pdf | 6 May 2024 |
| Declaration in FORM BFile: FORM B REVISED DATE.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG PARSHWANTH.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: New Doc 05-06-2024.pdf | 6 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PARSHWNATH.pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARASHNATH.pdf | 6 May 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200279807191_For_Asset_Based_Search_08_09_2023_12_52_12_489.pdf | 8 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022.pdf | 2 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023.pdf | 2 Sep 2023 |
| Declaration in FORM BFile: FORM B REVISED_opt.pdf | 31 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2020 21.pdf | 27 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021 22.pdf | 27 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022 23.pdf | 27 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JUNE 23OPT.pdf | 27 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf | 27 Aug 2023 |
| Declaration in FORM BFile: DECLARETION 01.pdf | 10 Dec 2020 |
| Details of encumbrancesFile: Encubration_REV.pdf | 9 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 ARCHITECT CERTI 154-01.pdf | 9 Dec 2020 |
| OtherFile: Partnership Deed_002.pdf | 9 Dec 2020 |
| Layout approvalFile: MERGED.pdf | 6 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: MERGED.pdf | 6 Dec 2020 |
| Proforma of Allotment letterFile: draft for rera.pdf | 6 Dec 2020 |
| Layout approvalFile: BLUE P (1).pdf | 4 Dec 2020 |
| Layout approvalFile: BLUE P (2).pdf | 4 Dec 2020 |
| Layout approvalFile: BLUE P (3).pdf | 4 Dec 2020 |
| Layout approvalFile: BLUE P (4).pdf | 4 Dec 2020 |
| Building plan approvalFile: NA CC_compressed.pdf | 4 Dec 2020 |
| PAN CardFile: shreenath pan card.pdf | 4 Dec 2020 |
| Copy of the legal title reportFile: LEGAL ADVOCATE.pdf | 4 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: BLUE P (1).pdf | 4 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: BLUE P (2).pdf | 4 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: BLUE P (3).pdf | 4 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: BLUE P (4).pdf | 4 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: NA CC_compressed.pdf | 4 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: NA CC_compressed.pdf | 4 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC PARASNATH NAGARI B2-154.pdf | 4 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 154 -B.pdf | 4 Dec 2020 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PARASNATH NAGARI | UMROLI EAST | 200 | Completed | Apr 2020 | Late, Dec 2020 |
| PARASNATH TOWNSHIP | PANCHALI BOISAR WEST | 130 | Completed | Mar 2020 | Late, Dec 2020 |
| PARASNATH GARDEN | UMROLI EAST | 350 | Completed | Nov 2017 | Late, Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PARASNATH NAGARI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near UMROLI RLY STN3,200+ in Palghar
Filed coordinates, straight-line distance. 71 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: SHREENATH ENTERPRISES
SHREENATH ENTERPRISES has 12 registrations on MahaRERA, including HORIZON HEIGHTS D and SHREE NATH NAGAR NO 1 AND 2. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if PARASNATH NAGARI is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARASNATH NAGARI?
The registered promoter entity is SHREENATH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARASNATH NAGARI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PARASNATH NAGARI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARASNATH NAGARI?
The professionals named in the filing: Architect: DHARM S YADAV parmar; Engineer: YOGESH D VAJA; Chartered Accountant: LUNAWAT & VYAS; Chartered Accountant: STR AND ASSOCIATES; Chartered Accountant: S B JAIN AND ASSOCIATES; Chartered Accountant: sachin h chordiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARASNATH NAGARI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback