Home / Browse projects / Pune, Maharashtra / PALM SPRING A, B, E
PALM SPRING A, B, E
By Aryavedant promoters & builders
RG-MH-16370 · RERA P52100026083 · Last updated on MahaRERA portal: 6 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALM SPRING A, B, E is a Residential / Group Housing project by Aryavedant promoters & builders in Pune, Maharashtra, registered with MahaRERA as P52100026083 on 15 Aug 2020. Possession was promised by 15 Jun 2024 and is now 28 months past that date.
At a glance
Project
- NamePALM SPRING A, B, E
- TypeResidential / Group Housing
- Location
- RAVET
- PUNE
- Haveli
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026083
- ReraGenie IDRG-MH-16370
Builder
- NameAryavedant promoters & builders
- Entity typePartnership
- PartnersASHWINI ARUN NAKHATE, SUMAN GANESH NAKHATE
- Other registrations3 more →
- Completed1 of 4
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Aug 2020
- Promised completion15 Jun 2024
- Revised completionNone
- Buildings3 building records
- Documents filed114 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 14 | 0 | 0 | 0 | 0 |
| B BUILDING | NA | 14 | 0 | 0 | 0 | 0 |
| E BUILDING | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.
A BUILDING85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 90% |
| Plinth | 50% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B BUILDING85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 90% |
| Plinth | 50% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
E BUILDING64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 6 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed108
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A BUILDING | 26 | 10 | 36 |
| B BUILDING | 28 | 18 | 46 |
| E BUILDING | 26 | 0 | 26 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPOT CONSULTANTS |
| Engineer | K P BADGUJAR CONSUTANTS PVT LTD |
| Chartered Accountant | S S DHERANGE & CO |
| Partner | Role in project |
|---|---|
| Aryavedant promoters & builders | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Nov 2024
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: form 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Form 1File: form 1.pdf | 6 Sep 2025 |
| Form 2File: form 2.pdf | 6 Sep 2025 |
| Form 3File: FORM 3.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold.pdf | 6 Sep 2025 |
| Other - TechnicalFile: FORM 4 a b e.pdf | 27 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT CERTIFICATE 1.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep 2022.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep 2021.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep 2021.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2020.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2022.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf | 7 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate_ palm spring A,B,E.pdf | 7 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: f3_compressed.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM-3 (A B E)JUNE-23_compressed.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (A B E)-DEC-23_compressed.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3-ABEJUNE-24_compressed.pdf | 3 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Adobe Scan 22-May-2024.pdf | 25 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 A,B,E Building Q2 FY 24-25_11zon.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: AB Sold Unsold QTR 2 FY 24-25 (1).pdf | 8 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AB Rera Engineer Site Supervisor Certificate Qtr 2 FY 24-25 (2).pdf | 8 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PALM SPRINGS A B D BILL.pdf | 9 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: palm spring ABE march qtr f1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cerificate Form2.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory ABE Rera.pdf | 1 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 ABE.pdf | 1 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FY 22-23 Form 5 ABE Rera (1).pdf | 8 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (ABE BUILDING)_compressed.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20) (1).pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: A B building Sold Unsold.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: plam springs October 23.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palm Springs ABE F2_compressed.pdf | 30 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 28-06-23 ABE.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (A B E)_compressed.pdf | 3 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Palm Springs A B E.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ab building.pdf | 17 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ABE Bldg.pdf | 8 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganesh nakhate Rera Letter AB building .pdf | 12 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palm springs A B And E_compressed.pdf | 12 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter .pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Palm spring_compressed.pdf | 11 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -2020-21.pdf | 23 Mar 2022 |
| Layout approvalFile: Layout plan (2).pdf | 28 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Layout plan (2).pdf | 28 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report_200226730401_For_Asset_Based_Search_28_12_2021_10_46_52_399.pdf | 28 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 28 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_compressed.pdf | 24 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _compressed.pdf | 24 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PALM SPRING A, B, E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Filed coordinates, straight-line distance. 269 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Aryavedant promoters & builders
Aryavedant promoters & builders has 4 registrations on MahaRERA, including PALM SPRINGS C WING and PALM SPRING A, B, E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that PALM SPRING A, B, E shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PALM SPRING A, B, E is delayed beyond 15 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALM SPRING A, B, E?
The registered promoter entity is Aryavedant promoters & builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALM SPRING A, B, E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PALM SPRING A, B, E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALM SPRING A, B, E?
The professionals named in the filing: Architect: SPOT CONSULTANTS; Engineer: K P BADGUJAR CONSUTANTS PVT LTD; Chartered Accountant: S S DHERANGE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALM SPRING A, B, E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback