ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / KAPLESHWARA RESIDENCY

Registered No litigation declared Others project

KAPLESHWARA RESIDENCY

By KAPLESHWARA HOMES LLP

RG-MH-61631 · RERA P51700049543 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
19 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 55%
223 of 506Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

KAPLESHWARA RESIDENCY is a Others project by KAPLESHWARA HOMES LLP in Thane, Maharashtra, registered with MahaRERA as P51700049543 on 15 Feb 2023. Possession is promised by 31 Dec 2029. 283 of the 506 units on this registration are recorded sold or booked, and 19 of 33 construction stages are filed complete.

At a glance

Project

  • NameKAPLESHWARA RESIDENCY
  • TypeOthers
  • Location
    • Golavali
    • kalyan
    • Dawadi
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700049543
  • ReraGenie IDRG-MH-61631

Builder

  • NameKAPLESHWARA HOMES LLP
  • Entity typePartnership
  • PartnersVICKY PRAKASH KUKREJA, PRAKASH PANJUMAL KUKREJA, NAINA PRAKASH KUKREJA

Key dates

this monthRegisteredFeb 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed98 files

Current status

56%283 of 506 units booked
53.0%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA302616016176
BUILDING BNA312716010170
BUILDING CNA31271600160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 55%.

BUILDING A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
BUILDING B80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
BUILDING C32%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed714

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots714
Closed/Covered156
Open Space558
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A52186238
BUILDING B52186238
BUILDING C52186238

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,612 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2026
LandownerVillageDistrict
KUNAL DEVELOPERSMumbai CityMumbai City
FASHIBAI ASHOK PATILDawadiThane
JITENDRA ASHOK PATILDawadiThane
NANDU ASHOK PATILDawadiThane
POORNIMA ASHOK PATILDawadiThane
SANJAY ASHOK PATILDawadiThane
VISHNU RAJARAM PATILDawadiThane
SHREE RADHA DEVELOPERSMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI28836.03
Proposed, not sanctioned11,986 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR
Estimated costRs 125.00 cr
Cost incurredRs 66.25 cr
Work done53.0%
BuildingWingEstimatedIncurred
BUILDING ANARs 41.67 crRs 27.08 cr
BUILDING BNARs 41.67 crRs 27.08 cr
BUILDING CNARs 41.67 crRs 12.08 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVitan Consultants
EngineerAssociated Structural Engineers LLP
Chartered AccountantWatwani and Associates
PartnerRole in project
KAPLESHWARA HOMES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Annexure A Form 1 Architect Certificate.pdf17 Jun 2026
Withdrawal Update Form 1File: Architect Certificate.pdf17 Jun 2026
Withdrawal Update Form 1File: Architects Certificate.pdf17 Jun 2026
Withdrawal Update Form 1File: ArchitectS Certificate.pdf17 Jun 2026
Withdrawal Update Form 1File: Annexure A Form 1 Architect Certificate.pdf17 Jun 2026
Withdrawal Update Form 2File: Annexure B Form 2 Engineers Certificate.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf17 Jun 2026
Withdrawal Update Form 2File: EngineerS Certificate.pdf17 Jun 2026
Withdrawal Update Form 2File: Annexure B Form 2 Engineers Certificate.pdf17 Jun 2026
Withdrawal Update Form 3File: kapleshwara Q 4 Form 3 25-26 final.pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3 june signed_compressed.pdf17 Jun 2026
Withdrawal Update Form 3File: form 3 sep-25.pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3 KH LLP Dec 25.pdf17 Jun 2026
Withdrawal Update Form 3File: kapleshwara Q 4 Form 3 25-26 final.pdf17 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Arch.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B RCC.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed_compressed.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Arch.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B RCC.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anneuxre A FORM 1.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 KH Dec 24_compressed.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B FORM 2.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIGNED FORM 5.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-3-2024.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate as on 31-12-2023.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 Fy 2022-2023.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Fy 2022-23.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2023.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 30-09-2023_11zon.pdf18 Oct 2023
Layout approvalFile: Plan 1_compressed_11zon.pdf9 Oct 2023
Building plan approvalFile: Plan 2_compressed_1_11zon.pdf9 Oct 2023
Building plan approvalFile: Plan 3_compressed_2_11zon.pdf9 Oct 2023
Building plan approvalFile: Plan 4_compressed.pdf9 Oct 2023
Building plan approvalFile: Plan 5_compressed_3_11zon.pdf9 Oct 2023
Building plan approvalFile: Plan 6_compressed.pdf9 Oct 2023
Building plan approvalFile: Plan 7_compressed_4_11zon.pdf9 Oct 2023
Building plan approvalFile: Plan 8_compressed_5_11zon.pdf9 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 1_compressed_11zon.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_compressed_1_11zon.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3_compressed_2_11zon.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 4_compressed.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 5_compressed_3_11zon.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 6_compressed.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 7_compressed_4_11zon.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 8_compressed_5_11zon.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2023_organized.pdf7 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 30-06-2023_11zon.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 25TH FLOOR_11zon.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATE Compressed.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE Compressed.pdf10 Jul 2023
Proforma of Agreement for saleFile: 30 storey Agg Revised Rera Draft-2 on 7 July 23.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2023.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate for Proposed 30th floor.pdf27 Mar 2023
Proforma of Agreement for saleFile: 30 storey Agg Revised Rera Draft.pdf27 Mar 2023
Copy of the legal title reportFile: Legal Title report_compressed.pdf10 Feb 2023
Proforma of Agreement for saleFile: Rera Revised Agreement 06-02-2023.pdf9 Feb 2023
Layout approvalFile: Plan 01.pdf24 Jan 2023
Building plan approvalFile: Plan 02.pdf24 Jan 2023
Building plan approvalFile: Plan 03.pdf24 Jan 2023
Building plan approvalFile: Plan 04.pdf24 Jan 2023
Building plan approvalFile: Plan 05.pdf24 Jan 2023
Building plan approvalFile: Plan 06.pdf24 Jan 2023
Copy of Layout Approval (in case of layout)File: Plan 01.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 03.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 04.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 05.pdf24 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 06.pdf24 Jan 2023

How this compares with Thane

56%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAPLESHWARA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near kalyan7,600+ in Thane

Builder: KAPLESHWARA HOMES LLP

KAPLESHWARA HOMES LLP has 1 registration on MahaRERA, including KAPLESHWARA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KAPLESHWARA RESIDENCY is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAPLESHWARA RESIDENCY?

The registered promoter entity is KAPLESHWARA HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAPLESHWARA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAPLESHWARA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAPLESHWARA RESIDENCY?

The professionals named in the filing: Architect: Vitan Consultants; Engineer: Associated Structural Engineers LLP; Chartered Accountant: Watwani and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAPLESHWARA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAPLESHWARA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAPLESHWARA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.