Home / Browse projects / Thane, Maharashtra / Runwal Gardens Phase 3 Bldg No 27-28
Runwal Gardens Phase 3 Bldg No 27-28
By Runwal Residency Private Limited
RG-MH-28753 · RERA P51700026927 · Last updated on MahaRERA portal: 23 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 15 complaints at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
- Rs 790.00 crore secured on the land, in favour of Indusind BanK Ltd
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Runwal Gardens Phase 3 Bldg No 27-28 is a Residential / Group Housing project by Runwal Residency Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700026927 on 3 Nov 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 528 of the 625 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 15 complaints are on record with the regulator.
At a glance
Project
- NameRunwal Gardens Phase 3 Bldg No 27-28
- TypeResidential / Group Housing
- Location
- Village Gharivali usarghar and Sagoan
- Dombivli
- Kalyan
- Thane
- 421201
- Pincode421201
- RERA no.P51700026927
- ReraGenie IDRG-MH-28753
Builder
- NameRunwal Residency Private Limited
- Entity typeCompany
- CINU45400MH2011PTC212140
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsVijay Kisan Patil, Lucy Roychoudhury
- Other registrations17 more →
- Completed3 of 18
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Nov 2020
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2025)
- Buildings2 building records
- Documents filed149 files
Current status
Figures as on 23 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 27 | NA | 35 | 32 | 311 | 0 | 311 |
| Building No 28 | NA | 35 | 32 | 314 | 0 | 314 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.
Building No 2780%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Building No 2878%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 92% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 55% |
Progress on shared amenities15
As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | Yes | 0% |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 28 | NA | Rs 64.94 cr | Rs 55.23 cr |
| Building No 27 | NA | Rs 64.31 cr | Rs 57.66 cr |
| - | NA | Rs 36.46 cr | Rs 23.97 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Sandeep Prabhu for SAAKAAR |
| Architect | Precise Architects and consultants |
| Architect | Saakar Architects |
| Engineer | Chetan Sampat |
| Engineer | Uttam Kawathankar |
| Engineer | SHAILESH MAHIMTURA |
| Chartered Accountant | Bhatter & Company Chartered Accountants |
| Chartered Accountant | kshirsagar and associates |
| Chartered Accountant | M B AGARWAL AND CO |
| Chartered Accountant | KSHIRSAGAR & ASSOCIATES |
| Chartered Accountant | SINGHI AND CO |
| Partner | Role in project |
|---|---|
| Runwal Residency Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Promoter respectfully submits that the project was registered in November 2020, during the COVID-19 pandemic. The prolonged impact of the pandemic, including repeated lockdowns, severe labour shortages, supply-chain disruptions, and restrictions relating to health and safety, adversely affected construction progress. These circumstances were unforeseen and beyond the control of the Promoter. Further delays occurred due to non-performance and inefficiency of appointed civil contractors, resulting in termination, re-tendering, and engagement of new contractors, leading to substantial loss of
Complaints filed with MahaRERA15
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000375166 | Dr Siddhi Divekar | Runwal Residency Private Limited | 11/04/2023 |
| CC006000000292797 | Runwal Residency Private Limited | Arvind Shyamji Kanojia and Anr | 17/10/2022 |
| CC12503229 | Runwal Residency Private Limited | Mrs Shraddha Pankaj Parab | 12/09/2025 |
| CC12503589 | Runwal Residency Private Limited | Rajesh Rangnath Tiwari | 08/10/2025 |
| CC12504084 | Runwal Residency Private Limited | Mrs Kusum Ramesh Lakum | 19/11/2025 |
| CC12504085 | Runwal Residency Private Limited | Mr Aftab Alam Abid Ali Sayyad | 19/11/2025 |
| CC12601972 | Runwal Residency Private Limited | AAKASHINI PATHAK | 03/04/2026 |
| CC12603129 | Runwal Residency Private Limited | Yatin Jagdish Joshi | 26/05/2026 |
| CC12603135 | Runwal Residency Private Limited | Rekhabai Ravindra Sonawane | 26/05/2026 |
| CC12603191 | Runwal Residency Private Limited | Vinayak S Gawade | 28/05/2026 |
| CC12603425 | Amol Dashrath Utekar | Runwal Residency Private Limited | 04/06/2026 |
| CC12604403 | AAKASH BANSODE | Runwal Residency Private Limited | 15/07/2026 |
| CC12604925 | Rabindranath Sahu | Runwal Residency Private Limited | 04/08/2026 |
| CC12605004 | Pooja Mitesh Sahiware | Runwal Residency Private Limited | 06/08/2026 |
| CC12605003 | Dnyandev Jyotiba Dige | Runwal Residency Private Limited | 06/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed149
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A (2025-26) - Tower 27-28.pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 27-28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 27-28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 - 27-28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 - 27-28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 -27-28.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE 27-28.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 27-28 DEC 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: form 2 27-28 dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 19 Jan 2026 |
| Form 1File: Form 1 27 28.pdf | 20 Oct 2025 |
| Form 2File: Form 2 27 28.pdf | 20 Oct 2025 |
| Form 3File: Form 3 Tower 27 to 28.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 27 28 Inventory.pdf | 20 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration for Compliance RRPL final.pdf | 20 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 27 28.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: RRPL T27-28.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 27 28.pdf | 9 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 27 28.pdf | 9 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T27 to T28 RERA ENGINEERS CERTIIFICATE 30 06 2025.pdf | 9 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T27 to T28 RERA ENGINEERS CERTIIFICATE 30 06 2025.pdf | 9 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 9 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 9 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 RG Phase 3 blg no 27 28.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 T27 to T28 RERA ENGINEERS CERTIIFICATE 30 06 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Tower 27 to 28.pdf | 7 Oct 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 27 28.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27 to 28.pdf | 2 May 2025 |
| Form 1 27 28 25 04 25 | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 27 28.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T27 to T28 RERA FORM 2 ENGINEERS CERTIIFICATE 31 03 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27 to 28.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: done Form 1 27 28 31st December 2024.pdf | 3 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 27 to 28.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Done PH3 T27 to T28 RERA FORM 2 ENGINEERS CERTIIFICATE.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 27 28 31st December 2024 done.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27 to 28 done.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A NEW 2024-TW-27-28.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T27 to T28 RERA FORM 2 ENGINEERS CERTIIFICATE 30-09-2024.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -27-28.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Runwal Gardens Phase 3 Bldg No 27-28.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27 to 28.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RRPL TOWER 27-28 fORM-5 fy 23-24 Final_signed.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Format - Phase-3B.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -27-28 - June 24.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH3 T27 to T28 FORM 2.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27-28.pdf | 18 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RRPL Revised CC phase 8 dated 14 May 2024_11zon.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -27-28 - March 24.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 T 27 to 28.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27-28.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T27-28.pdf | 25 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower 27-28.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 27-28.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27-28.pdf | 21 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 27-28.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 27-28.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Tower 27-28 Form 5 FY 2022-23-min.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 27 -28.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27-28.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T27-T28.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T27-T28.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 27-28.pdf | 24 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase 3 - 27-28.pdf | 16 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Runwal Gardens - Form 1 - Tower 27-28.pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: INVEN 27-28.pdf | 22 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 BLDG NO 27-28.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 BLDG NO 27-28.pdf | 21 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Name Registation - Phase 3 Tower 27 to 28.pdf | 12 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Extension Certificate-Phase -3 Tower 24 to 30FINAL.pdf | 28 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 3 building 27-28 FORM 3 JANUARY.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Bldg 27-28.pdf | 30 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect build 27- 28_compressed.pdf | 22 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Bldg 27 to 28_compressed.pdf | 22 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Runwal Gardens Phase 3 T 27 28_compressed.pdf | 22 Oct 2022 |
| Details of encumbrancesFile: ENCUMB INDUSIND.pdf | 19 Aug 2022 |
| CERSAI detailsFile: CERSAI - Vistra.pdf | 20 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 17 other registrations, which the RERA portal never shows together
- All 149 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Runwal Gardens Phase 3 Bldg No 27-28 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivli7,600+ in Thane
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
AMBER ONE
AMBER BUILDCON
See every Thane project, with the district possession charts
Builder: Runwal Residency Private Limited
Runwal Residency Private Limited has 18 registrations on MahaRERA, including Runwal Gardens Phase I and Runwal Gardens Phase 2 Bldg no 18-23. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Runwal Gardens Phase 3 Bldg No 27-28 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Runwal Gardens Phase 3 Bldg No 27-28 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Runwal Gardens Phase 3 Bldg No 27-28?
The registered promoter entity is Runwal Residency Private Limited, a company as per the filing. Its CIN U45400MH2011PTC212140 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Runwal Gardens Phase 3 Bldg No 27-28?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Runwal Gardens Phase 3 Bldg No 27-28?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Runwal Gardens Phase 3 Bldg No 27-28?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Runwal Gardens Phase 3 Bldg No 27-28?
The professionals named in the filing: Architect: Ar. Sandeep Prabhu for SAAKAAR; Architect: Precise Architects and consultants; Architect: Saakar Architects; Engineer: Chetan Sampat; Engineer: Uttam Kawathankar; Engineer: SHAILESH MAHIMTURA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Runwal Gardens Phase 3 Bldg No 27-28?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback