Home / Browse projects / Pune, Maharashtra / Palmspring Towers - A4, A5 and B2
Palmspring Towers - A4, A5 and B2
By KUMAR KERING DEVELOPERS LLP
RG-MH-89118 · RERA P52100048329 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Palmspring Towers - A4, A5 and B2 is a Residential / Group Housing project by KUMAR KERING DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100048329 on 26 Dec 2022. Possession is promised by 31 Dec 2026. 198 of the 217 units on this registration are recorded sold or booked, and 24 of 44 construction stages are filed complete.
At a glance
Project
- NamePalmspring Towers - A4, A5 and B2
- TypeResidential / Group Housing
- Location
- NIBM Road
- Mohhamadwadi
- UNDRI
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048329
- ReraGenie IDRG-MH-89118
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Dec 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings4 building records
- Documents filed137 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A4 | NA | 16 | 15 | 60 | 0 | 60 |
| A5 | NA | 16 | 15 | 60 | 0 | 60 |
| B2 - Wing A | NA | 16 | 15 | 45 | 0 | 45 |
| B2 - Wing B | NA | 16 | 15 | 52 | 0 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 56%.
A482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B2 - Wing A39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 42% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B2 - Wing B39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 22% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 42% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed358
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A4 | 96 | 0 | 96 |
| A5 | 96 | 8 | 104 |
| B2 - Wing A | 79 | 0 | 79 |
| B2 - Wing B | 79 | 0 | 79 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 19.57 cr | Rs 15.43 cr |
| A4 | NA | Rs 17.48 cr | Rs 18.33 cr |
| A5 | NA | Rs 17.48 cr | Rs 18.73 cr |
| B2 - Wing A | NA | Rs 16.15 cr | Rs 8.11 cr |
| B2 - Wing B | NA | Rs 15.71 cr | Rs 7.89 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Vishal Deshpande |
| Engineer | Mahesh Rasal Rasal |
| Engineer | Harshal Pendase |
| Engineer | MANDAR RAYKAR |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co |
| Partner | Role in project |
|---|---|
| KUMAR KERING DEVELOPERS LLP | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 445/2019 | Civil Judge Senior Division | Closed |
| 66/2021 | Civil Judge Senior Division Pune | Ongoing |
| 35/2020 | Civil Judge Senior Division Pune | Closed |
| 445/2019 | Civil Judge | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed137
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2022-2023)File: Form 2A March2023_Signed.pdf | 5 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A March2024_Signed.pdf | 5 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A March2025_Signed.pdf | 5 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form 2A_March2026_Signed.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_PS A4 A5 B2.pdf | 26 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PALMSPRING A5- A4- B2 MAR-25.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_Signed.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 11 Apr 2025 |
| Proforma of Agreement for saleFile: 250328_AFS_R5.pdf | 31 Mar 2025 |
| Copy of the legal title reportFile: 8_250109_Title Report.pdf | 20 Jan 2025 |
| Copy of the legal title reportFile: 9_250118_Legal Title Report_Format A.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 20 Jan 2025 |
| Proforma of Agreement for saleFile: 250110_AFS_R4.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 -Palmspring Tower A4 A5 B2.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 20 Jul 2024 |
| Layout approvalFile: 240523_Layout.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_1.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_2.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_3.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_4.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_5.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_6.pdf | 24 May 2024 |
| Building plan approvalFile: 240523_Building Plan_7.pdf | 24 May 2024 |
| Copy of Layout Approval (in case of layout)File: 240523_Layout.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_1.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_2.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_3.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_4.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_5.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_6.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240523_Building Plan_7.pdf | 24 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 240523_CC.pdf | 24 May 2024 |
| Declaration about Commencement CertificateFile: 240523_Declaration about CC.pdf | 24 May 2024 |
| Proforma of Agreement for saleFile: 240429_AFS_R3.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed (1).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 21_Palmspring Tower - A4 A5 B2.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 21_Palmspring Tower - A4 A5 B2.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 58_Palmspring Tower - A4 A5 and B2.pdf | 30 Sep 2023 |
| Layout approvalFile: 230714_Layout.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 3 of 24_B2_Fl Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 4 of 24_B2_Fl Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 5 of 24_B2_Fl Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 6 of 24_B2_Fl Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 7 of 24_B2_Fl Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: 230714_Sheet 10 of 24_A4 A5_Flr Plan.pdf | 19 Jul 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Palmspring Towers - A6, A7 and B3P52100018532 | Mohammedwadi, Pune | Nov 2018 | Completed | Apr 2025 | Apr 2025 |
| Palmspring Bungalows - E1 to E6P52100015961 | MOHAMMEDWADI, Pune | Apr 2018 | Completed | Dec 2021 | Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 137 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Palmspring Towers - A4, A5 and B2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mohhamadwadi13,700+ in Pune
Filed coordinates, straight-line distance. 212 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: KUMAR KERING DEVELOPERS LLP
KUMAR KERING DEVELOPERS LLP has 6 registrations on MahaRERA, including Palmspring Bungalows - E1 to E6 and Palmspring Towers - A6, A7 and B3. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Palmspring Towers - A4, A5 and B2 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Palmspring Towers - A4, A5 and B2?
The registered promoter entity is KUMAR KERING DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AAQFK3365A1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Palmspring Towers - A4, A5 and B2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Palmspring Towers - A4, A5 and B2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Palmspring Towers - A4, A5 and B2?
The professionals named in the filing: Architect: Ar Vishal Deshpande; Engineer: Mahesh Rasal Rasal; Engineer: Harshal Pendase; Engineer: MANDAR RAYKAR; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Palmspring Towers - A4, A5 and B2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback