ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / PALAVA AZZURRA A TO D

Completed No litigation declared Residential / Group Housing project

PALAVA AZZURRA A TO D

By PALAVA DWELLERS PVT LTD

RG-MH-43339 · RERA P51700019016 · Last updated on MahaRERA portal: 20 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 15 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
18 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

PALAVA AZZURRA A TO D is a Residential / Group Housing project by PALAVA DWELLERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700019016 on 28 Dec 2018. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NamePALAVA AZZURRA A TO D
  • TypeResidential / Group Housing
  • Location
    • KALYAN SHILPHATA ROAD
    • PALAVA
    • Khoni
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700019016
  • ReraGenie IDRG-MH-43339

Builder

  • NamePALAVA DWELLERS PVT LTD
  • Entity typeCompany
  • GSTIN27AAACL1490J1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsHITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK
  • Other registrations15 more →
  • Completed8 of 16
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2018PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Dec 2018
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AZZURRA ANA130000
AZZURRA BNA130000
AZZURRA CNA00000
AZZURRA DNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

AZZURRA A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
AZZURRA B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
AZZURRA C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AZZURRA D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 20 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Close ParkingYes100%
2 Wheeler ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,982 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
LODHA DEVELOPERS LIMITED-Mumbai City

Approvals and building plan

Permissible FSI23798.44
Proposed, not sanctioned8,888 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA MILLS COMPOUND

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PALAVA DWELLERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jul 2023

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Palava Azzura A TO d.pdf20 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Palava Azzura A TO d.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700019016 - Palava Azzurra A to D.pdf18 Oct 2024
Other - TechnicalFile: Decalartion Palava Azzura A to D.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palava Azzura A to D.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - PALAVA AZZURRA A TO D - P51700019016 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA AZZURRA A TO D - P51700019016 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Palava Azzurra A to D - P51700019016.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palava Azzura A To D - Form1 - Sep23.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Palava Azzurra A to D.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Azzura A TO D - March23.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: PALAVA AZZURRA A TO D - June23.pdf25 Jul 2023
Certificates of CA (Form 3)File: 37 PALAVA AZZURRA A TO D - Form3.pdf25 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC dated 30062023.pdf5 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 29 Azzurra A-D.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: Azzurra A -D.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 49 PALAVA AZZURRA A TO D.pdf12 Nov 2022
Details of encumbrancesFile: PALAVA AZZURRA A TO D.pdf17 Aug 2022
Certificates of CA (Form 3)File: 49 PALAVA AZZURRA - A TO D.pdf5 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 49 PALAVA AZZURRA - A TO D.pdf4 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 49 PALAVA AZZURRA - A TO D.pdf29 Jun 2022
Disclosure of sold/ booked inventoryFile: PALAVA AZZURRA A TO D.pdf27 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 PALAVA AZZURRA A TO D.pdf17 Dec 2021
Certificates of CA (Form 3)File: 49 PALAVA AZZURRA A TO D.pdf15 Dec 2021
Form 2AFile: 40 PALAVA AZZURRA A TO D.pdf18 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19_AZZURRA A TO D.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 87 PALAVA AZZURRA - A TO D.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 PALAVA AZZURRA A TO D.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: P51700019016.pdf14 Oct 2021
Certificates of CA (Form 3)File: 49 PALAVA AZZURRA - A TO D.pdf9 Oct 2021
Form 2AFile: P51700019016.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 89 Palava Azzurra A to D.pdf27 Oct 2020
Form 2AFile: Palava Azua A to D.pdf28 Aug 2020
Annual Audit Report of Statutory CA (Form 5)File: Palava Azzura A to D.pdf10 Oct 2019
Form 2AFile: AZZURRA A TO D.pdf17 Jun 2019
Copy of the legal title reportFile: Rev Title report as on 7 june-1-17.pdf7 Jun 2019
Copy of the legal title reportFile: Rev Title report as on 7 june-18-34.pdf7 Jun 2019
Details of encumbrancesFile: PALAVA AZZURRA A TO D.pdf25 Feb 2019
Proforma of Allotment letterFile: ATS Casa_Azzhuro_4_Jan_18_1_19.pdf4 Jan 2019
Proforma of Allotment letterFile: ATS Casa_Azzhuro_4_Jan_18_20_38.pdf4 Jan 2019
Building plan approvalFile: Plan 27.pdf12 Dec 2018
Building plan approvalFile: Plan 28.pdf12 Dec 2018
Building plan approvalFile: Plan 29.pdf12 Dec 2018
Building plan approvalFile: Plan 30.pdf12 Dec 2018
Building plan approvalFile: Plan 31.pdf12 Dec 2018
Building plan approvalFile: Plan 32.pdf12 Dec 2018
Building plan approvalFile: Plan 33.pdf12 Dec 2018
Layout approvalFile: Approved Layout.pdf12 Dec 2018
Building plan approvalFile: 8TH REFUGE FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Building plan approvalFile: GROUND FLOOR WING A B C D AZZURRA _ALLURA.pdf12 Dec 2018
Building plan approvalFile: TERRACE FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Building plan approvalFile: TYPICAL FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Copy of the legal title reportFile: Report on Title_Casa Azzurro and Casa Allura C_compressed.pdf12 Dec 2018
Details of encumbrancesFile: Encumbrances Palava Azzurra A to D.pdf12 Dec 2018
Copy of Layout Approval (in case of layout)File: Approved Layout.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 27.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 28.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 29.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 30.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 31.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 32.pdf12 Dec 2018
Building Plan Approval (IOD)File: Plan 33.pdf12 Dec 2018
Building Plan Approval (IOD)File: 8TH REFUGE FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Building Plan Approval (IOD)File: GROUND FLOOR WING A B C D AZZURRA _ALLURA.pdf12 Dec 2018
Building Plan Approval (IOD)File: TERRACE FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Building Plan Approval (IOD)File: TYPICAL FLOOR WING A B C D AZZURRA _ ALLURA.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 1.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 2.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 3.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 4.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 5.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 6.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 7.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 8.pdf12 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: 9.pdf12 Dec 2018
Declaration in FORM BFile: Form B Azzurra A to D PDPL.pdf12 Dec 2018
Certificates of CA (Form 3)File: FORM 3 AZZURRA A TO D.pdf12 Dec 2018
Proforma of Allotment letterFile: ATS_1_17.pdf12 Dec 2018
Proforma of Allotment letterFile: ATS_18_35.pdf12 Dec 2018
Proforma of Allotment letterFile: Allotment Letter Final.pdf12 Dec 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PALAVA AZZURRA A TO D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALAVA7,600+ in Thane

Builder: PALAVA DWELLERS PVT LTD

Palava Dwellers Pvt Ltd has 16 registrations on MahaRERA, including Orchid A to L and PALAVA AZZURRA A TO D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PALAVA AZZURRA A TO D is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALAVA AZZURRA A TO D?

The registered promoter entity is PALAVA DWELLERS PVT LTD, a company as per the filing. Its GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALAVA AZZURRA A TO D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PALAVA AZZURRA A TO D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in PALAVA AZZURRA A TO D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALAVA AZZURRA A TO D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALAVA AZZURRA A TO D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.