Home / Browse projects / Palghar, Maharashtra / PARAMOUNT ENCLAVE BLDG NO 4
PARAMOUNT ENCLAVE BLDG NO 4
RG-MH-83903 · RERA P99000017297 · Last updated on MahaRERA portal: 5 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARAMOUNT ENCLAVE BLDG NO 4 is a Residential / Group Housing project by AV AFFORDABLE HOUSING LLP in Palghar, Maharashtra, registered with MahaRERA as P99000017297 on 31 Jul 2018. Possession was promised by 29 Mar 2026 and is now 7 months past that date. The completion date has moved by 36 months from the original filing. 38 of the 64 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NamePARAMOUNT ENCLAVE BLDG NO 4
- TypeResidential / Group Housing
- Location
- MAHIM RAOD
- PALGHAR
- Mahim
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000017297
- ReraGenie IDRG-MH-83903
Builder
- NameAV AFFORDABLE HOUSING LLP
- Entity typePartnership
- PartnersMujahid Idris Dhukka, Yakub Noor Mohmed Davwa
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Jul 2018
- Promised completion29 Mar 2026
- Revised completionRevised to 29 Mar 2026 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 5 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PARAMOUNT ENCLAVE BLDG NO 4 | NA | 9 | 0 | 60 | 4 | 64 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
PARAMOUNT ENCLAVE BLDG NO 4: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 5 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| AV PRP HOUSING PROJECTS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PARAMOUNT ENCLAVE BLDG NO 4 | NA | Rs 5.63 cr | Rs 5.46 cr |
| - | NA | Rs 99.38 lakh | Rs 87.45 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KETAN SAWANT |
| Architect | Odyssey Architects & Associates |
| Engineer | Mukesh Kumar |
| Engineer | SHUBHAM NAVAL KISHOR TIWARI |
| Chartered Accountant | S lakdawala & Associates |
| Chartered Accountant | S A Dhukka & Co |
| Chartered Accountant | CHANDAN CHOUDHARY & ASSOCIATES |
| Partner | Role in project |
|---|---|
| AV AFFORDABLE HOUSING LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction is almost completed, need time to complete the remaining work as well as obtained occupation certificate, consent of the allottees is attached herewith.
Reason as filed by the promoterBuilding is Already Completed Occupation Certificate Application is in Process Hence One Year Extension Required
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Oct to Dec 2025.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Oct to Dec 2025.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: Form 3-Oct to Dec 25_compressed.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_July to Sep 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2- July to Sep 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 AV Affordable Housing LLP Jul to Sep 2025_11zon.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: FY 2024-25.pdf | 1 Dec 2025 |
| Withdrawal Update Form 1File: Form 1_July to Sep 25.pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Form 2- July to Sep 2025.pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 AV Affordable Housing LLP Jul to Sep 2025_11zon.pdf | 4 Nov 2025 |
| Form 2A (FY 2024-2025)File: AV Affordable Form 2A(2024-2025).pdf | 11 Aug 2025 |
| Withdrawal Update Form 1File: Av Affordable Form 1 (April- June 2025).pdf | 8 Aug 2025 |
| Withdrawal Update Form 1File: Av Affordable Form 1 (April- June 2025).pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: AV Affordable Form-2 (April to Jun 25).pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: AV Affordable Form-2 (April to Jun 25).pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 April to June 2025.pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 April to June 2025.pdf | 8 Aug 2025 |
| Form 5 (FY 2018-2019)File: Form-5 FY 2018-19.pdf | 8 Aug 2025 |
| Form 5 (FY 2023-2024)File: Form-5 FY 2023-24.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Av Affordable Form 1 (Jan - March 2025).pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: AV Affordable Form 3 (Jan - March 2025).pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AV Affordable Form 2 (Jan - March 2025).pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: AV Affordable Sold Unsold (Jan to March 2025).pdf | 26 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 2023-24.pdf | 5 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 FY 2023-24.pdf | 5 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold Unsold Oct to Dec 2024.pdf | 16 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Av Affordable Form 1 (October- December 2024).pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: AV Affordable Housing LLP Form 3.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Av Affordable Form 2 (Oct - Dec 2024).pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Av Affordable Form 1 (July- September 2024).pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: AV Affordable Form 3 (July- Sep 2024).pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AV Affordable Form 2 (July - Sep 2024).pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AV Affordable Sold Unsold (July- Sep 2024).pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AV Affordable Form 1 (April - June 2024).pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AV Affordable Form 2 (April - June 2024).pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: AV Affordable Sold Unsold Inventry (April 2024- June 2024).pdf | 8 Aug 2024 |
| Certificates of CA (Form 3)File: AV Affordable Form 3 (April - June 2024).pdf | 8 Aug 2024 |
| Declaration in FORM BFile: Form B.pdf | 17 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5(2022-2023).pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Jan -March 2024).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Jan - March 2024).pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 Declaration.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Jan to Mar 2023).pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (April - June 2023).pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (July to Sep 2023).pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Oct to Dec 2023).pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Jan to Mar 2023).pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (April - June 2023).pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (July to Sep 2023).pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Oct to Dec 2023).pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_FY 2022-23.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold (Jan to Mar 2023).pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold (April - June 2023).pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold (July to Sep 2023).pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold (Oct to Dec 2023).pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 (April - June 2023).pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 (July to Sep 2023).pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 (Oct to Dec 2023).pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-27-10-2023.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate_15-10-2023 _11zon.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: AV Affordable housing LLP Sold Unsold _11zon.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf | 3 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 06-06-2023.pdf | 3 Jul 2023 |
| Certificates of CA (Form 3)File: Form-3_CA certificate.pdf | 3 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 FY 2018-19.pdf | 3 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 FY 2019-20.pdf | 3 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 FY 2020-21.pdf | 3 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 FY 2021-22.pdf | 3 Jul 2023 |
| Declaration in FORM BFile: Rera-13 Form B .pdf | 28 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Rera-6 Financial Encumbrance .pdf | 7 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Rera-6 Financial Encumbrance .pdf | 7 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_FY 2019-20.pdf | 7 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_FY 2020-21.pdf | 7 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_FY 2021-22.pdf | 7 Jun 2023 |
| PAN CardFile: Pan Card.pdf | 6 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Rera-7 Legal and Litigation .pdf | 6 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Rera-7 Legal and Litigation .pdf | 6 Jun 2023 |
| Declaration about Commencement CertificateFile: Rera-1 Declaration CC .pdf | 6 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf | 6 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PARAMOUNT ENCLAVE BLDG NO 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PALGHAR3,200+ in Palghar
Filed coordinates, straight-line distance. 210 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: AV AFFORDABLE HOUSING LLP
AV AFFORDABLE HOUSING LLP has 1 registration on MahaRERA, including PARAMOUNT ENCLAVE BLDG NO 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that PARAMOUNT ENCLAVE BLDG NO 4 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PARAMOUNT ENCLAVE BLDG NO 4 is delayed beyond 29 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARAMOUNT ENCLAVE BLDG NO 4?
The registered promoter entity is AV AFFORDABLE HOUSING LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARAMOUNT ENCLAVE BLDG NO 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PARAMOUNT ENCLAVE BLDG NO 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARAMOUNT ENCLAVE BLDG NO 4?
The professionals named in the filing: Architect: KETAN SAWANT; Architect: Odyssey Architects & Associates; Engineer: Mukesh Kumar; Engineer: SHUBHAM NAVAL KISHOR TIWARI; Chartered Accountant: S lakdawala & Associates; Chartered Accountant: S A Dhukka & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARAMOUNT ENCLAVE BLDG NO 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback