PALM WORLD ONE

By PALMTREE DEVELOPMENTS PVT. LTD.

RG-MH-20749 · RERA P52100012101 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 51 months past the filed date
  • 37 complaints at MahaRERA
  • Completion date moved by 43 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jul 2022Possession promised51 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
20 of 66Units unsoldnot recorded sold or booked
37Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

PALM WORLD ONE is a Residential / Group Housing project by PALMTREE DEVELOPMENTS PVT. LTD. in NEAR EON IT PARK, 411014, registered with MahaRERA as P52100012101 on 1 Sep 2017. Possession was promised by 31 Jul 2022 and is now 51 months past that date. The completion date has moved by 43 months from the original filing. 46 of the 66 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 37 complaints are on record with the regulator.

At a glance

Project

  • NamePALM WORLD ONE
  • TypeResidential / Group Housing
  • Location
    • GRANT ROAD
    • NEAR EON IT PARK
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012101
  • ReraGenie IDRG-MH-20749

Builder

  • NamePALMTREE DEVELOPMENTS PVT. LTD.
  • Entity typeCompany
  • Managing DirectorsDEBAJYOTI DASGUPTA, ANURAG KHEMKA

Key dates

51 months past promisethis monthRegisteredSep 2017First promiseDec 2018Revised toJul 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion31 Jul 2022
  • Revised completionRevised to 31 Jul 2022 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed61 files

Current status

70%46 of 66 units booked

Figures as on 21 Nov 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PALM WORLD ONENA141166066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

PALM WORLD ONE: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed235

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots235
Closed/Covered191
Open Space44

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,151 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
BHUJBAL BROTHERS CONSTRUCTION COPune (CB)Pune
MAHAVEER PROPERTIESPune (CB)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4305.39
Proposed, not sanctioned3,022 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE RATNAKAR BANK LTD,OFFICE NO A, GROUND FLOOR, MITTAL COURT, 224 NARIMAN POINT, MUMBAI 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDWP INTERICS PVT LTD
EngineerDESIGN WERKZ ENGINEERING PVT LTD
Chartered AccountantR C Jain & Associates
PartnerRole in project
PALMTREE DEVELOPMENTS PVT. LTD.-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000958Dec 2018 → Apr 2020

Reason as filed by the promoterDear Sir / Madam, We, Palmtree Developments Pvt Ltd are developing residential project, PALM WORLD ONE in Survey No 63/2& 63/3, Kharadi, Haveli, Pune 411014 and we were due to complete the project on 31/12/18. Unfortunately, the project has to be stalled / stopped due to insufficient FSI sanctions to complete the project. The subject project is in joint venture with landowners i.e. Bhujbal Brothers Constructions Company & Mahaveer Properties through registered Joint Development Agreement document no 8227- 2014 dated 10th October 2014. In the mentioned agreement, the landowners have committed t

EXT52100003763Dec 2018 → Apr 2020

Reason as filed by the promoterDue to non corporation from the landowners, in December 2018 we decided to use our powers handed through power of Attorney to handover the Amenity space to Pune Mucipal Corporation, liaison with the Land Development and other relevant authorities and submit all the documentation required by Pune Municipal Corporation for the remembering FSI approvals. As of today we completed the full RCC till the 11th floor along with the block work and also have various agencies simultaneously working i.e. waterproofing, electrical, plumbing, gypsum, filing etc. at the site. We currently have around 40 skill

EXT52100006317Dec 2018 → Jul 2021

Reason as filed by the promoterConstruction work is stalled due to COVID pandamic. Lockdown and non availability of labour force has made it impossible for us to complete the work before the due date.

EXT52100011591Dec 2018 → Jul 2022

Reason as filed by the promoterdue to covid

Complaints filed with MahaRERA37

Case no.ComplainantRespondentFiled
CC005000000010466Kanchan Dadasaheb GhargeBhujbal Brothers Cinstruction Co.06/11/2017
CC005000000022767Arif Ebrahim ContractorPalmtree Developments Private Limited14/03/2019
CC005000000022768Arif Ebrahim ContractorPalmtree Developments Private Limited14/03/2019
CC005000000022830MR VINEET RATHI FOR HUFPALMTREE DEVELOPERS PRIVATE LIMITED27/03/2019
CC005000000022837vineet rathi for HUFPALMTREE DEVELIPERS PRIVATE LIMITED01/04/2019
CC005000000043730Bhavesh KhannaPalm World One30/11/2019
CC005000000053860Mrs. Arti Sourabh MalhotraPalmtree Developers Private Limited through its Authorized Signatory Mr. Anurag Khemka02/01/2020
CC005000000054036Tilak SoodPALMTREE DEVELOPMENTS PVT.LTD.13/02/2020
CC005000000054109Punit WaniPalm Tree Developments Pvt Ltd20/03/2020
CC005000000064589Subhorov RoyPalmtree Developments Pvt. Ltd.05/09/2020
CC005000000064642Saurav ShekharPalm Tree Developers Pvt. Ltd23/09/2020
CC005000000064650Prajakta WaniPalm Tree Developers Pvt. Ltd23/09/2020
CC005000000064648Amol MorePalm Tree Developers Pvt. Ltd03/10/2020
CC005000000085446Mr. Ashish Rangrao ChamatkarPalmtree Developments Private Limited Through its Authorized signatories Mr. Anurag Khemka14/04/2021
CC005000000106525Mrs. Pooja Bhushan RaikarPalmtree Developments Private Limited Thr. its Authorized Signatory Mr. Anurag Khemka22/01/2022
CC005000000127094Anurag KhemkaMr.Amol More14/05/2022
CC005000000127110Anurag KhemkaPrajakta Ashok Wani & Hemangi Ashok Wani09/06/2022
CC005000000167568Martin PrasadPalm Tree Developers Pvt. Ltd.24/09/2022
CC005000000218300Mrs Manju Purshottam Lohiapalmtree Development Pvt.Ltd through its Directors11/02/2023
CC005000000290038Rajesh Chandrakant SawantPALMTREE DEVELOPMENTS PRIVATE LIMITED09/01/2024
CC005000000310343ISHA BALAKANT JHAPALMTREE DEVELOPMENT PRIVATE LIMITED14/02/2024
CC12400153Shubham Prashant KolhePALMTREE DEVELOPMENTS PVT. LTD.18/09/2024
CC12400152Ashish Gajanan NaikPALMTREE DEVELOPMENTS PVT. LTD.18/09/2024
CC12401200SUJATA ANIL CHAUTHAIWALEPALMTREE DEVELOPMENTS PVT. LTD.21/12/2024
CC12500286SHIVAJI SURESH BHATKHANDEPALMTREE DEVELOPMENTS PVT. LTD.26/01/2025
CC12500138KARTIK DATTATRYA KAWAREPALMTREE DEVELOPMENTS PVT. LTD.15/01/2025
CC12500285MAHESH MAHADEV NARTAWADEKARPALMTREE DEVELOPMENTS PVT. LTD.26/01/2025
CC12500287PRATIK BHIMRAO NIMBARTEPALMTREE DEVELOPMENTS PVT. LTD.26/01/2025
CC12500284VEENY RAINAPALMTREE DEVELOPMENTS PVT. LTD.26/01/2025
CC12500290RAJABHAU SUBRAO LONDHEPALMTREE DEVELOPMENTS PVT. LTD.26/01/2025
CC12500292Omkar Anirudha WalkePALMTREE DEVELOPMENTS PVT. LTD.27/01/2025
CC12500304RAKESH SUBHASH PATNIPALMTREE DEVELOPMENTS PVT. LTD.28/01/2025
CC12500395Vaibhav katiyarPALMTREE DEVELOPMENTS PVT. LTD.06/02/2025
CC12500442Gaurav Raja BhandariPALMTREE DEVELOPMENTS PVT. LTD.10/02/2025
CC12500518VIVEK BHAUSAHEB JAGTAPPALMTREE DEVELOPMENTS PVT. LTD.15/02/2025
CC12503235Palm World OnePALMTREE DEVELOPMENTS PVT. LTD.12/09/2025
CC12503819Sushant Vidyasagar SoundattePALMTREE DEVELOPMENTS PVT. LTD.01/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Nov 2024

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part-OC Certificate 161024 - Palm Tree.pdf21 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part-OC Certificate 161024 - Palm Tree.pdf21 Nov 2024
Certificates of CA (Form 3)File: DEC-17.pdf11 Sep 2023
Certificates of CA (Form 3)File: MAR-18.pdf11 Sep 2023
Certificates of CA (Form 3)File: JUNE-18.pdf11 Sep 2023
Certificates of CA (Form 3)File: SEP-18.pdf11 Sep 2023
Certificates of CA (Form 3)File: DEC-18.pdf11 Sep 2023
Certificates of CA (Form 3)File: MAR-19.pdf11 Sep 2023
Certificates of CA (Form 3)File: JUNE -19.pdf11 Sep 2023
Certificates of CA (Form 3)File: SEP-19.pdf11 Sep 2023
Certificates of CA (Form 3)File: DEC-19.pdf11 Sep 2023
Certificates of CA (Form 3)File: MAR-20.pdf11 Sep 2023
Certificates of CA (Form 3)File: JUNE-20.pdf11 Sep 2023
Certificates of CA (Form 3)File: SEP-20.pdf11 Sep 2023
Certificates of CA (Form 3)File: DEC-20.pdf11 Sep 2023
Certificates of CA (Form 3)File: MAR-21.pdf11 Sep 2023
Certificates of CA (Form 3)File: JUNE-21.pdf11 Sep 2023
Certificates of CA (Form 3)File: SEP-21.pdf11 Sep 2023
Certificates of CA (Form 3)File: DEC-21.pdf11 Sep 2023
Certificates of CA (Form 3)File: MAR-22.pdf11 Sep 2023
CERSAI detailsFile: Cersai Certificate.pdf23 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21 Palm tree.pdf22 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018-2019 Palm tree.pdf4 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf4 Mar 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE SOLD AND UNSOLD.pdf2 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE_1.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: December 2020.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate.pdf3 Jan 2020
Building plan approvalFile: 01.pdf5 Dec 2019
Building plan approvalFile: 02.pdf5 Dec 2019
Building plan approvalFile: 03.pdf5 Dec 2019
Building Plan Approval (IOD)File: 01.pdf5 Dec 2019
Building Plan Approval (IOD)File: 02.pdf5 Dec 2019
Building Plan Approval (IOD)File: 03.pdf5 Dec 2019
Certificates of CA (Form 5)File: Audit_FORM 5.pdf14 Dec 2018
Proforma of Allotment letterFile: Draft Allotment Letter.pdf3 Dec 2018
Proforma of Allotment letterFile: Draft Agreement to Sale.pdf3 Dec 2018
Declaration in FORM BFile: 10 Form B - Declaration of Promoter.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1 - Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2 - Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: 13 Form 3 - CA Certificate.pdf31 Jul 2017
Building plan approvalFile: 15 Building Plan IOD 01.pdf30 Jul 2017
Building plan approvalFile: 15 Building Plan IOD 02.pdf30 Jul 2017
Building plan approvalFile: 15 Building Plan IOD 03.pdf30 Jul 2017
Layout approvalFile: 08 Palm World One - Santioned Plan 02.pdf30 Jul 2017
Layout approvalFile: 08 Palm World One - Santioned Plan 03.pdf30 Jul 2017
Layout approvalFile: 08 Palm World One - Santioned Plan 01.pdf30 Jul 2017
PAN CardFile: 05 Palmtree Developments Pvt Ltd - PAN Card.pdf30 Jul 2017
Copy of the legal title reportFile: 06 Palm World One - Title Investigation Report 01.pdf30 Jul 2017
Copy of the legal title reportFile: 06 Palm World One - Title Investigation Report 02.pdf30 Jul 2017
Copy of the legal title reportFile: 06 Palm World One - Title Investigation Report 03.pdf30 Jul 2017
Details of encumbrancesFile: 07 RERA Emburances Declaration.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 08 Palm World One - Santioned Plan 01.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 08 Palm World One - Santioned Plan 02.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 08 Palm World One - Santioned Plan 03.pdf30 Jul 2017
Building Plan Approval (IOD)File: 15 Building Plan IOD 01.pdf30 Jul 2017
Building Plan Approval (IOD)File: 15 Building Plan IOD 02.pdf30 Jul 2017
Building Plan Approval (IOD)File: 15 Building Plan IOD 03.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 14 Palm World One - Revised Commencement Certificate 140815.pdf30 Jul 2017
Proforma of Allotment letterFile: 09 Declaration of AFS and AL.pdf30 Jul 2017

Keep PALM WORLD ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR EON IT PARK

2 kmPALM WORLD ONECompleted 35Lapsed / revoked 15Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: PALMTREE DEVELOPMENTS PVT. LTD.

PALMTREE DEVELOPMENTS PVT. LTD. has 1 registration on MahaRERA, including PALM WORLD ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that PALM WORLD ONE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PALM WORLD ONE is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALM WORLD ONE?

The registered promoter entity is PALMTREE DEVELOPMENTS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALM WORLD ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PALM WORLD ONE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PALM WORLD ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALM WORLD ONE?

The professionals named in the filing: Architect: DWP INTERICS PVT LTD; Engineer: DESIGN WERKZ ENGINEERING PVT LTD; Chartered Accountant: R C Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALM WORLD ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALM WORLD ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALM WORLD ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.