Home / Browse projects / Pune, Maharashtra / PANACHE FLORA
PANACHE FLORA
By SHREE BHAGWATI CONSTRUCTION
RG-MH-44486 · RERA P52100053069 · Last updated on MahaRERA portal: 27 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 10 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PANACHE FLORA is a Residential / Group Housing project by SHREE BHAGWATI CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100053069 on 12 Oct 2023. Possession is promised by 31 Oct 2026. The completion date has moved by 10 months from the original filing. 35 of the 54 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NamePANACHE FLORA
- TypeResidential / Group Housing
- Location
- PIPE LINE ROAD
- SHINDEWASTI
- Ravet
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053069
- ReraGenie IDRG-MH-44486
Builder
- NameSHREE BHAGWATI CONSTRUCTION
- Entity typePartnership
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Oct 2023
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 25 Dec 2025)
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 27 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PANACHE FLORA | NA | 8 | 7 | 54 | 0 | 54 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
PANACHE FLORA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MRS PRIYANKA SWARUP BHONDVE | Ravet | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PANACHE FLORA | NA | Rs 11.23 cr | Rs 11.23 cr |
| - | NA | Rs 47.02 lakh | Rs 47.02 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KUNAL DILIP CHAUDHARI |
| Engineer | GAURAV D PATEL |
| Engineer | VAIBHAV UMRAO SHELWANE |
| Chartered Accountant | H. V. PATEL AND ASSOCIATES |
| Chartered Accountant | S V S V AND ACCOCIATES |
| Partner | Role in project |
|---|---|
| SHREE BHAGWATI CONSTRUCTION | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterwe hereby declare to MahaRERA that the project has been completed and possession has been handed over to the allottees. We request that our application for an extension be approved; this will facilitate the subsequent uploading of the Completion Certificate and the receipt of confirmation thereof, particularly since the completion of Building occurred after the 'Proposed Completion Date' originally recorded with MahaRERA.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 27 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 27 Aug 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 27 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf | 27 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-2026.pdf | 27 Aug 2026 |
| Form 5 (FY 2025-2026)File: Form 5 2025-26.pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 29 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: 20-10-2025 Form 3.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: 20-10-2025 Form 3.pdf | 23 Dec 2025 |
| Form 1File: Form 1, 10-10-25.pdf | 9 Dec 2025 |
| Form 2File: Form 2 , 10-10-25.pdf | 9 Dec 2025 |
| Form 3File: 20-10-2025 Form 3.pdf | 9 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 30-9-25.pdf | 9 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Panache Flora.pdf | 30 Sep 2025 |
| Form 1File: Form 1 14-7-25.pdf | 24 Jul 2025 |
| Form 2File: Form 2 14-7-25.pdf | 24 Jul 2025 |
| Form 3File: Form 3 14-7-25.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 30-6-25.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 3-4-25.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ,4-4-25_compressed.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3-4-25.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 , 7-1-25_compressed.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Jan 2025 |
| Layout approvalFile: HPSC0021_11zon.pdf | 11 Dec 2024 |
| Building plan approvalFile: HPSC0022_11zon.pdf | 11 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: HPSC0021_11zon.pdf | 11 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 20241204062603_organized.pdf | 11 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0022_11zon.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 18 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 20 May 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf | 23 Apr 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO FINANCE.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Bhagwati Ravet RERA Form 01_compressed.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_SHREE BHAGWATI CONSTRUCTION.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 0710.pdf | 7 Oct 2023 |
| Layout approvalFile: Blue print 1.pdf | 26 Sep 2023 |
| Building plan approvalFile: Blue print.pdf | 26 Sep 2023 |
| PAN CardFile: Firm Pancard.pdf | 26 Sep 2023 |
| Copy of the legal title reportFile: Search Report.pdf | 26 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Concerned To Finance.pdf | 26 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Concerned To Legal.pdf | 26 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Concerned To Finance.pdf | 26 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Concerned To Legal.pdf | 26 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Blue print 1.pdf | 26 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Blue print.pdf | 26 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Cc .pdf | 26 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration About Commencement.pdf | 26 Sep 2023 |
| Declaration in FORM BFile: DocScanner 26 Sep 2023 3-58 pm.pdf | 26 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 26 Sep 2023 |
| CERSAI detailsFile: Cersai Report.pdf | 26 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: New Disclosure Of Interest In other Real Estate Organization3.pdf | 26 Sep 2023 |
| Proforma of Agreement for saleFile: SHREE BHAGWATI CONSTRUCTION.pdf | 26 Sep 2023 |
| Proforma of Allotment letterFile: AL.pdf | 26 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 26 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Agreement To Sale - 2.pdf | 26 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Agreement To Sale.pdf | 26 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PANACHE FLORA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHINDEWASTI13,700+ in Pune
Filed coordinates, straight-line distance. 231 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: SHREE BHAGWATI CONSTRUCTION
SHREE BHAGWATI CONSTRUCTION has 2 registrations on MahaRERA, including VITTHAL ANGHAN and PANACHE FLORA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PANACHE FLORA is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PANACHE FLORA?
The registered promoter entity is SHREE BHAGWATI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PANACHE FLORA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PANACHE FLORA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PANACHE FLORA?
The professionals named in the filing: Architect: KUNAL DILIP CHAUDHARI; Engineer: GAURAV D PATEL; Engineer: VAIBHAV UMRAO SHELWANE; Chartered Accountant: H. V. PATEL AND ASSOCIATES; Chartered Accountant: S V S V AND ACCOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PANACHE FLORA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback