Home / Browse projects / Palghar, Maharashtra / PARAMOUNT HEIGHT
PARAMOUNT HEIGHT
RG-MH-52927 · RERA P99000045849 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARAMOUNT HEIGHT is a Residential / Group Housing project by MUNISH GROUP OF COMPANY in Palghar, Maharashtra, registered with MahaRERA as P99000045849 on 15 Jun 2022. Possession is promised by 31 Dec 2027. 5 of the 392 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NamePARAMOUNT HEIGHT
- TypeResidential / Group Housing
- Location
- DEVIPADA ROAD
- VASAI EAST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000045849
- ReraGenie IDRG-MH-52927
Builder
- NameMUNISH GROUP OF COMPANY
- Entity typePartnership
- GSTIN27ABSFM9538L1Z8
- PartnersEJAJ AHMAD NIYAZ KHAN, MASROOF AHMED RAFIQUE AHMED SHAIKH, RIYAZAHMED NIYAZ KHAN, WASIM SHAMIM KHAN, SHAHNAWAZ ALAM M SHAIKH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PARAMOUNT HEIGHT | NA | 19 | 19 | 366 | 26 | 392 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 42%.
PARAMOUNT HEIGHT: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 42% |
| Slabs of Super Structure | 36% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 12% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| LAWRENCE B LOPES | Vasai-Virar City (M Corp) | Palghar |
| INAS BASTAV LOPES | Vasai-Virar City (M Corp) | Palghar |
| PRIYANKA MILIND DHULSADA | Vasai-Virar City (M Corp) | Palghar |
| NEELAM SANJAY PANDEY | Vasai-Virar City (M Corp) | Palghar |
| BHARAT NANA BHOIR | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PARAMOUNT HEIGHT | NA | Rs 31.66 cr | Rs 11.84 cr |
| - | NA | Rs 3.52 cr | Rs 3.52 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DIPESH VANMALI |
| Engineer | MOHD SUFIYAN SHAIKH |
| Chartered Accountant | KUMAR MHATRE |
| Partner | Role in project |
|---|---|
| MUNISH GROUP OF COMPANY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: 11zon_merged-PDF.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: 11zon_merged-PDF.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: CA REPORT (1) (2).pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: CA REPORT (1) (2).pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 PARAMOUNT APRIL TO JUNE 2025.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 PARAMOUNT JULY TO SEP2025.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Architecture OCT TO DEC 2025.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: 11zon_merged-PDF.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: 11zon_merged-PDF (1).pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 _.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: FORM_NO_3_September (1).pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: FORM_NO_3_December (1).pdf | 24 Jun 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (NEW).pdf | 19 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -03.pdf | 3 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MUNISH FORM 3.pdf | 27 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE TO LEGAL.pdf | 18 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE TO FINANCE.pdf | 18 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 18 Mar 2025 |
| Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf | 18 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A LETTER HEAD.pdf | 18 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf | 18 Mar 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE TO LEGAL.pdf | 18 Mar 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE TO FINANCE.pdf | 18 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT.pdf | 18 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE 1A.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MERGED.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure d Form 3.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure F Form 5.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: (WING A) WASIM NIYAZBHAI.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: (WING B) WASIM NIYAZBHAI G.pdf | 30 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Completion Certificate.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE.pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _.pdf | 2 Feb 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 27 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -B 10-12-2022.pdf | 12 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CF 10-12-2022.pdf | 12 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -B 10-12-2022.pdf | 12 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -B 10-12-2022.pdf | 12 Dec 2022 |
| Other - TechnicalFile: Registered Development Agreement -1.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement-2.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement -3.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement -4.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement-5.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement -6.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement -7.pdf | 3 Nov 2022 |
| Other - TechnicalFile: Registered Development Agreement -8.pdf | 3 Nov 2022 |
| Building plan approvalFile: 2_compressed_compressed.pdf | 9 Jun 2022 |
| Layout approvalFile: 1_compressed_compressed (1).pdf | 9 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: 1_compressed_compressed (1).pdf | 9 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed_compressed.pdf | 9 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: revised form 3_compressed (3).pdf | 19 May 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 19 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200236238432_For_Asset_Based_Search_29_04_2022_11_02_34_549.pdf | 29 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cERTIFICATE.pdf | 28 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 28 Apr 2022 |
| Proforma of Allotment letterFile: LETTER OF ALLOTMENT.pdf | 25 Apr 2022 |
| PAN CardFile: FIRM PAN CARD_compressed.pdf | 22 Apr 2022 |
| Copy of the legal title reportFile: revised title report_compressed.pdf | 22 Apr 2022 |
| Details of encumbrancesFile: LETTER OF ENCUMBRACES.pdf | 22 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC ORDER_compressed.pdf | 22 Apr 2022 |
| Declaration about Commencement CertificateFile: DECALARATION OF CC.pdf | 22 Apr 2022 |
| Declaration in FORM BFile: FORM B_compressed.pdf | 22 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PARAMOUNT HEIGHT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VASAI EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 125 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: MUNISH GROUP OF COMPANY
MUNISH GROUP OF COMPANY has 1 registration on MahaRERA, including PARAMOUNT HEIGHT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if PARAMOUNT HEIGHT is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARAMOUNT HEIGHT?
The registered promoter entity is MUNISH GROUP OF COMPANY, a partnership as per the filing. Its GSTIN 27ABSFM9538L1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARAMOUNT HEIGHT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PARAMOUNT HEIGHT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARAMOUNT HEIGHT?
The professionals named in the filing: Architect: DIPESH VANMALI; Engineer: MOHD SUFIYAN SHAIKH; Chartered Accountant: KUMAR MHATRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARAMOUNT HEIGHT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback